Riley Relocation Statement - ELR

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Foxfield_Rich, 23 окт 2015.

  1. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    Unless and until a statement from either party about the longer term for the new or any other premises is made, achieving the rail connection aspect is only speculation.
    The information we do have is that a phased approach is being taken and to some extent it may be a case of sensibly seeing how things evolve naturally. Nothing to fret about, just different from the way things have been.
    ELR has an equally big task to establish its own engineering facility which will absorb resources too.
     
  2. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Interesting to see on the images of the inside of the new premises that an overhead crane track is already in situ.

    46118
     
    Last edited: 25 окт 2015
  3. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    The statement in the OP in this thread says Rileys are "pursuing opportunities to establish a modern, purpose built works with rail access that will allow us to consolidate all of our activities on one site". Ian Riley's post on the Works forum also implies leasing the Heywood site is an interim solution.
     
    Last edited: 27 окт 2015
  4. John Petley

    John Petley Part of the furniture

    Дата регистрации:
    8 окт 2007
    Сообщения:
    2.958
    Симпатии:
    2.549
    Пол:
    Мужской
    Род занятий:
    Researcher/writer and composer of classical music
    Адрес:
    Between LBSCR 221 and LBSCR 227
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It will be interesting to see what happens to the other locos on which work is currently being undertaken. For instance, is the plan for 45212 and 47298 also to be completed before the relocation?
     
  5. ghost

    ghost Part of the furniture

    Дата регистрации:
    29 май 2006
    Сообщения:
    4.341
    Симпатии:
    5.850
    Пол:
    Мужской
    Адрес:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    45212 is having an official steam test this Thursday so it's quite possible that she could be completed before the move. I think the Jinty is much further away from completion.

    Keith
     
  6. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    The later comments in the thread seem to be inferring the move is indeed interim, pending a purpose built works with rail connection elsewhere.
     
    Adam-Box нравится это.
  7. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
    For those who aren't on the works forum, these are the pics of the Heywood workshop posted up by Ian Riley
    IMG_2392.JPG IMG_2399.JPG IMG_2401.JPG
     
  8. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    61648 нравится это.
  9. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
    Only:
     
    26D_M нравится это.
  10. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    That reads pretty unequivocal - temporary works while a new rail connected one gets built.
    The order book must be getting full that the current place is too small to hold off while it gets built.
     
    jnc нравится это.
  11. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    There is also the little matter that the ELR previously gave them notice to quit, because of their own plans for the site. Good to hear that a compromise has been reached allowing Rileys' operational fleet to stay a while longer.
     
    jnc нравится это.
  12. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    Appears to be a mutual need to expand the respective business operations in that case. One can only wish them both well with potentiality exciting growth ahead.
    It will be interesting to see how much of the present works stays at Bury in order to maintain the working locos until the rail connection can be established. Assume this will include 60103 for the next couple of years as well as the 3 fives.
     
  13. 46118

    46118 Part of the furniture

    Дата регистрации:
    16 сен 2005
    Сообщения:
    4.043
    Симпатии:
    212
    Ian Riley has confirmed on "the Works" that these premises are an interim solution while purpose-built premises are developed.

    46118
     
  14. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    Despite the old adage there must be more profit in loco ownership than generally thought. Second purpose built loco works of recent times on the horizon - boom time!
     
  15. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
    Presumably the profit is to be found in enabling other people's loco ownership ;)
     
    Yorkshire Exile, Chris86, ghost и 3 другим нравится это.
  16. Southernman99

    Southernman99 Member Friend

    Дата регистрации:
    10 ноя 2009
    Сообщения:
    956
    Симпатии:
    723
    The one location I am surprised that hasnt been mentioned is the old CWR yard at Castleton. Whether IR had the oppurtunity to aquire the site or have NR kept the site as a "strategic rail site"
    I know the ELR are looking at establishing an interface with NR at Castleton but surely the yard would be a big enough site to house a new, purpose built engineering facility and a 2 platform ELR station.
     
  17. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    "other people" in sufficient additional number will need to meet the rates and rental on the stop gap as well as contribute to the costs of the later purpose built place. Maybe Rochdale council is able to assist with tax benefits if it helps get the prestigious 'Flying Scotsman engineers' into the borough.
     
  18. Corbs

    Corbs Well-Known Member

    Дата регистрации:
    17 июл 2008
    Сообщения:
    1.719
    Симпатии:
    763
    Plus the actual cost of the move itself, and the hiatus in work while the two moves take place. No doubt its a big job!
     
  19. 26D_M

    26D_M Part of the furniture

    Дата регистрации:
    22 окт 2009
    Сообщения:
    4.416
    Симпатии:
    1.681
    Maybe because of the nature of work public grant funding could be available to offset the costs and support growth of a niche enterprise?
     
  20. Ian Riley

    Ian Riley Part of the furniture Loco Owner

    Дата регистрации:
    18 июн 2005
    Сообщения:
    2.418
    Симпатии:
    470
    No job too big for the lads at Rileys...all planned and ready to execute...........as well as our commitments with our, and our customers locos and work.
     