If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

42424 - New Build Fowler Tank

本贴由 steam_mad2015-05-21 发布. 版块名称: Steam Traction

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,028
    支持:
    65,609
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    <BlatantPlug>I think 32424 will be finished first - you could always ask to borrow that for a gala and engage in a spot of clandestine renumbering!</BlatantPlug>

    Tom
     
  2. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,818
    支持:
    12,016
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wouldn't be as good, though........;)
     
    已获得Gav106的支持.
  3. jtx

    jtx Well-Known Member

    注册日期:
    2007-07-04
    帖子:
    1,868
    支持:
    855
    性别:
    职业:
    Happily retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am sure it will, Tom, give their respective stages of development. If I ever get a chance to drive that beauty, my cup will truly runneth over!
     
  4. paulhitch

    paulhitch Guest

    Another poster wonders, quite rightly, about the relevance of this divergence from the original topic. However, having got here. can I just say that aero engines, even in wartime, were cosseted to a degree unheard of in a loco. shed. They were carefully warmed up and rebuilt after a set number of flying hours. According to two sources ( one to me personally , an R.N. Engineer Commander, and another an R.A.F. mechanic recounted by his son) sleeve valve aero engines were a pain in the botty! Bulleid could and should have found out. This is not, however, the way dabblers work.

    PH
     
    已获得LMS2968的支持.
  5. Romsey

    Romsey Part of the furniture

    注册日期:
    2007-07-14
    帖子:
    3,896
    支持:
    1,883
    性别:
    职业:
    Retired SPM
    所在地:
    Close to Bridge 200
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That agrees with my fathers view that that the RR Merlin engine was vastly easier to work on than the Bristol Centaurus engine. Also front line bomber squadrons used unit replacement changing engines or turbo chargers with refurbished examples to provide maximum aircraft availability. I think he said an engine change on a Lancaster took 6 or 7 hours plus ground and air testing.

    Cheers, Neil
     
  6. andrewshimmin

    andrewshimmin Well-Known Member

    注册日期:
    2011-03-18
    帖子:
    1,772
    支持:
    2,178
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is sometimes essential in engineering to test something to show it is really a bad idea. Mr Bulleid played this important role.
     
    已获得LMS2968的支持.
  7. paulhitch

    paulhitch Guest

    Sorry, it had already been tested and found to be a bad idea in the commercial world.

    Paul H
     
  8. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    注册日期:
    2006-04-15
    帖子:
    16,552
    支持:
    7,905
    所在地:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite so; a Napier Sabre aero engine did about 25 hours service between major overhauls, less if emergency boost had been used a lot.
     
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,028
    支持:
    65,609
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, though Bulleid tested the sleeve valve idea by modifying H1 Atlantic "Hartland Point", and an objective view of that loco, following considerable period of running, should have made it clear that it had higher coal and water consumption, suffered valve gear breakages while in service and on a number of occasions contrived to get stuck in a position such that it would not start in either direction. Despite that, the Leader project went ahead...

    Tom
     
    已获得andrewshimminpaulhitch的支持.
  10. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    注册日期:
    2007-04-14
    帖子:
    4,033
    支持:
    1,101
    职业:
    A Thingy...
    Mainly because I don't think the trial results were fully analysed before the Board rushed into ordering them.
     
  11. Kinghambranch

    Kinghambranch Well-Known Member

    注册日期:
    2006-12-20
    帖子:
    1,881
    支持:
    1,619
    性别:
    职业:
    Retired
    所在地:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed, and, for those who aren't quite sure what one looks like, here is a rare survivor bolted onto one of its main users, the Hawker Typhoon (RAFM Cosford).
    20140415-10-Hawker Typhoon 1b MN235 in Conservation Centre.JPG
     
  12. paulhitch

    paulhitch Guest

    S.A.C.Martin surely has a point here in contrasting the lambasting given to Thompson (IMHO possibly rightly) with the excuses made for Bulleid (IMHO probably over generously). Once again sorry for thread divergence!

    PH
     
    已获得S.A.C. MartinMartin Perry的支持.
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    28,028
    支持:
    65,609
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An engine so powerful the damn thing could even fly without wings :)

    Tom
     
    已获得Kinghambranch的支持.
  14. Enterprise

    Enterprise Part of the furniture

    注册日期:
    2005-09-09
    帖子:
    5,487
    支持:
    3,320
    The debate about the advantages and disadvantages of poppet valves and sleeve valves in aircraft engines is far more nuanced than the facile hearsay reported in this thread. As an elementary starting point anyone interested could start by reading Fedden - The Life of Sir Roy Fedden.
     
    已获得andrewshimmin的支持.
  15. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    29,204
    支持:
    29,647
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For those of us in need of a very brief primer, and without ready access to a library copy, please could you provide a brief pointer to the key issues.

    Sent from my GT-N8010 using Tapatalk
     
  16. Gav106

    Gav106 Well-Known Member

    注册日期:
    2010-03-29
    帖子:
    1,772
    支持:
    2,171
    所在地:
    Nantwich, Cheshire
    For a second I looked on Nat pres and thought people were interested in the Fowler 2-6-4 tank.....

    No real updates to be said about it at the moment. As you can imagine all our efforts are being pumped into the Patriot, however if there is anyone who isn't particularly interested in that loco but would want to be part of the build of the tank please do get in contact.
     
  17. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    注册日期:
    2007-04-14
    帖子:
    4,033
    支持:
    1,101
    职业:
    A Thingy...
    What I was getting at was that it seems the results coming from Hartland Point (ie. don't use sleeve valves on a steam locomotive) weren't really applied to the main design. This can probably be attributed to two things: Bulleid wanting to plough on regardless (likely), and the pressure provided by the SR Board in placing an order for a fleet (equally likely). Anyway, back to Fowler...
     
  18. Cartman

    Cartman Part of the furniture

    注册日期:
    2015-12-14
    帖子:
    2,864
    支持:
    2,205
    性别:
    职业:
    Van driver
    所在地:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Back to Fowler - its a nice loco and I look forward to seeing it. It was just what the Southern could have done with, instead of wasting money on the Leader :)
     
    已获得LesterBrown的支持.
  19. LMS2968

    LMS2968 Part of the furniture

    注册日期:
    2006-09-01
    帖子:
    3,083
    支持:
    5,393
    性别:
    职业:
    Lecturer retired: Archivist of Stanier Mogul Fund
    所在地:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure. The Southern had a very capable 2-6-4T of their own, but it didn't like their permanent way. Would the LMS version do any better?
     
  20. Johnb

    Johnb Nat Pres stalwart

    注册日期:
    2014-12-03
    帖子:
    15,678
    支持:
    18,652
    性别:
    职业:
    Retired, best job I've ever had
    所在地:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Southern seemed to get a bit paranoid about using tank locos for high speed passenger work after the River Class derailment. The W Class 2-6-4Ts were allocated to the two local sheds to where I spent my spotting years, Hither Green and Norwood Junction and spent their time plodding around with transfer freights from North London and were never seen on passenger trains. This is not surprising as I don't think Norwood Junction had regular passenger turns and Hither Green only had one, a commuter train from Cannon Street for which it always kept its only King Arthur in pristine condition.
    It would have been interesting to see how the Ws performed in comparison to the LMS and Standard tanks on passenger work.
     

分享此页面