Bridge that Gap: Great Central Railway News

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة Gav106, بتاريخ ‏8 ماي 2010.

  1. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am sure that the GCR have done a risk assessment.....after all, the car parks outside supermarkets seem quite busy now.
     
    أعجب بهذه المشاركة jnc
  2. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good things come to those who wait any trains on the G.C.R. loughborough southern section expected to run phil ?within the next month:Morewaitingisrequired:
     
  3. Greenway

    Greenway Part of the furniture

    إنضم إلينا في:
    ‏16 مارس 2008
    المشاركات:
    4,019
    عدد المعجبين:
    3,804
    الجنس:
    ذكر
    مكان الإقامة:
    South Hams
    Heritage Railway Volunteer:
    No I do not currently volunteer
    But supermarket car parks have always been available and used as the supermarket sold food and was considered an essential service. Testing a steam locomotive is not really the same. I expect, due to publicity on various heritage sites, some controls will be very necessary.
     
    أعجب بهذه المشاركة 2392
  4. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    DSC00050s.jpg The Sunday running went well. There were stewards on duty going into the car parking field giving out a safety briefing sheet. No charge for admission. I was directed to a parking space with more than 2m spacing between cars. Spacing between visitors was also monitored by stewards but everybody was self spacing. There was a 37 on the van train and the Std 2 running light engine. One steward held a donations collection tin which most people contributed too.
    There were about 50 cars and 70 people.
    The engine crews wore masks and gloves.
     
    Last edited: ‏1 جوان 2020
    أعجب بهذه المشاركة jackshepherd
  5. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,840
    عدد المعجبين:
    1,644
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Stand and deliver...
     
  6. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,669
    عدد المعجبين:
    2,180
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Where's Adam Ant when you need him....
     
  7. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I mentioned that the class 37 was running on Sunday. It also went over the Quorn turntable to leave the van train in Quorn Yard. DSC00055s.jpg
     
    jackshepherd و Matt37401 معجبون بهذا.
  8. and60007

    and60007 Member

    إنضم إلينا في:
    ‏1 سبتمبر 2009
    المشاركات:
    533
    عدد المعجبين:
    453
    الجنس:
    ذكر
    الوظيفة:
    Community Operative
    مكان الإقامة:
    Barton upon Humber
    Heritage Railway Volunteer:
    No I do not currently volunteer


    My latest footage, enjoy
     
    ykin01, J Rob't Harrison, jackshepherd و 2 آخرون معجبون بهذا.
  9. Johann Marsbar

    Johann Marsbar Well-Known Member

    إنضم إلينا في:
    ‏21 فبراير 2016
    المشاركات:
    1,669
    عدد المعجبين:
    2,180
    الجنس:
    ذكر
    مكان الإقامة:
    Suffolk
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They are doing another online "Zoom" presentations about "Bridging the Gap" on 28th June in case anyone is interested.
    Details here...
    http://www.gcrailway.co.uk/unify/
     
    أعجب بهذه المشاركة Davo
  10. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I had a look at the canal bridge today and there is no change.....but they still hope to have the work complete by the end of June.
     
  11. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the latest update, they say that over £170,000 has been raised for the "Factory Flyover"...probably closer to £200,000 now.
     
    Davo, Great Western و jnc معجبون بهذا.
  12. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Last night's Zoom presentation of the "Gap" project went well and it resulted in another healthy donation to the fund from the participants. It is good to see that progress is being maintained.
     
  13. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Canal bridge is still without it's Lattice girders today.....But they are due to be put in tomorrow mid-day (ish)!
     
    Davo, J Rob't Harrison و jnc معجبون بهذا.
  14. Davo

    Davo Well-Known Member

    إنضم إلينا في:
    ‏12 اكتوبر 2018
    المشاركات:
    1,539
    عدد المعجبين:
    649
    الجنس:
    ذكر
    مكان الإقامة:
    W yorkshire 56f
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Another major milestone then phil of completing the canal bridge strenghening on the bridge the gap project, Just the factory flyover enbankment and A60 bridge to unlock in the reunification, good work.
    Davo 56F.
     
    Last edited: ‏30 جوان 2020
  15. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It certainly is another milestone but there is still a lot more to do. The "Factory Flyover" next stage, is actually two phases in one go, as there is the Precispark car park bridge and arches, and the Railway terrace road (To recycling centre) bridge and arches. Then the embankment, A60 bridge refurb, North embankment put back....and track laying.
    Keep those donations flowing in folks....:)
     
    jnc و Graft on معجبون بهذا.
  16. J Rob't Harrison

    J Rob't Harrison Member

    إنضم إلينا في:
    ‏6 نوفمبر 2016
    المشاركات:
    240
    عدد المعجبين:
    360
    الجنس:
    ذكر
    مكان الإقامة:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Am I right in thinking that once the Factory Flyover arches and the Railway Terrace decks are in, that the only new civil engineering required after that are the embankments? Or is there another new bridge that I'm forgetting? (assuming the A60 can be a refurb job rather than a complete new bridge).
     
  17. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are quite correct JRob't, and of course they already have the Ex Reading bridge decks for the two Factory Flyover bridge sections.
     
  18. weltrol

    weltrol Part of the furniture Friend

    إنضم إلينا في:
    ‏29 ديسمبر 2008
    المشاركات:
    2,842
    عدد المعجبين:
    687
    Wasn't the A60 bridge 'refurbished ' a few years back?
     
  19. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It might have been when the gypsum traffic started but that was for the single line. I believe the plan is to have double track across that bridge to give space for a complete gypsum train to stand well clear of the chord and GCR trains to run past.
     
  20. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,319
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There was a Large crane at the canal today. It lifted the cantilever beam away. It lifted 4 half sections of the two lattice girders. They were bolted together. It lifted one 40' long lattice girder everso nearly in place....but there was a very tiny clearance problem trying to get the end under the capstone......It does go down further than the picture - but not quite enough it seems. It will be done tomorrow I'm sure.[​IMG][​IMG]
     