If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

Rasprava u 'Heritage Railways & Centres in the UK' pokrenuta od gwr4090, 15. Studeni 2007..

  1. Snifter

    Snifter Well-Known Member

    Pridružen(a):
    26. Kolovoz 2014.
    Poruka:
    1,693
    Lajkova:
    4,299
    Spol:
    Muškarac
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How quickly we forget.
     
  2. johnofwessex

    johnofwessex Resident of Nat Pres

    Pridružen(a):
    6. Travanj 2015.
    Poruka:
    9,788
    Lajkova:
    7,933
    Spol:
    Muškarac
    Interesi:
    Thorn in my managers side
    Grad:
    72
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I met the GWSR Head of Drains & had a fascinating conversation, clearly its a far more important & complex issue than you might think
     
  3. Miff

    Miff Part of the furniture Friend

    Pridružen(a):
    17. Lipanj 2008.
    Poruka:
    3,040
    Lajkova:
    3,116
    If you mean the Ex6+1 I entirely agree with you.
     
    Paul Kibbey se sviđa ovo.
  4. threelinkdave

    threelinkdave Well-Known Member

    Pridružen(a):
    1. Kolovoz 2013.
    Poruka:
    2,065
    Lajkova:
    1,240
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Stratford-upon-Avon or in a brake KD to BH
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Drains and culverts are extreemly important. On the SVR they are inspected yearly and using a drain jetting lorry on a wellwagon are flushed through
     
  5. mdewell

    mdewell Well-Known Member Friend

    Pridružen(a):
    23. Ožujak 2005.
    Poruka:
    1,942
    Lajkova:
    3,025
    Interesi:
    UK & Ireland Heritage Railways Webmaster
    Grad:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Pardon my going slightly off topic but . . . .
    . . . I work in IT and we often have outside consultants reviewing our systems and procedures etc. While there is a slight element of 'Don't mangement trust us to do our jobs properly?, this is more than offset by the occasions when a report fully agrees with things we have been saying for ages. It sometimes takes an external expert to add their weight to your arguments before an issue is given appropriate attention and any necessary resources (aka money!) allocated to the rectifying the issue(s). On balance we usually welcome such reviews.:)
    And if they find something we had overlooked, :oops: then embarassing though that might be, it does enable us to do a better job in future.
     
    Paul Kibbey, oddsocks, Wenlock i 13 ostalih se sviđa ovo.
  6. misspentyouth62

    misspentyouth62 Well-Known Member

    Pridružen(a):
    8. Studeni 2017.
    Poruka:
    1,790
    Lajkova:
    2,358
    Spol:
    Muškarac
    Grad:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whilst I do agree, as someone who has also worked in IT Service Management for many years and has just retired, there is an added comment that I should wish to make whereby ; where an outside organisation are contracted at great expense to tell a business what they already knew, this can have a not-insignificant negative impact on the performance of the incumbent expertise within.
     
    Paul Kibbey se sviđa ovo.
  7. simon

    simon Resident of Nat Pres

    Pridružen(a):
    26. Lipanj 2006.
    Poruka:
    11,906
    Lajkova:
    5,611
    It may be that the auditors do not have faith in the internal view of the costs of restoring the WSR trackbed and track to the desired standard and, in order to break the impasse, the Board have decided to employ external professionals to come up with a cost estimate
     
  8. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,168
    Lajkova:
    29,588
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Or, in the spirit of speculation, that the size of any writedowns of the value of the infrastructure (and which would hit both P&L and balance sheet) need a lot more time to work through and agree than would a "normal" set of accounts.

    The point being not that you, I or anyone else are right, but that there may be very good practical reasons why the normal lead time for production of accounts is impractical.
     
    jnc se sviđa ovo.
  9. 30854

    30854 Resident of Nat Pres

    Pridružen(a):
    8. Ožujak 2017.
    Poruka:
    12,172
    Lajkova:
    11,496
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    ..... as I discovered for myself at Goat Cutting, Beddgelert, in 1972, when the then abandoned formation proved to be a decidedly boggy thigh-deep ditch! :(

    It isn't all about the glamour jobs like raking out ashpans and smokeboxes, oiling inaccessible inside motions and most important of all, ensuring the workshop doesn't run out of tea bags, is it? :D
     
  10. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Pridružen(a):
    2. Listopad 2015.
    Poruka:
    8,176
    Lajkova:
    6,852
    Spol:
    Muškarac
    Grad:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Maybe engineering or infrastructure consultants are different by my experience of outside consultants (Supply Chain, Marketing, Component Overhaul) was to agree that very little if anything you currently did was good enough and hence justify their suggestions and fee.
     
    Bluenosejohn and jnc like this.
  11. free2grice

    free2grice Part of the furniture Friend

    Pridružen(a):
    19. Rujan 2005.
    Poruka:
    5,657
    Lajkova:
    3,686
    Spol:
    Muškarac
    Interesi:
    Retired Rolls-Royce engineer
    Grad:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    An example of that was when we had an inspection at Rolls-Royce of an engineering department. We were confident that all was well and were surprised when the group of inspectors found a problem. They had discovered a can of 3 in 1 oil that was out of date (what?). It transpired that the date on the can was when the oil was produced. The embarrassed group departed rather quickly. <BJ>
     
    baldbof, oddsocks, daveb i 5 ostalih se sviđa ovo.
  12. Keith Sims

    Keith Sims Member

    Pridružen(a):
    22. Ožujak 2015.
    Poruka:
    237
    Lajkova:
    702
    Spol:
    Muškarac
    Interesi:
    retired from volunteering
    Grad:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To ask a silly question?
    Several years ago, at considerable expense and disruption to services, the loop at Williton was extended. The reason given was to allow trains to use the whole Up platform. Having traveled from and back to Williton today I noticed that the up trains still stop way back from the end of the platform, where they always did! The last 2 or so carriages off the end of the platform! Progress? Can anyone explain WHY?
     
    malcolm imps se sviđa ovo.
  13. toplink

    toplink New Member Friend

    Pridružen(a):
    28. Ožujak 2006.
    Poruka:
    159
    Lajkova:
    91
    Interesi:
    Signalman (retired)
    Grad:
    South Dorset & sometimes Somerset, now Spain
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If the UP train arrives first and there is going to be a while before the DOWN comes in, it has to wait behind the footbridge so as the crossing is free to road traffic. When trains arrive within a few minutes of each other then the the full length of the platforms can be used.
    Prior to all the work being done only one train at a time could be allowed into the station, with the new layout both trains can come in at the same time that way train arrival and departures can be completed much more swiftly.
     
    jnc se sviđa ovo.
  14. gwilialan

    gwilialan Well-Known Member

    Pridružen(a):
    8. Prosinac 2012.
    Poruka:
    1,715
    Lajkova:
    4,010
    Spol:
    Muškarac
    Grad:
    Out there somewhere
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Memories of many happy (?) days fighting my way through the ditches, brambles and nettles on the low side of the railway listening for the sound of merrily trickling water, (usually in the biggest clump of brambles), pulling the undergrowth away and saying to myself "There's another one that's not on the plans then" Such fun. :rolleyes:
     
    Bluenosejohn, 35B, 30854 i 4 ostalih se sviđa ovo.
  15. Keith Sims

    Keith Sims Member

    Pridružen(a):
    22. Ožujak 2015.
    Poruka:
    237
    Lajkova:
    702
    Spol:
    Muškarac
    Interesi:
    retired from volunteering
    Grad:
    Somerset
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My point is , why cannot the engine pull forward to the end of the platform as it does at Blue Anchor? Why wait behind the footbridge? I understand about not fouling the road crossing.
     
  16. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Pridružen(a):
    27. Travanj 2014.
    Poruka:
    11,409
    Lajkova:
    18,272
    Spol:
    Žena
    Interesi:
    Barrister
    Grad:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    For the up train to run in without the gates being shut the signal has to be back where it is behind the footbridge.

    Robin
     
  17. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,168
    Lajkova:
    29,588
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is that just a question of sighting, or something else? It seems an odd constraint.
     
  18. toplink

    toplink New Member Friend

    Pridružen(a):
    28. Ožujak 2006.
    Poruka:
    159
    Lajkova:
    91
    Interesi:
    Signalman (retired)
    Grad:
    South Dorset & sometimes Somerset, now Spain
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Keith, the issue is with the locking of the crossing by the trackcircuit between the footbridge and the crossing. At Blue Anchor the down signal, BA3, is only 4 feet from the crossing that it protects. At Williton the protecting signal for the crossing is WN4 i.e. the one by the footbridge. The up starter WN5 is the Taunton side of the crossing, in front of the road bridge and is there to protect the points onto the single line.
    This whole scenario only happens occasionally as most of the time the down train comes in first. Also it's further for the signalman to walk, so we try not to use this procedure unless it's absolutely necessary.
     
  19. Robin Moira White

    Robin Moira White Resident of Nat Pres

    Pridružen(a):
    27. Travanj 2014.
    Poruka:
    11,409
    Lajkova:
    18,272
    Spol:
    Žena
    Interesi:
    Barrister
    Grad:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No. For the up train to be able to run in without the gates open if it runs in first, the protecting signal has to be sufficiently back from the crossing that if the train overran the signal 'a bit' it would not end up on the crossing.

    Robin
     
    Paul Kibbey and malcolm imps like this.
  20. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    29,168
    Lajkova:
    29,588
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm even more confused, then. Taking that at face value, how does it square with the layout at Blue Anchor, where there is a significantly smaller "bit" for an overrun, and to what I'd have thought was a riskier crossing.

    Please be kind to this non-expert in signalling design and rules!
     

Podijelite ovu stranicu