Current and Proposed New-Builds

الموضوع في 'Steam Traction' بواسطة aron33, بتاريخ ‏15 أوت 2017.

  1. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,818
    عدد المعجبين:
    12,016
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You can't have the top one. It's not like any other GW loco.:)
     
    أعجب بهذه المشاركة Jamessquared
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You make my point for me :)

    Tom
     
    andrewshimmin, 35B, clinker و 1 شخص آخر معجبون بهذا.
  3. LesterBrown

    LesterBrown Member

    إنضم إلينا في:
    ‏20 يناير 2009
    المشاركات:
    995
    عدد المعجبين:
    761
    مكان الإقامة:
    Devon
    ...and then there's the version with a high elliptical roof Churchward cab, one of which had an extra axle beneath the bunker (2-4-2T).
     
    Last edited: ‏22 إبريل 2020
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Talking of 2-4-2T locos, this is my suggestion for a new build for the post COVID-19 world - social isolation of passengers ensured by each train transporting precisely one passenger at a time. (Driver and fireman must be close family members but on the Bluebell we have multiple opportunities for that).

    [​IMG]

    Tom
     
    BrightonBaltic, hogger, andrewshimmin و 3 آخرون معجبون بهذا.
  5. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,985
    عدد المعجبين:
    2,766
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All look the same to me, so must be GWR:):)
     
    أعجب بهذه المشاركة Paulthehitch
  6. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,083
    عدد المعجبين:
    5,393
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't think you could lean very hard on those buffers!
     
    BrightonBaltic, andrewshimmin, MellishR و 3 آخرون معجبون بهذا.
  7. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer

    I think this is better. The ultimate driver experience loco.

    [​IMG]
     
  8. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,818
    عدد المعجبين:
    12,016
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That was my immediate first thought. Fortunately, it doesn't seem to have been blessed with a drawhook at this end.
     
    LMS2968 و Jamessquared معجبون بهذا.
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think there probably was a draw hook, but it was under the coal bunker and the problem with coupling to another vehicle was finding a long enough rubber band ...

    (for more on the loco, see here: http://haylingbillyheritage.org/category/engines/sharp-stewart/)

    Tom
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wrong thread - this is the new build thread. You can call that one a restoration ... :)

    Tom
     
    andrewshimmin و 5944 معجبون بهذا.
  11. Richard Roper

    Richard Roper Well-Known Member

    إنضم إلينا في:
    ‏22 ماي 2006
    المشاركات:
    1,310
    عدد المعجبين:
    1,359
    الجنس:
    ذكر
    الوظيفة:
    Librarian
    مكان الإقامة:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Probably one of the most bizarre British locos I've seen, apart from the VERY early machinery and later well-known experiments... But what a lovely machine it is!
    Thank You for sharing Tom!

    Richard.
     
    andrewshimmin و Jamessquared معجبون بهذا.
  12. Hunslet589

    Hunslet589 New Member

    إنضم إلينا في:
    ‏19 مارس 2017
    المشاركات:
    126
    عدد المعجبين:
    220
    الجنس:
    ذكر
    مكان الإقامة:
    Oxfordshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Conventional wisdom has it that there had been a "breakdown in communication" between the loco drawing office and the civils such that the loco dept was unaware that the process of working to a 22ton limit on the GW main lines had been ongoing for some years - until it was almost completed. It was (it is alleged) only when the two groups met during the king design process, with the loco guys expecting to have an argument about the proposed axle loading, that it came to light and they where told it would not be a problem... On a select few routes at least.
     
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    At which point, said loco guys went back to the drawing office and said "well, if the civils accepted 22 tons without a fight, lets just make it 25 and not tell them" - allegedly ;)

    Tom
     
    BrightonBaltic و andrewshimmin معجبون بهذا.
  14. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,997
    عدد المعجبين:
    5,922
    It does, and I agree about keeping options open.

    However: reducing the saddle height to position the boiler a bit lower is fairly easy, but what do you do at the other end? Do you accept a small reduction in ashpan space? Does the footplate need to be a bit lower?
     
  15. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,997
    عدد المعجبين:
    5,922
    That makes more sense than the LBSC one. If it doesn't need to pull anything, why bother with coupled wheels?
     
    أعجب بهذه المشاركة BrightonBaltic
  16. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Financially made perhaps less sense for their respective shareholders though. Drummond got to build an entirely new loco at a cost of £1,535 - to put that in context, it was slightly more than the LSWR was paying for an M7 at the same period.Whereas Stroudley took a life-expired Sharp Stewart tank engine and really made very minimal modification!

    Tom
     
    أعجب بهذه المشاركة andrewshimmin
  17. Jon Pegler

    Jon Pegler New Member

    إنضم إلينا في:
    ‏30 جوان 2014
    المشاركات:
    42
    عدد المعجبين:
    30
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All the opponents of the County project who condemn the use of an 8F firebox seem quite happy with a 4700 with a reduced boiler height and narrower cylinders. Double standards, I think
     
  18. LMS2968

    LMS2968 Part of the furniture

    إنضم إلينا في:
    ‏1 سبتمبر 2006
    المشاركات:
    3,083
    عدد المعجبين:
    5,393
    الجنس:
    ذكر
    الوظيفة:
    Lecturer retired: Archivist of Stanier Mogul Fund
    مكان الإقامة:
    Wigan
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    ALL the opponents? You've asked them all?
     
    BrightonBaltic, jnc, andrewshimmin و 7 آخرون معجبون بهذا.
  19. mdewell

    mdewell Well-Known Member Friend

    إنضم إلينا في:
    ‏23 مارس 2005
    المشاركات:
    1,945
    عدد المعجبين:
    3,030
    الوظيفة:
    UK & Ireland Heritage Railways Webmaster
    مكان الإقامة:
    Ruabon, Wrexham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I haven't seen any comments about that (although there may well have been when the project was first being promoted). We are only talking about 2" lower, so I expect a minor adjustment of the boiler supports at the firebox end would be easy enough to acheive and the slight reduction in ashpan depth and firehole acceptable. I doubt a lower footplate would be required.
     
    Last edited: ‏23 إبريل 2020
  20. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's what Pole says, but to my mind it doesn't hold water. The policy change (around 1898) had board level approval and must have been agreed between Inglis and Churchward And the change was by no means "almost completed". Yes, there were few bridges left to upgrade on the London to Plymouth line (four according to Pole) but by 1938 only 522 miles of GWR route was cleared for the Kings, as opposed to 1280 miles at the lower limit. That Collett didn't know about a policy change Churchward and Inglis had put in place when he was just a draughtsman in the drawing office is perhaps unsurprising, if disappointing.

    This business of future proofing infrastructure is one of the classic engineer via accountant battles. The engineer would like (for example) to do every tunnel and bridge repair to the continental structure gauge, because s/he knows that his/her successor will bless him when there are few enough structures left to change that they can finish off the rest in a affordable sized project, whereas there's not the slightest chance approval would be given to a project to upgrade the whole line at once. The accountant will never agree to spending loads of extra money on something that may not give a return for decades. Pole bemoans that one viaduct which had been upgraded to 22 tons had been replaced again before the extra capacity had been used, but if the policy hadn't been in place the Kings couldn't have been introduced.

    Does anyone here know what the situation is on the WR now for weight limits?
     
    BrightonBaltic و jnc معجبون بهذا.