If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Rother Valley Railway

Discussie in 'Heritage Railways & Centres in the UK' gestart door nine elms fan, 4 nov 2012.

  1. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.263
    Leuk Bevonden:
    12.515
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can't think of anywhere that may have enough space to install it, without buying up some more somewhere, best place would be Tenterden, if some land can be acquired just beyond the C&W Workshop be ideal then for evening out wear on flanges etc, and turning the odd visiting engine from the Main line . either that, or at Robertsbridge, but I would imagine there is no spare space .
     
  2. Mark Thompson

    Mark Thompson Well-Known Member

    Lid geworden:
    10 sep 2017
    Berichten:
    1.591
    Leuk Bevonden:
    3.934
    Geslacht:
    Man
    Locatie:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Reading the blog, the RVR seem to have a plan, which is hardly surprising, but they're going to reveal it in bite-sized installments!
     
  3. Miff

    Miff Part of the furniture Friend

    Lid geworden:
    17 jun 2008
    Berichten:
    3.000
    Leuk Bevonden:
    3.023
    Intriguing :) Would there be enough room in the proposed expansion of Rolvenden (K&ESR already own an adjacent field)? Or will it fit on the small ‘engine shed’ site in the Robertsbridge plans?
     
  4. class8mikado

    class8mikado Part of the furniture

    Lid geworden:
    1 jun 2009
    Berichten:
    3.840
    Leuk Bevonden:
    1.644
    Beroep:
    Print Estimator/ Repository of Useless Informatio.
    Locatie:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    60footer ?
     
  5. H Cloutt

    H Cloutt Well-Known Member

    Lid geworden:
    22 dec 2018
    Berichten:
    1.024
    Leuk Bevonden:
    1.498
    Geslacht:
    Man
    Locatie:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A picture of part of the turntable on a heavy transport vehicle appears on the RVR blog. So it must be on its way somewhere. We will just have to wait and see.
     
    jnc vindt dit leuk.
  6. nine elms fan

    nine elms fan Part of the furniture

    Lid geworden:
    18 sep 2012
    Berichten:
    2.439
    Leuk Bevonden:
    855
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Wessex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    See post 1240.
     
    H Cloutt vindt dit leuk.
  7. H Cloutt

    H Cloutt Well-Known Member

    Lid geworden:
    22 dec 2018
    Berichten:
    1.024
    Leuk Bevonden:
    1.498
    Geslacht:
    Man
    Locatie:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    According to a post on the RVR blog it's 70feet.
     
  8. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.263
    Leuk Bevonden:
    12.515
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that's going to need one very big hole digging
     
    H Cloutt vindt dit leuk.
  9. weltrol

    weltrol Part of the furniture Friend

    Lid geworden:
    29 dec 2008
    Berichten:
    2.842
    Leuk Bevonden:
    687
    That'll give plenty of materials for rebuilding a missing embankment somewhere....;)
     
    H Cloutt vindt dit leuk.
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.263
    Leuk Bevonden:
    12.515
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I heard the new plan is to build a ribblehead style viaduct across the A21, across to Austins bridge, and to build a great spiral to raise the track height ;)
     
    H Cloutt, Wenlock en burnham-t vinden dit leuk.
  11. Miff

    Miff Part of the furniture Friend

    Lid geworden:
    17 jun 2008
    Berichten:
    3.000
    Leuk Bevonden:
    3.023
    How about a combined level crossing and turntable on the A21? :) Utterly pointless but wouldn’t it be nice?
     
    Wenlock vindt dit leuk.
  12. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.729
    Leuk Bevonden:
    11.847
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You could always install it in the roundabout on the A21. That would save on land use. ;)
     
    Hampshire Unit, H Cloutt, pmh_74 en 7 anderen vinden dit leuk.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.263
    Leuk Bevonden:
    12.515
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Actually, whilst the installation of the level crossing , if it goes ahead, ( not counting chickens etc) there will need to be a diversion in place won't there, I would assume then that traffic will have to use the old A21 through Roberts bridge re joining at Northbridge St.
     
    H Cloutt vindt dit leuk.
  14. H Cloutt

    H Cloutt Well-Known Member

    Lid geworden:
    22 dec 2018
    Berichten:
    1.024
    Leuk Bevonden:
    1.498
    Geslacht:
    Man
    Locatie:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When KESR replaced the level crossing at Rolvenden - this was done overnight - they used some sort of prefabricated unit with the rails already installed. I suspect that RVR will use something similar to get the trackbed in place - so there may not be too much disruption. The barriers would be installed seperately. I suspect that the level crossing at Junction Road will be installed first.
     
    jnc vindt dit leuk.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Lid geworden:
    8 dec 2014
    Berichten:
    19.263
    Leuk Bevonden:
    12.515
    Geslacht:
    Man
    Locatie:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would imagine the work will be much harder and possibly take longer than just one night, for starters the road has to be dug out, and any cables etc re routed, at rolvendon, the old crossing only had to be removed and any reworking done, at Junction Rd, its all got to be done fresh, from scratch, even using modern methods, can the road be dug up levelled and the track laid all in one night, ? On the A21, I would imagine, that the road will have to be closed overnight with diversions In place, anyway, possibly for more than just the one overnight period, as later installing and testing Barriers will have to be done also and that will need another localised road closure .
     
    Wenlock vindt dit leuk.
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.793
    Leuk Bevonden:
    64.460
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    With most things in infrastructure, you can work incredibly quickly provided you throw sufficient resource at it, and have planned adequately. So a single night to install the rails across the road wouldn't seem beyond reasonable to me - after all, you are really only talking about digging out a road and resurfacing for a length of twenty feet or so to cover the width of the railway. I don't know exactly how you commission a new level crossing (presumably there is systems testing on the interface between road and railway signals, and the signals / hardware interface of the actual infrastructure) but I suspect some of that could be done without a closure, and any final proving could happen over one or more nights.

    All of which is funding-dependent of course (who pays for that sort of work - the railway or the Highways Authority?), and of course also dependent on a huge amount of advance planning so that the actual disruption is minimised.

    Tom
     
    35B en Steve vinden dit leuk.
  17. Steve

    Steve Resident of Nat Pres Friend

    Lid geworden:
    7 okt 2006
    Berichten:
    12.729
    Leuk Bevonden:
    11.847
    Beroep:
    Gentleman of leisure, nowadays
    Locatie:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As you say, planning is the key. Putting the actual crossing in wouldn’t be a big job You can commission the crossing system without the actual barrier arms in place, only fitting these when all else is done.
     
    Jamessquared vindt dit leuk.
  18. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Lid geworden:
    9 okt 2019
    Berichten:
    1.401
    Leuk Bevonden:
    1.772
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    "An Historical Survey of Southern Sheds" by Hawkins & Reeve gives 65ft. It would have been new for opening in 1933. When I saw it in the late 90s it was out of use.
    Pat
     

    Bijgevoegde bestanden:

    garth manor en nine elms fan vinden dit leuk.
  19. Ploughman

    Ploughman Part of the furniture

    Lid geworden:
    1 apr 2008
    Berichten:
    5.969
    Leuk Bevonden:
    2.761
    Beroep:
    Ex a lot of things.
    Locatie:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It is the service provision that wil take the time.
    As has been said the actual Dig, Relay and ballasting and installing of a form of crossing system.
    Bomac panels or Rubber preformed sections more likely.
    That can be done in a reasonable length of possession.
    We used to reballast with 300mm ballast below the sleepers and renew rails and Rubber panels between 22.00 and 09.00 but that would have been about 4 - 5 lengths to get an overlap into the existing either side of the crosing.
    With the RVR crossing it may be possible to cut that length down to about 30ft either side of the crossing.
     
    Steve en jnc vinden dit leuk.
  20. paul1609

    paul1609 New Member

    Lid geworden:
    9 jun 2006
    Berichten:
    67
    Leuk Bevonden:
    111
    Geslacht:
    Man
    Locatie:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer

Deel Deze Pagina