If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Delivery of Locomotives Produced by Private Contractors

Тема в разделе 'Steam Traction', создана пользователем GWR4707, 27 авг 2018.

  1. GWR4707

    GWR4707 Nat Pres stalwart

    Дата регистрации:
    12 май 2006
    Сообщения:
    19.232
    Симпатии:
    17.566
    Пол:
    Мужской
    Адрес:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just another one of those middle of the night musings...

    I know for instance that Armstrong Whitworth produced some 66xx's and panniers for the GWR in the 20's/30's, plus some of the 94xx were built for BR(W) in Sheffield?

    In such cases how were the completed locomotives delivered to the ordering companies, I have never seen photographs of convoys being towed or anything like that, now in the case of the AW produced Black Fives I imagine it was a fairly simple case of running then along the Tyne Valley from Elswick to Carlisle and onto LMS metals there, less easy with a tank engine?

    Any answers gratefully received? Ta
     
  2. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Generally, they were delivered to the customer in groups of three. If this meant going over a different company's lines, it was usual to pick the shortest route to the customer's railway to reduce the costs. The locos would have their connecting rods off and these would be carried in a separate open wagon.

    The Irwell 'Books of...' include photos of Black Fives delivered from AW this way.
     
    4468BenV и Bluenosejohn нравится это.
  3. 22A

    22A Well-Known Member

    Дата регистрации:
    8 сен 2005
    Сообщения:
    1.105
    Симпатии:
    99
    Род занятий:
    Administrator
    Адрес:
    Between 31F & 34E
    Similarly; how were the four pannier tanks delivered to Perth to work the Dornoch branch?
     
  4. std tank

    std tank Part of the furniture

    Дата регистрации:
    20 сен 2005
    Сообщения:
    3.927
    Симпатии:
    1.070
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Four? Only two went to Scotland, 1646 and 1649.
     
  5. 22A

    22A Well-Known Member

    Дата регистрации:
    8 сен 2005
    Сообщения:
    1.105
    Симпатии:
    99
    Род занятий:
    Administrator
    Адрес:
    Between 31F & 34E
    Thanks for that, I was told / read somewhere previously that four went, but you are right.
    "GWR Class 1600 0-6-0 Pannier Tank ... In the Mid 1950s, locos 1646 and 1649 were transferred to Scotland to work the Dornock Branch Line."

    But how did they get there please; by inter regional freight perhaps?
     
  6. Steve

    Steve Resident of Nat Pres Friend

    Дата регистрации:
    7 окт 2006
    Сообщения:
    12.729
    Симпатии:
    11.847
    Род занятий:
    Gentleman of leisure, nowadays
    Адрес:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The railways were common carriers and almost the only means of moving goods over a long distance. If it was a small loco, it might go on a well wagon, even if it was out of gauge. Out of gauge loads were almost routine at one time. If a locomotive was destined for a railway company it would usually be consigned 'free on rail' from that company's nearest depot and this may not necessarily mean the shortest route. Locomotives built by the likes of Hunslet would sometimes go in steam with a crew provided by the company over which it was travelling and a minder from the manufacturer but this would usually only involve short distances. It was more usual to send them in a freight with the rods removed and just a minder.
     
    4468BenV и Bluenosejohn нравится это.
  7. johnofwessex

    johnofwessex Resident of Nat Pres

    Дата регистрации:
    6 апр 2015
    Сообщения:
    9.748
    Симпатии:
    7.858
    Пол:
    Мужской
    Род занятий:
    Thorn in my managers side
    Адрес:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I understand and fare more amusingly that sometimes contractors locos were moved to sites that were not (yet) rail connected by driving them along the road A'la Titfield Thunderbolt
     
  8. Reading General

    Reading General Part of the furniture

    Дата регистрации:
    18 май 2011
    Сообщения:
    6.081
    Симпатии:
    2.217
    Locos for the Waterford and Tramore railway (which was never connected to the main system)were driven along the road,thorough the City with rails removed behind and added in front, and they were mainline locos, albeit fairly small ones.
     
    andrewshimmin нравится это.
  9. polmadie

    polmadie Well-Known Member

    Дата регистрации:
    27 сен 2007
    Сообщения:
    1.242
    Симпатии:
    472
    Does anyone know how the three Class 1500s got to Barclays in Kilmarnock?
     
  10. Robin

    Robin Well-Known Member Friend

    Дата регистрации:
    7 май 2012
    Сообщения:
    1.471
    Симпатии:
    1.914
    Адрес:
    Stourbridge
    They were initially towed from Swindon to Bagnalls at Stafford in June 1961, possible to have the cylinders removed to meet Scottish clearances according to an old article in SVR News. The article suggests that they were then towed to Barclays at Kilmarnock. The SVR stock book states that they returned to Coventry by road.
     
  11. dunghill1

    dunghill1 New Member

    Дата регистрации:
    2 янв 2011
    Сообщения:
    65
    Симпатии:
    61
    Пол:
    Мужской
    Род занятий:
    retired
    Адрес:
    williton
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    And when they got to Swindon they went into the works as there faults had to be corrected. This included a lack of split pins, there was always a lot of split pins needed that had not been put in.
     
  12. LMS2968

    LMS2968 Part of the furniture

    Дата регистрации:
    1 сен 2006
    Сообщения:
    3.072
    Симпатии:
    5.361
    Пол:
    Мужской
    Род занятий:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Адрес:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I assume there's a mix-up here, as I can't see new Black Fives going to Swindon have split pins fitted.
     
    Last edited: 29 авг 2018
  13. polmadie

    polmadie Well-Known Member

    Дата регистрации:
    27 сен 2007
    Сообщения:
    1.242
    Симпатии:
    472
    Thanks for that information.
     
  14. LesterBrown

    LesterBrown Member

    Дата регистрации:
    20 янв 2009
    Сообщения:
    995
    Симпатии:
    761
    Адрес:
    Devon
    Boulton's Portland Street Works in Ashton-Under-Lyme was a mile from the MS&LR metals and locomotives were at first moved on wagons drawn by sixteen horses but it was found to cost only a quarter as much to steam them along the street on their flanges (taking from eight to ten hours) paying the Town Council's Surveyor the cost of any damage to the road surface.
     
    Forestpines, Bluenosejohn и Jamessquared нравится это.
  15. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.788
    Симпатии:
    64.441
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the early days, locos were sometimes delivered by ship, particularly when rails didn't stretch right across the country. Certainly a fair number of locos were delivered to southern England from northern locomotive builders in that way.

    Tom
     
  16. Matt37401

    Matt37401 Nat Pres stalwart

    Дата регистрации:
    8 июн 2014
    Сообщения:
    15.551
    Симпатии:
    11.955
    Адрес:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe Tallylyn No's 1 and 2 were delivered from Fletcher Jennings in Whitehaven to Twywn that way.
     
    andrewshimmin нравится это.
  17. StoneRoad

    StoneRoad Member

    Дата регистрации:
    29 окт 2009
    Сообщения:
    976
    Симпатии:
    385
    Род занятий:
    Restoration of heritage items, mainly in timber.
    Адрес:
    Haltwhistle
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Also: The Prince and The Princess were delivered from George England by sea.
     
  18. Forestpines

    Forestpines Well-Known Member

    Дата регистрации:
    5 июн 2009
    Сообщения:
    1.681
    Симпатии:
    2.438
    Пол:
    Женский
    Адрес:
    Somewhere in the UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Mountaineer, however, which preceded them, was delivered from London to Caernarfon by rail, and then onward on a specially-built cart drawn by ten horses.
     
  19. Monkey Magic

    Monkey Magic Part of the furniture

    Дата регистрации:
    6 янв 2018
    Сообщения:
    3.498
    Симпатии:
    6.845
    Адрес:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    *admires the new Trans Pennine stock* plus ça change, plus c'est la même chose

    This prompts a reverse question - how were locos for export transported from works to dock?
     
  20. DismalChips

    DismalChips Member

    Дата регистрации:
    11 апр 2016
    Сообщения:
    682
    Симпатии:
    715
    Адрес:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Did that not damage the flanges?
     

Поделиться этой страницей