If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Frome To Radstock Reopening (Again)

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем johnofwessex, 22 янв 2016.

  1. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With a bit of political will you could connect Radstock and Bath, as the line is technically clear through Wellow and down the Two Tunnels, but it'd take capital. The Frome - Radstock project would be much much easier, but as you say has no commercial benefit at all
     
  2. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.859
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    AFAIK there was a proposal post WW2 to link the SDJR to the Limpey Stoke branch at Midford then SDJR trains could use Bath Spa

    It would get over the 'Tunnels' issue and link trains direct into the main line
     
  3. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.564
    There was also a plan to divert the branch from mangotsfield into Bath Spa.
     
  4. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.859
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Are those proposals on t'internet anywhere?
     
  5. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.564
    Not that I can find, but I remember reading about it pre-internet.
     
  6. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That'd never work now though, I don't imagine there is enough traffic from Radstock to justify the additional pressure on the Heart of Wessex Line, or whatever they call it now after Westbury (toward Bath).

    Surely just cross what is now the Newton St Loe SSI, over the Avon? Not that difficult at all.
     
  7. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.564
    Well there would have been a bit more to it than that as you would have had to divert the S&D as well and build a bigger station.
     
  8. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah I assumed this precluded the S&D, as you only mentioned the Mangotsfield Branch.
     
  9. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.564
    Well there would have been little point in doing one without the other, I guess. However despite a search I can't find anything online about the plans, which I don't think got beyond the wouldn't it be a good idea if..... stage.
     
  10. Forestpines

    Forestpines Well-Known Member

    Дата регистрации:
    5 июн 2009
    Сообщения:
    1.681
    Симпатии:
    2.438
    Пол:
    Женский
    Адрес:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That would in theory have been dead easy, as the two lines come very close together in the narrow part of the valley between Saltford and Twerton.

    Until a few months back I worked in Bath with colleagues from Radstock and Wells; and almost daily they wished there were better rail connections southwards. The train services that there are into Bath are at capacity at rush hour - to the extent that if any run with just one carriage less, people get left behind on platforms.

    (One colleague from Westbury resorted to jogging home some days! Not everyone is a marathon runner though.)
     
    SpudUk нравится это.
  11. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Oh yes that's happened to me!
     
  12. dampflok

    dampflok Member

    Дата регистрации:
    8 дек 2009
    Сообщения:
    205
    Симпатии:
    21
    Пол:
    Мужской
    Род занятий:
    Nurse,Qualified Ward Manager now retired
    Адрес:
    Nuertingen,Germany
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I read about the plans too but I can't remember whether they were in the Railway Magazine or the S&D Telegraph. Basically the plan was to link to Mangotsfield line to the GW mainline ,build a new 4 platform station on the site of Bath goods . Then a new tunnel would have been built Southeast of Bath Spa station with the junction at the east end of the platforms . The new line would have linked up with line towards Freshford with a new railway being built to link up with the S&D just south of Midford viaduct .. The Midland line into Bath Green Park ,the S&D to Midford and the GW line from Bathampton towards Freshford would have been closed along with Bath Spa station . The war put an end to the plans . I hope this information is of some help .
     
    SpudUk нравится это.

Поделиться этой страницей