If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

What did they do before 'Bustituton'

Тема в разделе 'Steam Traction', создана пользователем johnofwessex, 15 сен 2015.

  1. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.859
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think we are all familiar with replacement bus services at weekends due to engineering works.

    In Colin Maggs book on the Bristol - Radstock line he refers to a replacement bus service in the 1950's due to engineering work, but clearly in those days the buses and roads available made a poor substitute for rail in most cases.

    So, how did the railways deal with major works? Clearly there was single line working and they worked on lines in a way we would not tolerate today, but can anyone give more details as to how major line closures were dealt with?
     
  2. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Дата регистрации:
    15 апр 2006
    Сообщения:
    16.551
    Симпатии:
    7.897
    Адрес:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There were more alternative routes for through trains. I also think that far more resources were supplied to ensure that any line closures were as short as possible.
     
  3. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Another option was single line working.
     
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.803
    Симпатии:
    64.496
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Were there fewer closures? I'm just wondering - if you need to relay a line with CWR, you don;t have much option but to close for an extended period. Whereas with jointed rails, you can replace individual rails and sleepers between trains but basically keep the line open, albeit working at a lower speed.

    Just a theory ...

    Tom
     
  5. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer


    More crossovers and more sidings to let a train pass.
    I think operators in the US do this today.
     
  6. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.551
    Симпатии:
    11.955
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just got on with running a railway.
     
  7. ragl

    ragl Well-Known Member

    Дата регистрации:
    3 фев 2010
    Сообщения:
    1.797
    Симпатии:
    1.934
    Пол:
    Мужской
    Род занятий:
    Consultant Engineer
    Адрес:
    Shropshire
    Small typo niggle, I think that the spelling should be - "Bustitution".

    Cheers,

    Alan
     
  8. LesterBrown

    LesterBrown Member

    Дата регистрации:
    20 янв 2009
    Сообщения:
    995
    Симпатии:
    761
    Адрес:
    Devon
    I do recall reading of accidents involving removed rails. IIRC Charles Dickens was a passenger on a boat train where the ganger mis-read the timetable of this train which varied with the high tide time and ran through repair works.

    No doubt such procedures became safer with absolute block working but as suggested I suspect prolonged closures only came in with welded joints. The closure for the re-gauging of the west of England lines seemed to have been regarded as something exceptional.

    Sent from my SM-G900F using Tapatalk
     
  9. 22A

    22A Well-Known Member

    Дата регистрации:
    8 сен 2005
    Сообщения:
    1.105
    Симпатии:
    99
    Род занятий:
    Administrator
    Адрес:
    Between 31F & 34E
    There were also far more ticket route options. I read in an article by a retired BR Ticket Inspector that a Kings Cross - Leeds return would require you to travel North on the ECML, but if necessary, (and only if necessary),you were allowed to divert.
    Leeds - Manchester - Wrexham - Paddington was permitted!
     
    Martin Perry нравится это.
  10. Jimc

    Jimc Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.117
    Симпатии:
    4.821
    Род занятий:
    Once computers, now part time writer I suppose.
    Адрес:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The footplate reminiscences books seem to talk about a lot of single line working.
     
  11. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Apart from more alternative routes on which to divert services, bear in mind that back in the 1950's at least, many trunk routes had minimal services on Sunday, People by and large did not travel on Sunday, unlike today's "seven day" railway. So closing a line on Sunday for essential engineering work was not going to inconvenience all that many travellers.
     
  12. Forestpines

    Forestpines Well-Known Member

    Дата регистрации:
    5 июн 2009
    Сообщения:
    1.681
    Симпатии:
    2.438
    Пол:
    Женский
    Адрес:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But that's similar to today, surely - if there are major issues tickets will be accepted by unusual routes.

    Even on a normal day, a London-Leeds open ticket is valid back to Kings Cross via the ECML, or via Lincoln and/or Cambridge, or to St Pancras.
     
  13. Spamcan81

    Spamcan81 Nat Pres stalwart

    Дата регистрации:
    25 авг 2007
    Сообщения:
    35.836
    Симпатии:
    22.279
    Род занятий:
    Training moles
    Адрес:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I travelled regularly on Sundays in the 70s and diversions were common as was single line working. In fact half the fun of some journeys was the weird and wonderful diversions. Checked off many a freight only route while travelling on service trains.
     
    athelney нравится это.
  14. 99Z

    99Z Guest

    deleted
     
    Last edited by a moderator: 8 ноя 2015
    TonyMay, Bramblewick и johnnew нравится это.
  15. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    Дата регистрации:
    24 мар 2006
    Сообщения:
    8.383
    Симпатии:
    5.368
    Пол:
    Мужской
    Род занятий:
    Freelance photo - journalist
    Адрес:
    Southport
    Just to show how much flexibility existed ; in 1964 I wanted to travel from Leicester to Edinburgh and I calculated at least 64 different routes which were valid with my return ticket. Not only does that indicate the routeing flexibility but also the ticketing flexibility which no longer exists on the modern network !
     
  16. ilvaporista

    ilvaporista Part of the furniture

    Дата регистрации:
    16 янв 2006
    Сообщения:
    4.356
    Симпатии:
    5.455
    Пол:
    Мужской
    Род занятий:
    C.Eng
    Адрес:
    On the 45th!
    Not to mention risk assessments, environmental impacts and all of the other 'helpful' hangers on that are associated with any project thesedays.
     
  17. threelinkdave

    threelinkdave Well-Known Member

    Дата регистрации:
    1 авг 2013
    Сообщения:
    2.065
    Симпатии:
    1.240
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    buses were used but usually limited to a couple or three stations. Virtually every station had a crossover road so trains could be turned back either side of works, which made sence. Even in the 80s at Staplehurst in Kent the stopper ran Charring Cross - Staplehurst. Bus to Headcorn. Shuttle train Headcorn - Ashford. Now they close the whole route Tonbridge - Ashford.

    There were some modern outfits which got it right, the much missed Wrexham and Shropshire. The direct route via Teford was blocked and buses used. However W&S had other ideas and advertised direct servis to Shrewsbury. How did they do it? We went Wolverhampton - Stafford (pass) Crew (pass) - Wrexham and all stations to Shrewsbury in reverse order.
     
  18. peckett

    peckett Member

    Дата регистрации:
    26 сен 2006
    Сообщения:
    947
    Симпатии:
    623
    Are you sure this wasn't a all lines rail rover.I think 30 miles down the line at Kettering there was about 4.
     
  19. johnnew

    johnnew Member

    Дата регистрации:
    2 ноя 2007
    Сообщения:
    656
    Симпатии:
    124
    Род занятий:
    PRO The Stephenson Locomotive Soc.
    Адрес:
    Dorset, UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They even used horse drawn coaches. Did a talk on the former London & Southampton route recently and horse drawn bustitution was used during construction of IIRC the Winchester - Basingstoke section as the bits either side were already running trains,


    Sent from my iPad using Tapatalk
     

Поделиться этой страницей