If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

42424 - New Build Fowler Tank

الموضوع في 'Steam Traction' بواسطة steam_mad, بتاريخ ‏21 ماي 2015.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,458
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    <BlatantPlug>I think 32424 will be finished first - you could always ask to borrow that for a gala and engage in a spot of clandestine renumbering!</BlatantPlug>

    Tom
     
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wouldn't be as good, though........;)
     
    أعجب بهذه المشاركة Gav106
  3. jtx

    jtx Well-Known Member

    إنضم إلينا في:
    ‏4 جويلية 2007
    المشاركات:
    1,868
    عدد المعجبين:
    855
    الجنس:
    ذكر
    الوظيفة:
    Happily retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am sure it will, Tom, give their respective stages of development. If I ever get a chance to drive that beauty, my cup will truly runneth over!
     
  4. paulhitch

    paulhitch Guest

    Another poster wonders, quite rightly, about the relevance of this divergence from the original topic. However, having got here. can I just say that aero engines, even in wartime, were cosseted to a degree unheard of in a loco. shed. They were carefully warmed up and rebuilt after a set number of flying hours. According to two sources ( one to me personally , an R.N. Engineer Commander, and another an R.A.F. mechanic recounted by his son) sleeve valve aero engines were a pain in the botty! Bulleid could and should have found out. This is not, however, the way dabblers work.

    PH
     
    أعجب بهذه المشاركة LMS2968
  5. Romsey

    Romsey Part of the furniture

    إنضم إلينا في:
    ‏14 جويلية 2007
    المشاركات:
    3,868
    عدد المعجبين:
    1,849
    الجنس:
    ذكر
    الوظيفة:
    Retired SPM
    مكان الإقامة:
    Close to Spike Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That agrees with my fathers view that that the RR Merlin engine was vastly easier to work on than the Bristol Centaurus engine. Also front line bomber squadrons used unit replacement changing engines or turbo chargers with refurbished examples to provide maximum aircraft availability. I think he said an engine change on a Lancaster took 6 or 7 hours plus ground and air testing.

    Cheers, Neil
     
  6. andrewshimmin

    andrewshimmin Well-Known Member

    إنضم إلينا في:
    ‏18 مارس 2011
    المشاركات:
    1,770
    عدد المعجبين:
    2,170
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is sometimes essential in engineering to test something to show it is really a bad idea. Mr Bulleid played this important role.
     
    أعجب بهذه المشاركة LMS2968
  7. paulhitch

    paulhitch Guest

    Sorry, it had already been tested and found to be a bad idea in the commercial world.

    Paul H
     
  8. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    إنضم إلينا في:
    ‏15 إبريل 2006
    المشاركات:
    16,551
    عدد المعجبين:
    7,897
    مكان الإقامة:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite so; a Napier Sabre aero engine did about 25 hours service between major overhauls, less if emergency boost had been used a lot.
     
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,458
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, though Bulleid tested the sleeve valve idea by modifying H1 Atlantic "Hartland Point", and an objective view of that loco, following considerable period of running, should have made it clear that it had higher coal and water consumption, suffered valve gear breakages while in service and on a number of occasions contrived to get stuck in a position such that it would not start in either direction. Despite that, the Leader project went ahead...

    Tom
     
    andrewshimmin و paulhitch معجبون بهذا.
  10. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,030
    عدد المعجبين:
    1,088
    الوظيفة:
    A Thingy...
    Mainly because I don't think the trial results were fully analysed before the Board rushed into ordering them.
     
  11. Kinghambranch

    Kinghambranch Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2006
    المشاركات:
    1,879
    عدد المعجبين:
    1,612
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    White Rose County
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed, and, for those who aren't quite sure what one looks like, here is a rare survivor bolted onto one of its main users, the Hawker Typhoon (RAFM Cosford).
    20140415-10-Hawker Typhoon 1b MN235 in Conservation Centre.JPG
     
  12. paulhitch

    paulhitch Guest

    S.A.C.Martin surely has a point here in contrasting the lambasting given to Thompson (IMHO possibly rightly) with the excuses made for Bulleid (IMHO probably over generously). Once again sorry for thread divergence!

    PH
     
    S.A.C. Martin و Martin Perry معجبون بهذا.
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,793
    عدد المعجبين:
    64,458
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An engine so powerful the damn thing could even fly without wings :)

    Tom
     
    أعجب بهذه المشاركة Kinghambranch
  14. Enterprise

    Enterprise Part of the furniture

    إنضم إلينا في:
    ‏9 سبتمبر 2005
    المشاركات:
    5,472
    عدد المعجبين:
    3,302
    The debate about the advantages and disadvantages of poppet valves and sleeve valves in aircraft engines is far more nuanced than the facile hearsay reported in this thread. As an elementary starting point anyone interested could start by reading Fedden - The Life of Sir Roy Fedden.
     
    أعجب بهذه المشاركة andrewshimmin
  15. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,732
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For those of us in need of a very brief primer, and without ready access to a library copy, please could you provide a brief pointer to the key issues.

    Sent from my GT-N8010 using Tapatalk
     
  16. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,170
    مكان الإقامة:
    Nantwich, Cheshire
    For a second I looked on Nat pres and thought people were interested in the Fowler 2-6-4 tank.....

    No real updates to be said about it at the moment. As you can imagine all our efforts are being pumped into the Patriot, however if there is anyone who isn't particularly interested in that loco but would want to be part of the build of the tank please do get in contact.
     
  17. Bulleid Pacific

    Bulleid Pacific Part of the furniture

    إنضم إلينا في:
    ‏14 إبريل 2007
    المشاركات:
    4,030
    عدد المعجبين:
    1,088
    الوظيفة:
    A Thingy...
    What I was getting at was that it seems the results coming from Hartland Point (ie. don't use sleeve valves on a steam locomotive) weren't really applied to the main design. This can probably be attributed to two things: Bulleid wanting to plough on regardless (likely), and the pressure provided by the SR Board in placing an order for a fleet (equally likely). Anyway, back to Fowler...
     
  18. Cartman

    Cartman Part of the furniture

    إنضم إلينا في:
    ‏14 ديسمبر 2015
    المشاركات:
    2,755
    عدد المعجبين:
    2,109
    الجنس:
    ذكر
    الوظيفة:
    Van driver
    مكان الإقامة:
    Cheshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Back to Fowler - its a nice loco and I look forward to seeing it. It was just what the Southern could have done with, instead of wasting money on the Leader :)
     
    أعجب بهذه المشاركة LesterBrown
  19. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,072
    عدد المعجبين:
    5,361
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure. The Southern had a very capable 2-6-4T of their own, but it didn't like their permanent way. Would the LMS version do any better?
     
  20. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,538
    عدد المعجبين:
    18,385
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Southern seemed to get a bit paranoid about using tank locos for high speed passenger work after the River Class derailment. The W Class 2-6-4Ts were allocated to the two local sheds to where I spent my spotting years, Hither Green and Norwood Junction and spent their time plodding around with transfer freights from North London and were never seen on passenger trains. This is not surprising as I don't think Norwood Junction had regular passenger turns and Hither Green only had one, a commuter train from Cannon Street for which it always kept its only King Arthur in pristine condition.
    It would have been interesting to see how the Ws performed in comparison to the LMS and Standard tanks on passenger work.
     

مشاركة هذه الصفحة