If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

6023

Тема в разделе 'Steam Traction', создана пользователем Eightpot, 4 окт 2011.

  1. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.847
    Broadly true, but the actual amount of energy in the noise itself (i.e. acoustic energy) is small. The loudness of the noise does give some indication of the energy in the exhaust steam (hence the very quiet exhausts of French compounds) but is influenced by other factors as well.
     
  2. gwr4090

    gwr4090 Part of the furniture

    Дата регистрации:
    8 авг 2005
    Сообщения:
    2.847
    Симпатии:
    222
    Пол:
    Мужской
    Род занятий:
    Scientist (Rtd)
    Адрес:
    Dorset
    According to a report in the autumn issue of the Great Western Echo, the Great Western Society are hoping to send 6023 to the West Somerset Railway in Spring 2017 to allow the new blastpipe to be fully proven ready for main line service. The boiler certificate expires in 2020.
     
    mike1522, Mick45305, green five и 2 другим нравится это.
  3. 61624

    61624 Part of the furniture

    Дата регистрации:
    27 сен 2006
    Сообщения:
    5.294
    Симпатии:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've nothing against the WSR, but wouldn't it be better sent somewhere that is permitted to do 60mph testing?
     
  4. 1472

    1472 Well-Known Member

    Дата регистрации:
    26 авг 2008
    Сообщения:
    1.954
    Симпатии:
    2.639
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Probably more important to see whether it will steam or not whilst hill climbing to start with.
     
    34098 нравится это.
  5. K14

    K14 Member

    Дата регистрации:
    6 ноя 2011
    Сообщения:
    413
    Симпатии:
    306
    Адрес:
    Catford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think it's more a question of sending it somewhere with a good long run that involves a hill or two. IIRC the GC was mooted a while back, but 1 in 170 o.n.o isn't quite the challenge of the climb from Bishops Lydeard to Crowcombe (or Willton to Crowcombe) with a decent load (10?) behind it.
     
  6. pwsw5054

    pwsw5054 Member

    Дата регистрации:
    5 янв 2016
    Сообщения:
    411
    Симпатии:
    1.284
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I heard somewhere that the BL to N Fitz was passed for 50mph. Don't know if it's true though.
     
  7. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.514
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can i ask the obvious if the boiler has only 3-4 years left why bother to main line it? as it will only see about 3 years, before it has to be withdrawn, Might it be better to not go through the registration until it has had a further 10 year ticket, the fact that hopefully it hasnt seen many steaming circles may mean a retube may be all thats needed?
     
  8. 6024KEI

    6024KEI Member

    Дата регистрации:
    21 апр 2006
    Сообщения:
    861
    Симпатии:
    475
    Адрес:
    Bath
    Bearing in mind a fair few don't make their full 7 years before they need boiler work, I'd still reckon if they can get a good three years out of it, its worth making at least some use of that set of tubes. Its unlikely to get heavily flogged anyway as it will depend on support crew availability so the overhaul when it comes still shouldn't be a heavy one given the amount of rebuilding that went into bringing her back from the dead! Plus if they wait a few more years while they retube it etc, 6024 will be back out meaning that there is competition for King haulage.
     
  9. david1984

    david1984 Resident of Nat Pres

    Дата регистрации:
    13 сен 2005
    Сообщения:
    12.910
    Симпатии:
    1.387
    Пол:
    Мужской
    Адрес:
    Birmingham
    No noise is boring, compare a 37 to a 66...
     
    Spamcan81, Matt37401 и 34098 нравится это.
  10. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A Pannier to a Taffy tank? Why?
     
    railrover, GWRArry, Spamcan81 и 2 другим нравится это.
  11. 34098

    34098 Member Account Suspended

    Дата регистрации:
    22 июн 2010
    Сообщения:
    587
    Симпатии:
    138
    Род занятий:
    ,
    Адрес:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Exactly, best to test it on a hill on a proper load , all very well moving up the demo line on a couple coach, hardly a proper test for it,
     
  12. LISTER B

    LISTER B New Member

    Дата регистрации:
    26 окт 2011
    Сообщения:
    7
    Симпатии:
    5
    At the WSR you can test on hills do 60mph from BL to Norton and have the safty of a preserved line should anything go wrong !
    Also its one of the few King gauge friendly mainline routes in and out of there!
     
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.514
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that is another issue, what routes will the king now fit with in NR's somewhat restictive gauging ?
     
  14. nanstallon

    nanstallon Part of the furniture

    Дата регистрации:
    8 сен 2005
    Сообщения:
    4.358
    Симпатии:
    2.418
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Westcountry
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think she is down to work the GB railtour from Falmouth next May.
     
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.514
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    are you sure your not getting confused with 66023:p:eek:
     
    andalfi1 нравится это.
  16. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.551
    Симпатии:
    11.955
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is it this years 46100?
     
  17. 34098

    34098 Member Account Suspended

    Дата регистрации:
    22 июн 2010
    Сообщения:
    587
    Симпатии:
    138
    Род занятий:
    ,
    Адрес:
    82G
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Rightly or wrongly, its been down to work pretty much any train a kings gauged to run on, for at least the past 3 years or so,
    Question is,
    Is it the promotor jumping the gun trying to put bums on seats, opening another can of worms when it doesn't run,
    Or is it down to the loco owning group, who have told said promoter, yeah we can do the run, In full knowledge it doesn't stand a chance of making said deadline.
    Its a tricky one,

    With 3 years left on the ticket wouldnt it be worth a light overhaul/retube then come back with a full boiler ticket and ready to tackle the mainline after a period of running in,
     
  18. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.589
    Симпатии:
    22.717
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It is possible, but I don't know, that given the hardly demanding activities it has been involved in since the ten year clock started ticking, the boiler assessment at the appropriate point may trigger exactly what you are suggesting. So its time out of traffic may be short and the main line certification will have been worthwhile.
     
    andalfi1 нравится это.
  19. GWR4707

    GWR4707 Nat Pres stalwart

    Дата регистрации:
    12 май 2006
    Сообщения:
    19.232
    Симпатии:
    17.566
    Пол:
    Мужской
    Адрес:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In answer to your first question I strongly suspect its the former, merely as a member of the GWS they have always been very straight in their musings that it will be ready when its ready and not before?

    In terms of the boiler, no idea, she has had a relatively quiet time so it may be the case that they get her certified and mainline proven, then do a boiler overhaul which will in turn give a new ticket?
     
  20. Midland Red

    Midland Red New Member

    Дата регистрации:
    11 апр 2006
    Сообщения:
    152
    Симпатии:
    23
    Адрес:
    Staffs
    The main issue here is that when the loco was modified to be within the 'mainline' gauge steaming issues arose. A unique - for Kings - solution has been developed and installed and it is now necessary to prove this solution in conditions as near as is possible to its future mainline operations. The WSR from Minehead to Norton is ideal for this purpose. This boiler ticket or the next ticket is irrelevant at this stage.
     
    Nick Gough, Paul42, LesterBrown и ещё 1-му нравится это.

Поделиться этой страницей