If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем nine elms fan, 4 ноя 2012.

  1. Nick C

    Nick C Well-Known Member

    Дата регистрации:
    5 июл 2018
    Сообщения:
    1.560
    Симпатии:
    1.825
    Пол:
    Мужской
    Адрес:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've just got back from holiday in mainland Europe, and I can certainly see why some places are getting fed up of certain types of tourists - we were staying in a fairly residential area, and twice got woken up at 3am by drunken yobs getting back from the clubs - in both cases they were loud enough for us to tell that they were speaking English. I'd hate to think what it must be like for the locals who live there year-round.
     
    RLinkinS, 2392 и paulhitch нравится это.
  2. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.036
    Симпатии:
    1.505
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Critism of the work done by RVR by Junction Road continues on Social Media.
    I visited the area this morning and can report that RVR have posted a notice [dated May 2019] stating that they have started work on this Section of the railway. It also states that the clearance of the trackbed is taking place under the terms of a Natural England Licence and that compensation planting will be carried out in the Autumn.
     
    30854, RLinkinS, cct man и 4 другим нравится это.
  3. alastair

    alastair Well-Known Member

    Дата регистрации:
    7 ноя 2005
    Сообщения:
    1.277
    Симпатии:
    793
    jnc, 30854 и H Cloutt нравится это.
  4. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.036
    Симпатии:
    1.505
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Alastair - I dare say there will be comments on Social Media in due course.
    With regard to the level crossing - some one has asked this question on the blog - the response was "All in hand. Updates coming along". Exciting times!
     
    alastair нравится это.
  5. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    They would not be permitted to work on any highway without permission of the highway authority which is unlikely until the design of the level crossing is agreed, which might not be until after the inquiry. Even if the design was agreed the railway could not operate the crossing without the TWA also agreed and the Order made.
     
    Last edited: 16 июл 2019
    jnc и alastair нравится это.
  6. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.036
    Симпатии:
    1.505
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Junction Road is the responsibility of East Sussex County Council who may have different criteria than Highways England. My understanding was that this crossing would be monitored from Robertsbridge along with the A21 and North Bridge Street - so it is likely that there will be interim arrangements. Not sure whether the TWAO is required before this phase of construction. No doubt someone will enlighten us.
     
    jnc нравится это.
  7. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    ESCC are the highway authority for Junction Rd & Northbridge St.
    Highways England are the highway authority for the A21.
    In all 3 cases the TWAO is required before a level crossing can be operated, and highway licences required (relatively simple once the TWAO is obtained) to carry out works.
     
    Last edited: 17 июл 2019
    jnc нравится это.
  8. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.426
    Симпатии:
    12.626
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Will the Junction Rd- Austins Bridge section need a separate TWAO ? just for this section , As its already passed into the ownership of the RVR, I would assume it will not be part of the public enquiry ?
     
  9. Wenlock

    Wenlock Well-Known Member Friend

    Дата регистрации:
    26 окт 2008
    Сообщения:
    2.126
    Симпатии:
    1.381
    Пол:
    Мужской
    Род занятий:
    Bus Driver
    Адрес:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The public enquiry is not about ownership. It is about permission to operate the railway from the end of the KESR's Light Railway to the station at Robertsbridge. Ownership only come into the enquiry as necessary for compulsory purchase powers.

    As I understand it the RVR's demonstration train service at Robertsbridge operated under a special licence, a TWAO was not required as it crossed no public roads as well as being wholly on their own land.

    The fact that RVR now owns a further short stretch of former trackbed does mean that the question of Compulsory Purchase does not apply to that stretch.
     
    jnc и martin1656 нравится это.
  10. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    It won’t need a separate TWAO. The single TWAO application is for the whole of the railway between Bodiam and Robertsbridge. This includes the bits already owned and/or built since a TWA Order creates powers to operate the railway as well as powers of compulsory purchase; and powers to build and operate level crossings over highways. Any of these things may be considered at the inquiry.
     
    jnc нравится это.
  11. alastair

    alastair Well-Known Member

    Дата регистрации:
    7 ноя 2005
    Сообщения:
    1.277
    Симпатии:
    793
    Last edited: 1 ноя 2019
    Davo, domeyhead, Martin Perry и 3 другим нравится это.
  12. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.036
    Симпатии:
    1.505
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good to see progress being made and reported. It states that a further update will be made shortly. The report also states that there are still environmental constraints at the western end.
     
  13. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.119
    That’s right. Unlike private land a highway (or the right to build a crossing over it) cannot be bought or sold - it requires the legal process.
     
    alastair нравится это.
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.426
    Симпатии:
    12.626
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How is the level crossing likily to be installed ? will it be pre cast assembled sections dropped into a trench dug into the road, and overnight road closures , or a short term re routing of the road, single track, round the work area with control lights and the work is done whilst the road remains open and once done, and the crossing done, can resume its original route ?
     
  15. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.036
    Симпатии:
    1.505
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder whether the same method will be used as at the Rolvenden crossing on the KESR back in 2017. This used the Edilon Sedra system. There is an article in rail engineer about this - link below
    https://www.railengineer.co.uk/2017/06/07/revolutionary-level-crossing-on-kent-heritage-railway/
     
    Wenlock и mdewell нравится это.
  16. nine elms fan

    nine elms fan Part of the furniture

    Дата регистрации:
    18 сен 2012
    Сообщения:
    2.439
    Симпатии:
    855
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yeh one of them! :)
     
  17. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.664
    Симпатии:
    4.126
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Further update:
    http://rvrailway.blogspot.com/
    Showing preparation for the reinstatement of Junction Road siding, which will IIRC, become a passing loop, which raises the question how will this be controlled, given its remote location? Will it be from the crossing cabin at Robertsbridge, via a pair of colour light signals? Power operated points?
    Anyone have any info on this?
     
  18. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.426
    Симпатии:
    12.626
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Will it be in use all the time though? Northiam makes most sence as the crossing place on normal timetables, but clearly there will have to be colour lights to protect the crossing so most likily it will have a frame that is switched in when needed, and a flagman who will operate it unless its operated from the train staff , and train crew operate the points .
     
  19. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.664
    Симпатии:
    4.126
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The signalling would, I surmise, be there to protect single line working rather than the road Crossing itself. But I think for a moment- Northiam is roughly the halfway point on the route between Tenterden and Robertsbridge, therefore Junction Road would be the only passing place west of Northiam. So any service requiring more than a two train operation would by necessity, need to use the Junction Road loop.
     
  20. Fireline

    Fireline Well-Known Member

    Дата регистрации:
    11 фев 2008
    Сообщения:
    1.323
    Симпатии:
    1.415
    Пол:
    Мужской
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If memory serves correctly, the intention is to have a Signal box there. Presently, the token section would be Northiam - Robertsbridge, which would be too long. I suspect we may be in a "Damens Loop" situation here.
     

Поделиться этой страницей