If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

No. 46233 'Duchess of Sutherland'. Rugby to Bristol. 3rd Sept.,2015

Rasprava u 'What's Going On' pokrenuta od free2grice, 30. Kolovoz 2015..

  1. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,659
    Lajkova:
    3,689
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    What happens to a motorway road overbridge when it is built or updated? Do the contractors simply guess the height of the bridge and hope that a tall truck will not strike it? Can you imagine the uproar if the tallest of HGVs were stopped from passing a under a motorway overbridge because the contractors had failed to gauge the bridge to the correct standard height?
    A preserved steam locomotive is gauged to a specific maximum height so that it can run in safety on the national network. This is a waste of time if the railway is not maintained to the same exacting standard. <BJ>
     
  2. JDTTRAINS

    JDTTRAINS Member

    Pridružen(a):
    27. Listopad 2013.
    Poruka:
    582
    Lajkova:
    545
    Spol:
    Muškarac
    Interesi:
    Trainee Driver
    Grad:
    Bedfordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Was talking to the staff and train manager, they said we could have gone via Swindon on the down leg too, but, according to network rails books, she won't fit into Bath across the bridges over the river at either end of the station aswell :(
     
  3. JDTTRAINS

    JDTTRAINS Member

    Pridružen(a):
    27. Listopad 2013.
    Poruka:
    582
    Lajkova:
    545
    Spol:
    Muškarac
    Interesi:
    Trainee Driver
    Grad:
    Bedfordshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Quite heavy, everyone's been stropping all morning in coach J.
     
  4. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Pridružen(a):
    12. Rujan 2005.
    Poruka:
    10,176
    Lajkova:
    9,840
    Spol:
    Muškarac
    Grad:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    why do we assume height is the problem and not width or overhang on the buffer

    presumably the contractors / NR staff are given the envelope measurements that allow the core traffic flows to move without restriction so HST, 66's, 67's etc

    Duchess is a different beast, different overhang , at the bufferbeam, Cylinders , firebox shoulders etc . Modern lines are slewed closer to the platform edge to eliminate the gap however that can cause steam problems especially when you consider the natural movement from side to side
     
  5. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,740
    Lajkova:
    22,895
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is often the swept envelope created by the front bogie that causes an issue. Bath is on a tightish bend as well. Either way I guess we have to accept that a Duchess is a big un.
     
  6. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,209
    Lajkova:
    29,655
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If so, that is quite worrying - it implies that Network Rail are allowed to reduce network availability without going through the network change processes. My simplistic view is that if this had just been a like for like replacement, I would have expected that anything that could go through before could go through now. As an objective was to increase route availability, that goes double.
     
    free2grice and MikeParkin65 like this.
  7. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,430
    Lajkova:
    12,626
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Do you think NR are trying to Gauge Steam off the core routes? and onto secondary routes after all if you make it difficault to gauge anything but the day in day out stuff, then rail tours will only want to try to run what they know is not likily to change at the last moment, once the wires go live will steam be squeezed off the GW route anyway, as i would imagine FGW will want to use every availible path, to increase services, ?
     
  8. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,209
    Lajkova:
    29,655
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No, I don't. I think it's a sign that NR have lost sight of their role within the network, and that they are in crisis.
     
  9. mattspencer

    mattspencer Well-Known Member

    Pridružen(a):
    8. Srpanj 2005.
    Poruka:
    1,791
    Lajkova:
    659
    Grad:
    Rugby
  10. Steamage

    Steamage Part of the furniture

    Pridružen(a):
    14. Rujan 2005.
    Poruka:
    4,752
    Lajkova:
    1,129
    Grad:
    Oxford
    I understand that it's not just steam tours that are having trouble with the current NR gauging rules. One friend in the business said gauging has become "a monster that's out of control" since the 6-month rule came in - which NR imposed on themselves, let's remember. The only people that benefit are the gauging contractors...
     
  11. Yorkshire Exile

    Yorkshire Exile Member

    Pridružen(a):
    24. Veljača 2007.
    Poruka:
    331
    Lajkova:
    82
    Spol:
    Muškarac
    Interesi:
    Codger and retired trustee of A1SLT
    Grad:
    Jersey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe that is exactly what is going on.
     
  12. D1059

    D1059 Member

    Pridružen(a):
    25. Rujan 2008.
    Poruka:
    426
    Lajkova:
    320
    I am really worried about next weeks Sapperton jaunt after today's debacle. Swindon - Kemble is a section that has seen MAJOR loading gauge changes since the last time the Duchess went that way. I have absolutely no faith that NR have checked and certified that she will fit.
    Next Wednesday could be interesting again, but not for a good reason
     
    Last edited: 3. Rujan 2015.
  13. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    19,346
    Lajkova:
    17,834
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Its very odd, one would expect a contractor to be working to a specification that was laid down in the contract documents and that this would be checked before the completed project was accepted. So either a) NR are being allowed to change the envelope with little control or b) the contractors are not working to contract and handing back sites which do not meet the standard they did prior to works?

    Either way, WCR got a rightly deserved kicking about their systems and I hope that the new liaison process that is being led by ORR on the back of that issue provides the suitable forum for NR to get a similar shoeing (or at least explain publicly what they are up to?)
     
  14. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,740
    Lajkova:
    22,895
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ....plus a little bit of diesel it would seem.....:rolleyes:. Rather sad.
     
    KentYeti se sviđa ovo.
  15. KentYeti

    KentYeti Guest

    Yes, there was a rather heavy throb as the back of the train passed the camera.
     
  16. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,928
    Lajkova:
    22,452
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A diesel assisting a Duchess - how stupid can you get?
     
    99Z, green five, Big Al i 2 ostalih se sviđa ovo.
  17. KentYeti

    KentYeti Guest

    Not sure any of us have got firm evidence that is what is happening for sure? But could you blame them? My old view, "running 19th century technology in the 21st century".

    From where I sit I see the main line steam "industry" as rather fragmented with no obvious concerted voice.

    If there was a concerted voice maybe now would be the time to concentrate efforts to keep such as the Settle and Carlisle route permanently open to all steam operations. Have it "red lettered" as such in some way.

    And any other secondary routes where normal traffic levels are light.

    Don't know the network well these days so I can't name any others. If they exist.

    Can't see much alternative if "gauging" issues unchecked will eventually end most if not all main line steam.
     
  18. Spamcan81

    Spamcan81 Nat Pres stalwart

    Pridružen(a):
    25. Kolovoz 2007.
    Poruka:
    35,928
    Lajkova:
    22,452
    Interesi:
    Training moles
    Grad:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A friend of mine is an former NR project manager and has gone to a similar role with one of NR's contractors. From the tales he tells me you could write a book regarding NR and "specifications."
     
  19. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,659
    Lajkova:
    3,689
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder what excuse NR would use to prevent the Duchess running via Badminton and Bristol Parkway today.
    I'm sure that they would think of something. <BJ>
     
  20. KentYeti

    KentYeti Guest

    Yes, that was rather a shock to me as well!

    Pity it's not a VT train as we would most likely get an explanation here.

    Maybe the fare paying passengers today were given an explanation on the train? They are the ones who deserve it of course.
     

Podijelite ovu stranicu