If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Discuție în 'Heritage Railways & Centres in the UK' creată de Gav106, 8 Mai 2010.

  1. fergusmacg

    fergusmacg Resident of Nat Pres

    Înscris:
    17 Aug 2008
    Mesaje:
    6.778
    Aprecieri primite:
    4.148
    Ocupație:
    Design Engineer
    Locație:
    Cumbria
    I see there is a target figure for the next phase I.e. The factory flyover - has there ever been a cost estimate given for that sizeable embankment between this flyover and the canal bridge?


    Sent from my iPad using Tapatalk
     
  2. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.669
    Aprecieri primite:
    2.178
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From memory, the whole scheme was costed a few years back at £8-£9 million, but what savings have been made on the budgeted costs for the 2 phases completed, I don't know. There is still expediture required (after phase 3) on that embankment, the bridge by the Brush works and the embankment north of the MML. I think the shed removal phase has become seperate to the "gap" work now, though it obviously needs to be done in conjunction with the other works.
     
  3. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Lots more to do then, was under the impression that the bit between the new Rail bridge and old Canal bridge was mostly extant
     
  4. Johann Marsbar

    Johann Marsbar Well-Known Member

    Înscris:
    21 Feb 2016
    Mesaje:
    1.669
    Aprecieri primite:
    2.178
    Sex:
    Masculin
    Locație:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Nope.....

    17-1749a.jpg
     
  5. mogulb

    mogulb New Member

    Înscris:
    20 Dec 2010
    Mesaje:
    133
    Aprecieri primite:
    95
    Was largely removed by BR to build the spur line connecting to GCRN.
     
    stallis1 apreciază asta.
  6. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well, it's all open ground...

    Noel
     
  7. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    Indeed, but with a factory on the left which carries out precision engineering work and is concerned about vibration, and a stream on the right which the relevant authorities want to maintain digger access to, hence not just a simple matter of putting the original embankment back in.
     
    jnc apreciază asta.
  8. jnc

    jnc Well-Known Member

    Înscris:
    3 Apr 2012
    Mesaje:
    1.511
    Aprecieri primite:
    2.709
    Sex:
    Masculin
    Locație:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any idea what approaches will be used to tackle those issues?

    Noel
     
  9. pmh_74

    pmh_74 Part of the furniture

    Înscris:
    28 Ian 2009
    Mesaje:
    2.423
    Aprecieri primite:
    1.707
    I think something similar to the Heathrow Express construction at Airport Junction (which allows an 'embankment' with much steeper sides, hence smaller footprint) was talked about at one time, some years ago, but what the latest thinking is I'm afraid I don't know. All will be revealed in due course, no doubt!
     
  10. staffordian

    staffordian Well-Known Member

    Înscris:
    27 Mar 2012
    Mesaje:
    1.524
    Aprecieri primite:
    2.172
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wonder if cwr rather than jointed track might reduce vibration, and maybe a greater ballast depth or a layer of something with some "give" in it under the track?

    I'll be interested to hear the solution.
     
  11. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cork Underlay....
     
    Wenlock, ilvaporista, 2392 și alți 3 apreciază asta.
  12. staffordian

    staffordian Well-Known Member

    Înscris:
    27 Mar 2012
    Mesaje:
    1.524
    Aprecieri primite:
    2.172
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ahh, but on top of chipboard or something else? :D
     
  13. Thompson1706

    Thompson1706 Part of the furniture

    Înscris:
    19 Noi 2007
    Mesaje:
    2.523
    Aprecieri primite:
    1.886
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Polystyrene blocks ?

    Bob.
     
  14. std tank

    std tank Part of the furniture

    Înscris:
    20 Sep 2005
    Mesaje:
    3.927
    Aprecieri primite:
    1.070
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When Network Rail/Railtrack were refurbishing the bridge over the Manchester ship canal at Irlam on the CLC Liverpool to Manchester line, they did away with the bridge that took the line over the original course of River Irwell. Polystyrene blocks were used for the infill to create the new embankment.
     
  15. crantock

    crantock Member

    Înscris:
    22 Noi 2008
    Mesaje:
    528
    Aprecieri primite:
    276
    Sex:
    Masculin
    Ocupație:
    Beancounter
    Locație:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Poly blocks were used on the Nuneaton link from flyover to platform. Need to be well covered though as lineside fires could be interesting.


    Sent from my iPhone using Tapatalk
     
  16. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.319
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Canal bridge is still awaiting the lattice girders, but more brickwork pointing etc has been done.
    Here are two pictures, taken today, of the site for the "Factory Flyover" bridges and arches for phase 3 and 4. There were three orange clad people, further down towards the engine shed, on the embankment base. DSCF7615.JPG DSCF7617.JPG
     
    Goldie și AndyY apreciază asta.
  17. class8mikado

    class8mikado Part of the furniture

    Înscris:
    1 Iun 2009
    Mesaje:
    3.840
    Aprecieri primite:
    1.644
    Ocupație:
    Print Estimator/ Repository of Useless Informatio.
    Locație:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Perhaps someone was going to get 'Tangoed'
     
  18. ianh

    ianh Member

    Înscris:
    10 Mai 2006
    Mesaje:
    335
    Aprecieri primite:
    194
    Ocupație:
    Farmer -
    Locație:
    Brecon In Wettest Wales
    What is the relationship of the 2nd photo to Factory Flyover?
     
  19. mogulb

    mogulb New Member

    Înscris:
    20 Dec 2010
    Mesaje:
    133
    Aprecieri primite:
    95
    To the right of the picture are the remains of bridge abutment that went over the road that leads to the council tip, this will now be bridged by one of ex Reading bridge decks. New abutments either side of the road. Second reading span to the right and then two concrete arches to connect to the MML bridge.
     
    jnc apreciază asta.
  20. Flying Phil

    Flying Phil Part of the furniture

    Înscris:
    10 Dec 2018
    Mesaje:
    3.018
    Aprecieri primite:
    6.319
    Sex:
    Masculin
    Locație:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As Mogulb says....but here is another picture which might make it clearer.... DSCF7616.JPG
    On the extreme right is the new MML bridge. Then it is anticipated there will be two blue brick faced concrete arches, two Ex Reading bridge decks with one crossing the road, then two more arches (needed to get the height needed for tall lorries to access the tip). This will be, to this side of the old brick abutment, just on the corner of the road.
     