If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Gav106, بتاريخ ‏8 ماي 2010.

  1. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,443
    عدد المعجبين:
    1,749
    What a bizarre looking repair. I’m no bridge engineer and I daresay it’s fit for purpose but it’s a shame they couldn’t maintain the original appearance. Oh well.


    Sent from my iPhone using Tapatalk
     
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Give it the same colour paint as the rest of the bridge and I doubt you would ever notice. How often have you looked at bridges and failed to notice repairs carried out. Such things aren't exactly rare. Those at Goathland, for example, have lots of extra metal bits attached to them from repairs going back many years.
     
    domeyhead, TseTT, jnc و 1 شخص آخر معجبون بهذا.
  3. ilvaporista

    ilvaporista Part of the furniture

    إنضم إلينا في:
    ‏16 يناير 2006
    المشاركات:
    4,356
    عدد المعجبين:
    5,456
    الجنس:
    ذكر
    الوظيفة:
    C.Eng
    مكان الإقامة:
    On the 45th!
    Yes, I dare say that in a few years time when we see pictures of majestic steam locomotives passing over the canal the eye will be drawn to the repairs and the picture will be ruined by the extra rows of rivets...
     
    30854, Steve و Bluenosejohn معجبون بهذا.
  4. jsm8b

    jsm8b Part of the furniture

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    3,165
    عدد المعجبين:
    7,591
    الجنس:
    ذكر
    الوظيفة:
    Escapee from the corporate bear-pit
    مكان الإقامة:
    Shropshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Just PLEASE - Not the Network Rail Green :Arghh:


    (Bridge livery debate for a change :p)
     
    pmh_74, jnc و John Petley معجبون بهذا.
  5. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wow! Bridge livery? ..... Is this a 'first' for NP? :)
     
    TseTT, Bean-counter و Bluenosejohn معجبون بهذا.
  6. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,416
    عدد المعجبين:
    12,617
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So, whats the next hurdle to be tackled once the bridge is done will it be to rebuild the embankment then the bridge sections, or is it to work down from the midland mainline line end ?
     
  7. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,550
    عدد المعجبين:
    659
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The bridge sections over preci spark car park and railway terrace i think are next. It would make sense how high the south side of the bridge is going to be over railway terrace so then the civil engineers know how high to mount up the railway enbankment.
     
  8. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,044
    عدد المعجبين:
    6,447
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would like to think that ...If a LOT of money came in quickly, they could have three work sites and get the MML bridge connected North, Precispark and road bridged, whilst "embanking" North from the Canal Bridge!
    But it is fantastic that they are steadily working to get the Gap bridged.
     
    weltrol, Martin Perry و jnc معجبون بهذا.
  9. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,443
    عدد المعجبين:
    1,749
    It wasn't so much the rivets that drew my eye (after all, a riveted repair is about as traditional as it gets), but the weird end-on bit of I-beam.

    I can assure you that I would notice, but then I'm an engineer not a modeller or photographer.
     
    أعجب بهذه المشاركة Drop_Shunt
  10. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If that had been an old repair done in BR days would you still decry it or say and excellent job that has saved a lot of money on replacement?
    Steve; a Chartered Engineer and not a modeller or photographer.
     
    std tank, keith6233, jnc و 1 شخص آخر معجبون بهذا.
  11. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,044
    عدد المعجبين:
    6,447
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is a closer view and I think it will blend in when painted - but it certainly looks to be a significantly stronger arrangement. Well done, so far, to all concerned.

    DSCF7245s.jpg
     
  12. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bizarre? It's a matter of opinion.
    Fit for purpose? Almost certainly.
    Maintain original appearance? There will be a reason that's for the engineers and the GCR to know.

    Either way it's 'job done' and in the fullness of time who will really be bothered?
     
    jnc, brmp201 و Bluenosejohn معجبون بهذا.
  13. free2grice

    free2grice Part of the furniture Friend

    إنضم إلينا في:
    ‏19 سبتمبر 2005
    المشاركات:
    5,657
    عدد المعجبين:
    3,686
    الجنس:
    ذكر
    الوظيفة:
    Retired Rolls-Royce engineer
    مكان الإقامة:
    Bath Green Park / Mangotsfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's always one. :rolleyes: <BJ>
     
  14. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,443
    عدد المعجبين:
    1,749
    A fair question. I’m not ‘decrying’ it though, I merely commented about its appearance. I’m more than happy that it’s fit for purpose.

    Yes I’m also a CEng but anyway, lets move on.




    Sent from my iPhone using Tapatalk
     
    أعجب بهذه المشاركة Drop_Shunt
  15. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    242
    عدد المعجبين:
    371
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Speaking with my architectural conservationist hat on, it's an honest repair that's identifiably not part of the original structure, in much the same vein as on historic buildings you will see masonry walling repaired with tile and mortar. The whole point being that it identifies 'this is a repair' that adds to how an architectural historian could read the structure (if you want to go down the academic route), or alternatively shows future generations of engineers and maintenance crews what has already been done to keep the structure stable (going down the feet on the ground nuts-and-bolts route).

    Personally I'm just pleased to see work really progressing with the second stage of the unification project.
     
    domeyhead, jnc, marshall5 و 2 آخرون معجبون بهذا.
  16. AndyY

    AndyY Member

    إنضم إلينا في:
    ‏23 فبراير 2013
    المشاركات:
    433
    عدد المعجبين:
    480
    I am very pleased that the original bridge is being repaired rather than replaced with a modern concrete slab.
     
    weltrol, MuzTrem, Wenlock و 4 آخرون معجبون بهذا.
  17. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,044
    عدد المعجبين:
    6,447
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The canal bridge is now encased whilst they shot blast the underside. DSCF7297.JPG
     
    J Rob't Harrison, Kempenfelt 82e, jnc و 4 آخرون معجبون بهذا.
  18. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,044
    عدد المعجبين:
    6,447
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is an updated video on the GCR website, showing the work being done inside the cocoon, (sorry but I do not know how to put up a direct link).
     
    أعجب بهذه المشاركة jnc
  19. Groks212

    Groks212 Well-Known Member

    إنضم إلينا في:
    ‏5 إبريل 2009
    المشاركات:
    1,152
    عدد المعجبين:
    1,019
    مكان الإقامة:
    Nottingham
    This link?



    Dave B
     
    Bluenosejohn, jnc و The Dainton Banker معجبون بهذا.
  20. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,044
    عدد المعجبين:
    6,447
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer

مشاركة هذه الصفحة