    We can spend millions achieving W10 or W12 gauge but seem to be losing it at the platform edge. I'm surprised that the gap between train and platform is regarded as such a problem having regard to obesity levels.
     
  2. Greenway

    Greenway Part of the furniture

    Joined:
    Mar 16, 2008
    Messages:
    4,019
    Likes Received:
    3,804
    Gender:
    Male
    Location:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But, it has to be remembered that obese folks often are unable to see their feet!!
     
  3. david1984

    david1984 Resident of Nat Pres

    Joined:
    Sep 13, 2005
    Messages:
    12,910
    Likes Received:
    1,387
    Gender:
    Male
    Location:
    Birmingham
    Can anyone explain why instead of moving the track/platform and creating all kinds of mayhem, why new trains are not specified with wider steps to bridge "the gap" that way ?, if gauging away from platforms is an issue for that then havd foldaway step types like 390 and 220/221 do, the Nene Valley has done this to it's Mk1 set with the wider clearances the Berne Gauge has created, I suspect even then it would be cheaper to retro fit such steps to existing stock than fanny about slewing trackwork with a required posesssion.
     
  4. John Stewart

    John Stewart Part of the furniture

    Joined:
    Sep 22, 2011
    Messages:
    4,206
    Likes Received:
    2,072
    Gender:
    Male
    Occupation:
    Retired
    Location:
    Hilton, Derby
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suspect that it's a chicken and egg problem. One couldn't start to fit extension steps until all the gaps had been widened and as such work progressed the gap risk would worsen. Of course, when both the gap and the step programme was completed, one could start to build wider coaches. I'm afraid that it sounds like 10 years for the first part and another 40 for the second!
     