If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Brighton Atlantic: 32424 Beachy Head

Discuție în 'Steam Traction' creată de Maunsell man, 20 Oct 2009.

  1. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.072
    Aprecieri primite:
    5.361
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That doesn't explain trams. Steel wheels on steel rails have a far lower rolling resistance than rubber on asphalt so far more fuel efficient. A by-product is that it's easier to supply electricity rather than use an internal combustion engine.

    Sorry for the thread drift.
     
    andrewshimmin și ross apreciază asta.
  2. Spamcan81

    Spamcan81 Nat Pres stalwart

    Înscris:
    25 Aug 2007
    Mesaje:
    35.836
    Aprecieri primite:
    22.273
    Ocupație:
    Training moles
    Locație:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But more frequently than Austerities and Ivatts ran on the IoW. If you must apply Hitch’s Law at all, please apply it to your own railway too.
     
    Maunsell man, Diamond Gaz, Johnme101 și alți 8 apreciază asta.
  3. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Is that what you meant to say? Surely the main *dis*advantage of pure electric railways is the need to provide all the power distribution infrastructure.
     
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.798
    Aprecieri primite:
    64.476
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, along with in essence a tender underframe, complete with wheelsets. I suspect a finger-in-the-air estimate would be that those parts saved at least £500k from the project cost relative to a design in which they would have had to have been built new.

    Tom
     
    S.A.C. Martin apreciază asta.
  5. LMS2968

    LMS2968 Part of the furniture

    Înscris:
    1 Sep 2006
    Mesaje:
    3.072
    Aprecieri primite:
    5.361
    Sex:
    Masculin
    Ocupație:
    Lecturer retired: Archivist of Stanier Mogul Fund
    Locație:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, it is what I meant to say. There is a lot of infrastructure with rail anyway, but the railways / tramways felt that the additional infrastructure required for electrification more than repaid the original capital and ongoing maintenance costs. You don't need to look far for the evidence of this.
     
    Miff apreciază asta.
  6. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.912
    Aprecieri primite:
    5.849
    I've hesitated to join in the discussion of trams because it is extreme thread drift. However --- I had long been bemused by how trams went in and out of favour. I presumed that their pros and cons relative to diesel buses and trolley buses much have been fairly finely balanced for it to tip first one way and then the other. A book that I read recently https://www.bookdepository.com/Rail...ys-Britain-Ireland-Oliver-Green/9781473822238 (I think following a link on here) is mainly a history but along the way it does shed a bit of light on why trams came, went away in most places, and have now come back in a few places. It was partly down to perceptions of whether they reduced or increased congestion in city streets. In the particular case of London there was also the initial choice of technology with power in a conduit below the street, which caused some problems in operation and would have been extremely expensive to renew.
     
    S.A.C. Martin apreciază asta.
  7. nine elms fan

    nine elms fan Part of the furniture

    Înscris:
    18 Sep 2012
    Mesaje:
    2.439
    Aprecieri primite:
    855
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Were there not two boilers found, if so what happened to the other one!
     
  8. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.798
    Aprecieri primite:
    64.476
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There were two - the Bluebell acquired one of them. The other I believe was subsequently scrapped.

    Tom
     
    S.A.C. Martin și nine elms fan apreciază asta.
  9. nine elms fan

    nine elms fan Part of the furniture

    Înscris:
    18 Sep 2012
    Mesaje:
    2.439
    Aprecieri primite:
    855
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thank You.
     
    Jamessquared apreciază asta.
  10. Jimc

    Jimc Part of the furniture

    Înscris:
    8 Sep 2005
    Mesaje:
    4.117
    Aprecieri primite:
    4.821
    Ocupație:
    Once computers, now part time writer I suppose.
    Locație:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh yes, quite agree that carting your own high pollution mini power station around with you is best avoided whenever possible.
     
  11. marshall5

    marshall5 Part of the furniture

    Înscris:
    26 Oct 2010
    Mesaje:
    2.521
    Aprecieri primite:
    4.359
    Locație:
    i.o.m
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ... at Steam and Sail IIRC.
    Ray.
     
  12. ross

    ross Well-Known Member

    Înscris:
    18 Mai 2017
    Mesaje:
    1.002
    Aprecieri primite:
    2.477
    Sex:
    Masculin
    Locație:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ok, obviously I am a rail enthusiast, or I wouldn't be on here at all.
    My point is that if one were attempting to run a public transport service from East Grinstead to Sheffield Park, on intermittent days, carrying, say, 20,000 passengers per year, then a bus, with its low staffing requirement and a road tax of £500 per year would be a much more economical approach than owning, maintaining and insuring your own infrastructure. Driver wages, road tax, vehicle insurance, public liability insurance, minor maintenance and servicing costs with off the shelf parts....That's it. The county runs the signalling and maintains the p-way, bridges, and everything else.
    The mechanical advantages of steel wheel and rail don't come into it.
    As you've mentioned trams- (I rather like them too), there's no answer to questions like "what happens if there is something occurs, collision, breakdown, etc. that blocks your tram line at 7.45am?" a tyred bus can be possibly squeeze round, or be routed around a significant obstruction. A rail vehicle can't. Think of the vast investment required to open up a new route, and the loss incurred if the hoped-for traffic does not materialise-compare that with leasing 3 or 4 additional vehicles to trial a new route, and surrendering them if it turns out the ridership does not support the service.
    My view is that if road buses can cope with the traffic, then the traffic is inadequate to support a rail service.
     
    Eightpot, jnc, paulhitch și încă o persoană apreciază asta.
  13. paulhitch

    paulhitch Guest

    They are a sensible size and type for the use and not newbuilds.
     
  14. Allegheny

    Allegheny Member

    Înscris:
    8 Mai 2015
    Mesaje:
    637
    Aprecieri primite:
    311
    Sex:
    Masculin
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The railway will need a suitably beefy connection to the grid supply, and this might also need an upgrade, particularly in remote ateas, which will add to the costs.
     
  15. Nick C

    Nick C Well-Known Member

    Înscris:
    5 Iul 2018
    Mesaje:
    1.526
    Aprecieri primite:
    1.759
    Sex:
    Masculin
    Locație:
    Hampshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Quite right - the Bluebell should be building/restoring locomotives of a sensible size and type - I'd suggest something of power classification 4p, given their traffic patterns. Such as, for example, an LBSCR H2 Atlantic...
     
    andrewshimmin, Spinner, ChrisBridges și alți 11 apreciază asta.
  16. nine elms fan

    nine elms fan Part of the furniture

    Înscris:
    18 Sep 2012
    Mesaje:
    2.439
    Aprecieri primite:
    855
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cor that sounds good. :rolleyes:
     
    ChrisBridges, Bluenosejohn, 35B și alți 2 apreciază asta.
  17. misspentyouth62

    misspentyouth62 Well-Known Member

    Înscris:
    8 Noi 2017
    Mesaje:
    1.718
    Aprecieri primite:
    2.222
    Sex:
    Masculin
    Locație:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I assume that the choices, why's and wherefores of H2 Atlantic build on The Bluebell were made in the 1990s or have I missed something? I would also have thought given the extensive progress made so far that to change direction now would be more expensive than to finish what folk have put their money into?
     
  18. ross

    ross Well-Known Member

    Înscris:
    18 Mai 2017
    Mesaje:
    1.002
    Aprecieri primite:
    2.477
    Sex:
    Masculin
    Locație:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The social media of the day was alive with opinions. The amount of ticker-tape expended on the livery debate alone was astounding...
     
    Jamessquared, flying scotsman123 și 30854 apreciază asta.
  19. Eightpot

    Eightpot Resident of Nat Pres Friend

    Înscris:
    10 Aug 2006
    Mesaje:
    8.340
    Aprecieri primite:
    2.506
    Sex:
    Masculin
    Ocupație:
    Engineer Emeritus
    Locație:
    Aylesbury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is an hourly bus service from Aylesbury to Milton Keynes, which in the light of the above makes me wonder if the yet-to-be-built East - West Link between the two towns is really a viable proposition.
     
  20. ross

    ross Well-Known Member

    Înscris:
    18 Mai 2017
    Mesaje:
    1.002
    Aprecieri primite:
    2.477
    Sex:
    Masculin
    Locație:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    IIRC there is an existing rail route, via Calvert/Steeple Claydon so a passenger rail service would be additional traffic on a line that could easily cope. Is that route currently up to passenger standards, it was freight only when I grew up in Buckinghamshire (70s,80's).
    Even so, a branch line service running 28miles through rather sparsely populated north Bucks (where most people own cars), competing against the no150 bus and its hourly 75minute service will be tough.
     

Distribuie pagina asta