If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

9F Locomotives - Restrictions on Network Rail

Discuție în 'Steam Traction' creată de A1X, 4 Noi 2015.

  1. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting:
    Taking the Position of the forward driving wheel becoming the rearward bogie as a datum and leaving the boiler untouched ...Then a new front frame section including the internal stretchers would have to be designed to merge the Bogie carrying components. At first glance the Smokebox would have to be shortened or it would project rather more than other standards. In terms of design work I feel that this is a more complex task than a 2-8-2 conversion ., but in terms of execution its all mechanical. The downside of the 2-8 -2 is that the. Firebox end of the boiler would need to be rebuilt; The equivalent part of the clan boiler would be a good fit; but has 10% less Grate area and is designed at 225PSI, so some highly specialised work would be required there to upgrade that design . You could probably leave the cylinders alone on a 480, it would be prudent to line up the cylinders to 19.5 on the 282
     
  2. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    It's about 7-9 minutes running time between stations and certainly if you're stopping at all of them, I agree the saving wouldn't be much. At present the round trip takes about an hour and a quarter including running round at the far end, which is probably about right for most visitors. However the question is whether people would accept a more-than-doubling of the journey time to do the full round trip between Leicester and Ruddington, or whether they might only opt to go half way, and whether reducing journey times might influence that. However there are other things (like pricing the all-day rovers competitively) which could equally encourage people to spend longer with us, so it's not as if a speed increase is the only solution - in fact at present I'd say it was pretty unlikely.
     
  3. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Don't forget weight... There would be rather a lot of weight on the new front bogie as it would have to share the weight from the driving wheel and pony truck. I suspect you'd have to build new frames and rods and move the remaining driving wheels. I haven't spotted a weight diagram for the 9F, but it seems possible at least the first two wheel sets would need to move forward.

    Why would you need a firebox rebuild for the 2-8-2, I'm not quite clear about that. Would you not be able to get away with ashpan changes? Again though wouldn't weight distribution be an issue?
     
  4. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Taking the Brit as an example the Bogie carries 17 T 2 C,
    On the 480 with the appropriate considerations the weight on the bogie, not including the additional weight of the bogie itself would be about 16 T with about 17.5 - 18 T per driving axle

    Sorry I'm assuming you'd follow the Style of other BR Standards, and the dimensions of the rear extension frames and truck just wouldn't work
    , could use an LNER type cartazzi ?
     
  5. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah, found a weight diagram for the 9F.
    9-4 on the leading wheels, 15-10 on all the driving wheels.
    Taking as a first approx that weight of bogie, supporting gear and bogie wheel set approximates to weight of pony truck, leading drivers and rods then the leading bogie would have to support around 24-14, so a good deal more than the Brittania.
    Another issue is that if you reduce the 9f to 8 coupled the factor of adhesion goes from a very healthy 4.38 to a decidely skittish 3.5. So you have to rebalance the whole Loco to get more weight on the driving wheels.
    Mind you if you removed the centre driving wheels and replaced them with a jackshaft [grin]. I make that 19-8 on the driving wheels, which shouldn't be impossible RA.

    9f280.jpg

    Doesn't look too bad from a distance does it??
     
    staffordian și 99Z apreciază asta.
  6. John Stewart

    John Stewart Part of the furniture

    Înscris:
    22 Sep 2011
    Mesaje:
    4.206
    Aprecieri primite:
    2.072
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Hilton, Derby
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As long as the power is there, never.
     
  7. 99Z

    99Z Guest

    deleted
     
    Last edited by a moderator: 29 Dec 2015
  8. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.072
    Aprecieri primite:
    5.361
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not so. There are many locos of similar power outputs but which look very different, and indeed are of different classes. The LNER in particular was fond of modifying existing locos for different purposes. They took the trouble to reclass them, though.
     
  9. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    For what it's worth, a 9F stops being a 9F when you put a Crosti boiler on it...
     
  10. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.072
    Aprecieri primite:
    5.361
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please don't suggest a new build...
     
  11. NeilL

    NeilL Well-Known Member

    Înscris:
    30 Mar 2012
    Mesaje:
    2.030
    Aprecieri primite:
    1.522
    Ocupație:
    Retired & OAPWay & tree feller
    Locație:
    Staffordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well, -- a new build ? The 9F 2-10-0s have (very) limited route availability. What about a 2-8-2? Ah - that is already being done at Darlington and Doncaster
     
  12. 22A

    22A Well-Known Member

    Înscris:
    8 Sep 2005
    Mesaje:
    1.105
    Aprecieri primite:
    99
    Ocupație:
    Administrator
    Locație:
    Between 31F & 34E
    A youtube post of a 9F on the mainline in 1988 shows what we are missing.
     
  13. johnnew

    johnnew Member

    Înscris:
    2 Noi 2007
    Mesaje:
    656
    Aprecieri primite:
    124
    Ocupație:
    PRO The Stephenson Locomotive Soc.
    Locație:
    Dorset, UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think all of us old enough to remember them either flogging a heavy freight uphill or seeing them on passenger workings knows that. However time to move on like the infrastructure designs they can't run on. The cash either needs to go into something awesomely practical for the modern railway as a new design/build (not a replica) or into restoring something old. Bulleid was right in concept with Leader (if flawed in design), perhaps a garrett, a mallet type or the 5AT. A 9F bodged and adapted for the mainline a non-starter for me.

    My main memories of 9Fs the Fawley oil trains of 50+ restarting up the SW main line out of Allbrooke loop and Evening Star on the Scarborough Spas, can't happen again, time to move on.


    Sent from my iPad using Tapatalk
     
    Sawdust apreciază asta.
  14. maddog

    maddog New Member

    Înscris:
    7 Apr 2011
    Mesaje:
    194
    Aprecieri primite:
    89
    These threads about 9Fs on network rail are both fascinating, and infuriating in equal measure.
    Unless you are in ownership or linked to the ownership of a 9F and have or able to obtain plenty of cash to carry out these modifications then suggesting to do so is pointless, but conversely the arguments set out to modify 9Fs and how they may be modified to suit presumed conditions, and in turn learning more about the 9F is really very interesting.
     
    johnnew și paulhitch apreciază asta.
  15. 99Z

    99Z Guest

    deleted
     
    Last edited by a moderator: 29 Dec 2015
  16. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.734
    Aprecieri primite:
    11.851
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Which railway can run at 50 mph?
     
  17. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    GCR can run steam at 60 for testing purposes when the line is otherwise closed, but as to the answer to your question, I don't know precisely what the restrictions are. But I suspect a photo charter would not count as "testing".


    Sent from my iPhone using Tapatalk
     
  18. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.734
    Aprecieri primite:
    11.851
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Are you sure that they can? As distinct from have.
     
  19. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    Well I'm not aware of anybody imposing restrictions so unless you know something I don't...
    That said the 10mph TSR on Swithland viaduct would probably scupper things for the moment. But it's being fixed.


    Sent from my iPhone using Tapatalk
     
  20. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.734
    Aprecieri primite:
    11.851
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't 'know' anything, only what I'm told but I'd be interested to see a bit of paper that says they can, as distinct from a bit of paper that says they could. There's a subtle difference. That's not to say that they can't take the necessary steps to allow running at speeds in excess of 25 mph. Have a look at ROGS and the Railway Safety Regulations 1999. Thee regs do not exclude testing and the GCR doesn't have any exemptions, according to the ORR website.
     

Distribuie pagina asta