If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

44871 + 45407 Poole to Bristol. Thurs. 24th Nov, 2016

الموضوع في 'What's Going On' بواسطة free2grice, بتاريخ ‏17 نوفمبر 2016.

  1. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,659
    عدد المعجبين:
    3,689
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The electrification from Chippenham to Bristol has been delayed until at least 2024. Sydney Gardens is now safe for a while. <BJ>
     
  2. gwr4090

    gwr4090 Part of the furniture

    إنضم إلينا في:
    ‏8 أوت 2005
    المشاركات:
    2,847
    عدد المعجبين:
    222
    الجنس:
    ذكر
    الوظيفة:
    Scientist (Rtd)
    مكان الإقامة:
    Dorset
    According to Network Rail, electrification of this section is now expected to be completed in control period 6 which starts in 2019 (not 2024 !). The completion date will be agreed in early 2018.
     
    أعجب بهذه المشاركة John Stewart
  3. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,659
    عدد المعجبين:
    3,689
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    RYTC appear confident enough to leave the 33 behind tomorrow. Soon after the train departs from Bristol Temple Meads the locos are straight into the arduous climb of Horfield bank. Then later after a stop at Abergavenny the locos are straight into the difficult climb to Llanvihangel. I'm sure that RYTC have weighed up the risks involved and are confident that the Riley '5's will perform well. <BJ>
     
  4. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,659
    عدد المعجبين:
    3,689
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We've heard promises from Network Rail regarding the completion date and the cost of electrification for many years.

    From the Telegraph on 8th November, 2016 :
    ''Rail minister Paul Maynard said he had deferred electrification because newer trains with more capacity can bring in the benefits expected by passengers without requiring costly and disruptive electrification works".

    <BJ>
     
  5. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,659
    عدد المعجبين:
    3,689
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    44871 + 45407. Romsey RT at 08:46. Diesel at rear? <BJ>
     
  6. steamvideosnet

    steamvideosnet Well-Known Member

    إنضم إلينا في:
    ‏12 إبريل 2011
    المشاركات:
    1,968
    عدد المعجبين:
    2,476
    الجنس:
    ذكر
    مكان الإقامة:
    Southampton, UK
    Yes, 47802 on the rear.

    James
     
    أعجب بهذه المشاركة free2grice
  7. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    Real reason is new EU regulation on height of cables. They have gone up a few inches which means tunnels would need to be re-bored in places. That adds to the cost. Is the delay waiting for Brexit?
     
  8. HerstonHalt

    HerstonHalt Member

    إنضم إلينا في:
    ‏27 إبريل 2009
    المشاركات:
    255
    عدد المعجبين:
    169
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Black 5s sounded great on the ECS climb out of Swanage this morning. Heard them for quite a distance. 47 sounded to be just idling.
     
  9. Bean-counter

    Bean-counter Part of the furniture

    إنضم إلينا في:
    ‏21 جويلية 2007
    المشاركات:
    5,844
    عدد المعجبين:
    7,688
    الجنس:
    ذكر
    مكان الإقامة:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The real reason is because costs are out of control and a very expensive factory train for installing the overhead wire masts isn't installing them at anything like the number per shift required, probably because ground conditions rather than the 'tools' being used for the installation are likely to have more say on speed of work!

    Steven
     
  10. Dobbs0054

    Dobbs0054 Member

    إنضم إلينا في:
    ‏23 سبتمبر 2014
    المشاركات:
    872
    عدد المعجبين:
    520
    الجنس:
    ذكر
    does not detract from change in EU regulations that mean tunnel floors cannot be dropped enough to accommodate clearances. Tunnels will be re-bored. Some bridges raised. Rather a costly and time consuming exercise.
     
  11. Bean-counter

    Bean-counter Part of the furniture

    إنضم إلينا في:
    ‏21 جويلية 2007
    المشاركات:
    5,844
    عدد المعجبين:
    7,688
    الجنس:
    ذكر
    مكان الإقامة:
    Former NP Member
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Can you post a link to the regulation in question - I am amazed that Network Rail aren't shouting this from the roof tops as being their perfect 'get out of jail' card on this, which the are currently receiving all the blame for.

    Thanks

    Steven
     
  12. Steven

    Steven New Member

    إنضم إلينا في:
    ‏31 ديسمبر 2013
    المشاركات:
    16
    عدد المعجبين:
    38
    الجنس:
    ذكر
    Taken earlier as they stormed through Oldfield Park running 6 minutes early
     

    الملفات المرفقة:

    • Snapseed.jpg
      Snapseed.jpg
      حجم الملف:
      2.6 ميغا
      المشاهدات:
      45
  13. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,346
    عدد المعجبين:
    17,834
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Unless NR overlooked that it was coming in when planning and designing the scheme and thus would end up with eggy faces if they raised the issue publicly, EU regulations do not just appear overnight and there has been no mention of these problems on the schemes being completed (painfully slowly) in the NW?
     
  14. gricerdon

    gricerdon Guest

    Getting back to the subject, 44871+45407 were 14 late Poole but right time storming past us on Horseshoe Bridge, St Denys in beautiful light with the 47 just idling on the back. The Riley 5s never fail to impress.
     
  15. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So 11 plus a diesel was within the scope of the 5s today. Let's hope the same applies on Sunday.
     
    أعجب بهذه المشاركة Springs Branch
  16. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    413
    عدد المعجبين:
    1,318
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sounded good up Upton Scudamore although only one loco seemed to be working hard and the diesel was shoving, still sounded nice though. Video to come.
     
  17. pwsw5054

    pwsw5054 Member

    إنضم إلينا في:
    ‏5 يناير 2016
    المشاركات:
    413
    عدد المعجبين:
    1,318
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer


    At the summit of Upton Scudamore
     
  18. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,659
    عدد المعجبين:
    3,689
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It was good to see the Black 5s powering through Oldfield Park this morning en route to Bristol. I took it for granted that the diesel on the back was giving an almighty shove considering the speed that the train was accelerating but I'm pleased to report that the diesel was just idling. Well done to the West Coast crews. <BJ>
     
  19. steamvideosnet

    steamvideosnet Well-Known Member

    إنضم إلينا في:
    ‏12 إبريل 2011
    المشاركات:
    1,968
    عدد المعجبين:
    2,476
    الجنس:
    ذكر
    مكان الإقامة:
    Southampton, UK
    44871 and 45407 approaching Eastleigh this morning, just as 444030 rolled in on a delayed Portsmouth-London service.

    44871 45407 Eastleigh.001.jpg

    James
     
    أعجب بهذه المشاركة lord stamp
  20. dublo6231

    dublo6231 Member

    إنضم إلينا في:
    ‏22 أوت 2011
    المشاركات:
    581
    عدد المعجبين:
    485
    الجنس:
    ذكر
    الوظيفة:
    IT
    مكان الإقامة:
    Sat at home
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I bet you said a few choice words!
     

مشاركة هذه الصفحة