If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

GWR Steam Railmotor

Discuție în 'Steam Traction' creată de D6332found, 14 Feb 2017.

  1. W.Williams

    W.Williams Well-Known Member

    Înscris:
    20 Dec 2015
    Mesaje:
    1.650
    Aprecieri primite:
    1.559
    Ocupație:
    Mechanical Engineer
    Locație:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Saw the railmotor at Didcot today. A lick o paint is sare needed! Otherwise well tho!
     
  2. LesterBrown

    LesterBrown Member

    Înscris:
    20 Ian 2009
    Mesaje:
    995
    Aprecieri primite:
    761
    Locație:
    Devon
    I have a vague, and possibly incorrect, recollection that the original plan was that it would have been re-painted chocolate and cream by now.
     
  3. 6024KEI

    6024KEI Member

    Înscris:
    21 Apr 2006
    Mesaje:
    861
    Aprecieri primite:
    475
    Locație:
    Bath
    I've seen photos of it in steam being tested so I assume its nearly back in action.
     
  4. Martin Perry

    Martin Perry Nat Pres stalwart Staff Member Moderator Friend

    Înscris:
    15 Apr 2006
    Mesaje:
    16.551
    Aprecieri primite:
    7.897
    Locație:
    1012 / 60158
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Though obviously in the case of the railmotor, very few of its mechanical parts are much more than 10 years old.
     
    MuzTrem apreciază asta.
  5. Charles Parry

    Charles Parry Member

    Înscris:
    2 Aug 2013
    Mesaje:
    340
    Aprecieri primite:
    312
    Sex:
    Masculin
    Railway centre's Facebook page confirms that 4144 has been passed for traffic: https://www.facebook.com/DidcotRailwayCentre/
     
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.914
    Aprecieri primite:
    5.855
    I've just gone to that page and found the layout very confusing, with no mention at all of 4144. Yet another reason to avoid Facebook.
     
  7. ghost

    ghost Part of the furniture

    Înscris:
    29 Mai 2006
    Mesaje:
    4.308
    Aprecieri primite:
    5.745
    Sex:
    Masculin
    Locație:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    3rd posting on that Facebook page (under 'Posts') - didn't seem too hard to find for me? If in doubt, click 'Posts' on the left hand side and this clears away other videos, announcements etc. and just leaves the postings.

    Hope this helps


    Keith
     
    GW 5972 apreciază asta.
  8. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Agree that Facebook is profoundly unsatisfactory for anyone who isn't fully committed to it. Much better if this sort of news were on proper web pages. You could try this link:

    https://www.facebook.com/DidcotRail...421647218065/1675813205778894/?type=3&theater

    There's very little text/news (just that the boiler test was passed and insurance has cleared her for traffic), but there is a rather atmospheric photo. Other news is that work on the King is progressing and the next step is to get her Laser scanned for gauging.
     
    Last edited: 22 Feb 2017
  9. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.914
    Aprecieri primite:
    5.855
    Thanks for pointing me (and others) to where the news about 4144 can eb found.
    Where is that process carried out?
     
  10. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No idea, sorry.
     
  11. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.669
    Aprecieri primite:
    2.180
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Mid Norfolk Railway website has an announcement that the Railmotor will be visiting the line during this month (Sept).
    Don't tell me I'm the only person to have spotted that...........!!
    http://www.mnr.org.uk/
     
    andalfi1 apreciază asta.
  12. RayMason

    RayMason Member

    Înscris:
    25 Sep 2009
    Mesaje:
    357
    Aprecieri primite:
    236
    Sex:
    Masculin
    Ocupație:
    Company secretary. Finance director
    Locație:
    Dawlish Warren
    Totally excellent run on new track at OOC 111
    It used to stop at nearby halts incl OOC but a bit before my time
    Excellent commentary on board- a credit to the GWS
    Ray
     
  13. toplight

    toplight Well-Known Member

    Înscris:
    18 Mai 2009
    Mesaje:
    1.351
    Aprecieri primite:
    1.288
    Locație:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have seen it. There was a number of problems with the mouldings. I am not sure how they did at Llangollen. Originally at Swindon works they would have been made of Brazilian Mahogany and then bedded in with White Lead paste often mixed with Linseed Putty. They were put on with lots and lots of panel pins spaced around 1.5 inches apart in a zig zag pattern and banged with a hammer + block of wood etc to get them to a tight fit. The pin heads are then knocked in a bit below the surface with a small punch. ( Bear in mind I have been taught how to do this by a very skilled Ex Swindon works coach builder)
    At Llangollen they seem to have screwed them on with not so many screws. Not sure what wood they used. For my own project we have used Utile for them instead of Brazilian Mahogany which is similar but easier to get. As a wood it is stable enough for mouldings but not too hard. We have also used frame sealant instead of the White Lead. You could screw some parts if is a particularly tight bend, or put in more pins. With long sections you make it slightly too long, say an extra 1mm and then 'spring' them in so it's a tight fit.
    Another mistake made on one section of the Railmotor I saw was that they had some joins in the plywood panelling that had no moulding over them. The reason for the mouldings is to cover over the joins in the panelling , So you need to arrange any joins where a moulding will eventually go on top. It might be the case that with 8 x 4 sheets that it is not big enough to avoid but in the bit I saw it could have been done, so the join will always show however much you fill/paint and cause a crack in the paint where the uncovered joint is.

    I understand the mouldings were redone at Didcot and it repainted again, not sure exactly when.
     
    Last edited: 5 Sep 2017

Distribuie pagina asta