If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем gwr4090, 15 ноя 2007.

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.798
    Симпатии:
    64.476
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Robin - what are the duties of Line Controller (presumably somewhat similar to the duty Operating Supervisor that we have every day?). Feels to me that being both Line Controller and Signalman is a big job - is it normal that they are combined, or would the preference be that they are separate roles and it was an out-of-course situation that you ended up doing both on one day?

    Tom
     
  2. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If a loop is being considered the Dunster side of the crossing it would be false economy not to provide the extra road at the crossing as the extra cost would be relatively small and could provide even more flexibility. Time to think outside the box for a change.
     
  3. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As you know, there was a time when I used to be on the Bluebell's daily 'Responsible Officer' roster, took the same role for the K&ESR some years ago and was first line operating response for British Railways when I worked for them. On quieter days there is no problem with combining Minehead signalman and Line Controller but you can be a bit stretched on busier days. We do always have an on-call 'Duty Officer' as well. How / when the Controller / Minehead signalman might be split is something 'on the list' for the new 'Head of Operating' to consider when he starts in June.

    Robin
     
    Bean-counter и Jamessquared нравится это.
  4. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I disagree.

    Robin
     
  5. Pete Thornhill

    Pete Thornhill Resident of Nat Pres Staff Member Administrator Moderator Friend

    Дата регистрации:
    24 июл 2008
    Сообщения:
    7.763
    Симпатии:
    5.890
    But would there be any use for it given the increase in capacity a loop would provide as it would give plenty of additional flexibility?

    The layout wouldn't be a million miles from the SVR at Kidderminster which has two platforms along with a loop outside the station. It's certainly put to good use and a gala will usually see the flexibility put to good use.
     
    Yorkshireman нравится это.
  6. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would you be kind enough to explain your reasons? Doing it when the crossing is being revamped anyway would cost very little extra whereas adding a road later would be many times more costly. The "spare" road need not be connected beyond the crossing limits until required.
     
  7. GWR Man.

    GWR Man. Well-Known Member

    Дата регистрации:
    8 окт 2014
    Сообщения:
    2.259
    Симпатии:
    2.695
    Пол:
    Мужской
    Адрес:
    Taunton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As explained 24/12/2016 https://www.national-preservation.c...ilway-operations.508987/page-139#post-1692045
     
    Yorkshireman нравится это.
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.798
    Симпатии:
    64.476
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    So is it currently that the two roles (Line Controller and Minehead Signalman) are always combined?

    I can see advantages both ways - certainly combining them cuts out one link in any communications chain - though also I can imagine that if you had an untoward issue that required some complex resolution, liaison with outside stakeholders and maybe replanning of the service, you wouldn't necessarily wish to be dealing with that while also carrying out signalling duties. (Or would those kind of things be taken up by the Duty Officer?) Always interesting to see what operating practices other lines use, in any case.

    (As an aside - I was Loco Running Foreman on the second day of the Flying Scotsman gala at the Bluebell, and even though my responsibility and authority essentially began and ended at the loco yard exit signal, I don't think I would have wanted anything else to deal with on top, certainly not for the first four hours of the day!)

    Tom
     
    Last edited: 3 май 2017
  9. Yorkshireman

    Yorkshireman Part of the furniture

    Дата регистрации:
    6 июл 2014
    Сообщения:
    4.486
    Симпатии:
    5.045
    Пол:
    Мужской
    Род занятий:
    Comfy chair occupant!
    Адрес:
    No moaners please!
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks but it seems to me that a few thousand spent when the crossing is revamped would allow extra flexibility in future at much less cost than if a second road had to be constructed later. It is certainly worth considering costing it rather than rejecting it out of hand as some seem to be doing.
     
    Last edited: 3 май 2017
  10. Yes and make it dual gauge too ;)

    Steve
    (one day the WSR will recreate the SCR :) )
     
    Yorkshireman нравится это.
  11. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, that is the present arrangement.

    The extent to which the Duty Officer gets involved with any incident is a matter of discussion between the Controller and the Duty Officer.

    Robin
     
  12. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes.

    The WSR is at capacity at Galas with an hourly service. This is determined by the long BA to WN and WN to CE sections.

    Greater capacity, the ability to run a Goods train during the passenger service and the opportunity to have some recovery time in a stretched timetable requires those long sections to be divided.

    Some additional terminal capacity at both BL and MD would not go amiss, in time.

    Robin
     
  13. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    Дата регистрации:
    28 сен 2014
    Сообщения:
    2.237
    Симпатии:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Always wanted to see a loco being loaded on to lorry, delighted to watch this afternoon
     
  14. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    Дата регистрации:
    28 сен 2014
    Сообщения:
    2.237
    Симпатии:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IMG_8538.JPG IMG_2301.JPG
     
    Paul Kibbey и Yorkshireman нравится это.
  15. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looks like it is a different method from the norm.
    Saves building 2 ramps though, just need enough space to get 2 trailers positioned back to back.
     
  16. Bayard

    Bayard Well-Known Member

    Дата регистрации:
    26 апр 2015
    Сообщения:
    1.841
    Симпатии:
    3.904
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Please explain how, if we are not talking about a physical third platform?
     
  17. AnthonyTrains2017

    AnthonyTrains2017 Well-Known Member

    Дата регистрации:
    28 сен 2014
    Сообщения:
    2.237
    Симпатии:
    918
    Heritage Railway Volunteer:
    No I do not currently volunteer
  18. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Дата регистрации:
    27 апр 2014
    Сообщения:
    11.404
    Симпатии:
    18.231
    Пол:
    Женский
    Род занятий:
    Barrister
    Адрес:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Both platforms occupied.

    Arriving train 'arrives' in loop Dunster side of Level crossing and so clears single line to Dunster.

    Train departs either main or bay platform.

    Train in loop enters now free platform.

    And for my next trick.....:)

    Robin
     
    Paul Kibbey и toplink нравится это.
  19. Fred Kerr

    Fred Kerr Resident of Nat Pres Friend

    Дата регистрации:
    24 мар 2006
    Сообщения:
    8.383
    Симпатии:
    5.368
    Пол:
    Мужской
    Род занятий:
    Freelance photo - journalist
    Адрес:
    Southport
    Having been impressed with the length of Minehead's platform I have often wondered if there is any value in "splitting" the platform with a mid-way point to allow two trains to operate from the platform; the one nearest the buffers being able to depart via said point then leaving the top half of the platform to either act as a loop (whereby trains set back before passengers entrain) or simply stand until ready for departure.
     
  20. Jeff Price

    Jeff Price Member

    Дата регистрации:
    25 авг 2013
    Сообщения:
    715
    Симпатии:
    1.409
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    How would this train in the loop give up the single line token to allow it to be given to the departing train.

    then

    How would the train in the loop then be allowed to leave the loop to enter the platform.

    Would the signal box have to be moved the other side of the crossing ???

    Jeff Price
     

Поделиться этой страницей