GWSR Broadway Developments

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Breva, بتاريخ ‏1 أوت 2014.

  1. Breva

    Breva Well-Known Member

    إنضم إلينا في:
    ‏11 اكتوبر 2010
    المشاركات:
    2,378
    عدد المعجبين:
    4,159
    مكان الإقامة:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tricky. We had on site 2 dumpers, a fork lift with bucket, a tarmac machine and a roller. That's the machinery.
    Then you get the supply of tarmac. This comes in 20T lorries and at one point there were three of them jostling on the drive. In between was a visitor who insisted on driving up to the forecourt, where he did a 3 point turn, and then drove back down through all the tarmac loading activity.

    I told you there was no space up there !

    My idea would be to build some sort of bridge across, maybe using the bogie flats we have. The dumper could run across them and supply the machinery on the other side.
    I said to one tarmaccer ' this must be an unusual job for you', and he said it was not. He thought this was a NR line, he had no idea it was a steam line built by volunteers.
    On to the next job....
     
  2. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,663
    عدد المعجبين:
    4,121
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In the light of Jo's comments, deleted!
     
  3. toplight

    toplight Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2009
    المشاركات:
    1,351
    عدد المعجبين:
    1,288
    مكان الإقامة:
    Swindon, England
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ideally the bench should be repaired with oak as it looks like that is what the original parts were made with (not softwood)

    Have a look at this superb job of a restoration of a Midland Railway bench which is now at Settle Station. (it is in the small waiting room). There is a lot of pictures of its restoration here by the company that did it. Maybe they could finish the one you have ? Have a look anyway for inspiration

    http://furnitureworkshop.net/?portfolio=midland-railway-bench
     
    أعجب بهذه المشاركة Chris White
  4. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I should have known the difference.

    I wondered if it was to deal with heritage fundamentalists who were demanding historically appropriate length trains etc
     
    Copper-capped و 30854 معجبون بهذا.
  5. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Two Birminghams, an Ashbury zipper, one converted QIII guard's van and 80 unbraked empty slate waggons (trad. FR spelling) tacked on the back? Leaking tubes seem to have featured strongly too ..... perhaps 3 hrs to Blaenau, with a few protracted stops to 'blow up' might satisfy historical accuracy ...... though forgive me if I'm enough of a Philistine to enjoy the view from the comfort of a Buffet Car! :)
     
  6. PaulK

    PaulK New Member

    إنضم إلينا في:
    ‏31 مارس 2017
    المشاركات:
    32
    عدد المعجبين:
    43
    الجنس:
    ذكر
    مكان الإقامة:
    Gosport
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That is one way of doing it, I would use a Warflat as these have extending props at each corner which can be screwed down onto the rail to steady the wagon whilst loading tanks etc.

    On NR I have seen how contractors access island platforms. At the start of the possession they put down large, what looks like, polystyrene blocks on the tracks. These rest on the sleepers and have grooves cut out for the rails. They use two to bridge between one platform and the next and can be one more row wide as required. They then just drive their machines and materials across. At the end of the possession they just lift the blocks out again. Unfortunately I don’t have any other details of this but I am sure other readers might be able to advise further.

    Regards

    PaulK
     
    AndyY و Kinghambranch معجبون بهذا.
  7. gwilialan

    gwilialan Well-Known Member

    إنضم إلينا في:
    ‏8 ديسمبر 2012
    المشاركات:
    1,715
    عدد المعجبين:
    4,010
    الجنس:
    ذكر
    مكان الإقامة:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How have you managed to get away without having tactile slabs along the platform edge to conform to the DDA? After all this is slightly more than a refurbishment, it's practically a new build which would be required to comply.
     
  8. PaulK

    PaulK New Member

    إنضم إلينا في:
    ‏31 مارس 2017
    المشاركات:
    32
    عدد المعجبين:
    43
    الجنس:
    ذكر
    مكان الإقامة:
    Gosport
    Heritage Railway Volunteer:
    No I do not currently volunteer
    For further reading search for: Jablite Fillmaster Polystyrene Bridge. Jablite.co.uk
     
  9. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,663
    عدد المعجبين:
    4,121
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    أعجب بهذه المشاركة Kinghambranch
  10. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    أعجب بهذه المشاركة gwalkeriow
  11. FearOfManchester

    FearOfManchester Member

    إنضم إلينا في:
    ‏24 يناير 2016
    المشاركات:
    366
    عدد المعجبين:
    422
    الجنس:
    ذكر
    مكان الإقامة:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You can probably get the same result with stacked wood, always amazes me how compressible wood is and the weight that it can take, a lot heavier than polystyrene mind you, but doesn't linger in the environment for thousands of years if any breaks off though!
     
    أعجب بهذه المشاركة Bluenosejohn
  12. jtx

    jtx Well-Known Member

    إنضم إلينا في:
    ‏4 جويلية 2007
    المشاركات:
    1,868
    عدد المعجبين:
    855
    الجنس:
    ذكر
    الوظيفة:
    Happily retired
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Piece of cake. We ran 8 coaches with 4566 on the SVR for many years and that's with 1 in 100 gradients.
     
  13. jnc

    jnc Well-Known Member

    إنضم إلينا في:
    ‏3 إبريل 2012
    المشاركات:
    1,511
    عدد المعجبين:
    2,709
    الجنس:
    ذكر
    مكان الإقامة:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An interesting question indeed. Anyone know?

    Noel
     
  14. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,818
    عدد المعجبين:
    12,016
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    RSP5 clearly states that "..... In accordance with DfT guidance, platforms should be provided with a tactile surface to indicate the edge to visually impaired people. Platform edges (but not platform ramps) should be clearly defined with a strip of a lighter colour."
    However, I remember a conversation with HMRI when I was told that they don't insist on it for heritage stations. I think 'should' is the operative word.
     
  15. 60835

    60835 Guest

    The railway just featured on the Chris Evans show, in connection with Cheltenham Gold Cup day.
     
    أعجب بهذه المشاركة Kinghambranch
  16. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,985
    عدد المعجبين:
    2,766
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Heard the interview with the Volunteer Finance Director.
    Got the plug in about Broadway opening on Good Friday but did not hear anything about facilities at the Race Course Station.
    Or is that all currently booked up and full?
     
  17. Mark Thompson

    Mark Thompson Well-Known Member

    إنضم إلينا في:
    ‏10 سبتمبر 2017
    المشاركات:
    1,663
    عدد المعجبين:
    4,121
    الجنس:
    ذكر
    مكان الإقامة:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How could anyone not love this Edwardian Beauty, a debutante of such fair proportion as yet unmarred by the wear of life:


    [​IMG]

    All that's missing is a horse and a hack and a few 1904 frocks, as per the well known opening day photograph.
     
    andalfi1, Dan Hill, nick glanf و 8 آخرون معجبون بهذا.
  18. FearOfManchester

    FearOfManchester Member

    إنضم إلينا في:
    ‏24 يناير 2016
    المشاركات:
    366
    عدد المعجبين:
    422
    الجنس:
    ذكر
    مكان الإقامة:
    Peak District
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I know the forecourt is going to be tarmacced and it would be very expensive, but imagine how cobbles/setts would just set the scene. I still think my recessed uplighters in the stone supports either side of the door is a good future idea ;)
     
  19. Gloucester Boy

    Gloucester Boy New Member

    إنضم إلينا في:
    ‏1 اكتوبر 2013
    المشاركات:
    125
    عدد المعجبين:
    352
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We worked every day this week as the platform slabbing had to be finished before the first train arrives on Wednesday and the remaining work area fenced off.


    On Monday and Tuesday, whilst the tarmacking was being done, we continued slabbing the forecourt side of the station.


    From Wednesday we went back to slabbing the platform up to the newly laid tarmac , and were able to finish this by Friday


    We will now continue with the slabbing on the forecourt side tomorrow (assuming the snow has melted), and try to complete it, however this isn’t critical to being completed before trains start running. Here is a picture of the finished platform slabbing:
    IMG_1557.JPG
     
    jnc, PaulB, Mark Thompson و 6 آخرون معجبون بهذا.
  20. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I know which platform surface I prefer!

    Tarmac is such boringly ugly stuff, and must cover half of Britain...............
     
    أعجب بهذه المشاركة jnc

مشاركة هذه الصفحة