West Somerset Railway General Discussion

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем gwr4090, 15 ноя 2007.

  1. Southernman99

    Southernman99 Member Friend

    Дата регистрации:
    10 ноя 2009
    Сообщения:
    946
    Симпатии:
    698
    I'd rather be 10 minutes late in this world than 10 minutes early in the next.
     
  2. staffordian

    staffordian Well-Known Member

    Дата регистрации:
    27 мар 2012
    Сообщения:
    1.524
    Симпатии:
    2.172
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    The Potteries
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My thoughts exactly, and the lack of clarity from the plc is so frustrating, but not surprising.

    Given (IIRC) that there are colour lights of some sort protecting either side of the crossing, and the plan is to replace existing barriers (not traditional gates) with more barriers, albeit different, any argument that it needs semaphores in order to be more "heritage" holds little water.

    I reckon that the work would have been done and dusted well before Covid struck if the plc had not objected to the SCC/Network Rail plan. If it had been the SCC's fault that the work had not been done and hence the railway could not run, I'm pretty sure we would have heard mutterings from the plc about wanting compensation from the Council for lost income.
     
    The Dainton Banker и 35B нравится это.
  3. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    Do not forget that the barriers at Wool are controlled remotely by CCTV and have to be lowered in sufficient time for approaching trains running at a much higher line speed than the WSR. By contract the speed limit at the approach to Seaward Way is only 10MPH IIRC, and the barriers are triggered automatically by the approaching train, so the down time is kept to a minimum.
     
  4. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Дата регистрации:
    12 сен 2005
    Сообщения:
    10.146
    Симпатии:
    9.777
    Пол:
    Мужской
    Адрес:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    it does create the question given all that has happened this year whether the Directors and management actually want to run trains or are happy to find excuses not to do so ?
     
    staffordian нравится это.
  5. Snifter

    Snifter Well-Known Member

    Дата регистрации:
    26 авг 2014
    Сообщения:
    1.692
    Симпатии:
    4.298
    Пол:
    Мужской
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There's only one type of crossing that puts money through the till and that's a working one. Whether the signalling system is lights or semaphore, it will not make any difference to the revenue figures.
     
    The Dainton Banker, johnofwessex, Paul42 и 7 другим нравится это.
  6. Monkey Magic

    Monkey Magic Part of the furniture

    Дата регистрации:
    6 янв 2018
    Сообщения:
    3.498
    Симпатии:
    6.845
    Адрес:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Who at the WSR is in charge of the Seaward Way crossing project?
     
  7. billbedford

    billbedford Member Friend

    Дата регистрации:
    25 фев 2015
    Сообщения:
    302
    Симпатии:
    336
    Пол:
    Мужской
    Род занятий:
    retired
    Адрес:
    bedford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    quite clearly nobody !
     
    MellishR нравится это.
  8. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Дата регистрации:
    30 май 2009
    Сообщения:
    22.591
    Симпатии:
    22.721
    Адрес:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As this discussion develops it is starting to appear to be one of the best examples of how not to manage anything critical to the railway and the fact that the document posted by @jma1009 is dated two years ago defies belief.
     
    The Dainton Banker и Fish Plate нравится это.
  9. Monkey Magic

    Monkey Magic Part of the furniture

    Дата регистрации:
    6 янв 2018
    Сообщения:
    3.498
    Симпатии:
    6.845
    Адрес:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It does call into question the competence and fitness of those making decisions at the WSR
     
    johnofwessex, Piggy и 35B нравится это.
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.515
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As others have already asked, given the state of many council budgets, will the funding be there to pay for the crossing, as SCC may have not carried over the funding into 2021, as it did, due to the first delay, nothing is set in stone,
    Colour lights, or semaphore , who cares? because at the moment nothing can run over the crossing, clearly the project manager, assuming he, or she wasn't amongst those removed by the board when the new chairman took over, has been not keeping abreast of things, what is plan B? Is there a plan B in the case that the crossing can not be done? even if it means terminating at BA and top and tailing, until this matter is solved,
     
  11. Sidmouth

    Sidmouth Resident of Nat Pres Staff Member Moderator

    Дата регистрации:
    12 сен 2005
    Сообщения:
    10.146
    Симпатии:
    9.777
    Пол:
    Мужской
    Адрес:
    Alderan !
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    now of course a fleet of buses running from BA to Minehead to carry passengers back and forth is one option which in time could negate the need for a station at minehead .......
     
  12. echap

    echap New Member

    Дата регистрации:
    23 сен 2009
    Сообщения:
    178
    Симпатии:
    424
    Пол:
    Мужской
    Род занятий:
    Church Volunteer
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably the buses would all have to be painted chocolate & cream to keep with the GWR theme of the line!!
     
  13. Jim O'Brien

    Jim O'Brien New Member

    Дата регистрации:
    15 июл 2014
    Сообщения:
    102
    Симпатии:
    109
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Morayshire, North of Scotland.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Does anyone know of a bus operator interested in taking over the trackbed for a guided busway route? Now that would really bring the punters in.
     
  14. FrankC

    FrankC Member

    Дата регистрации:
    27 май 2009
    Сообщения:
    472
    Симпатии:
    2.139
    Good afternoon. The crossing was first built in 1992. Since then road and pedestrian traffic has increased considerably, particularly in the summer. After nearly thirty years the equipment is worn out. Technology has developed substantially, and the safety demands of the ORR and the Highways Authority have, rightly, increased substantially. We have a very good working relationship with Somerset County Council and we have been having fortnightly meetings with them and with our professional advisers since May. We have a significant team of professional railway specialists working on this (with the Highways Authority) and the plans are being fine tuned before submission to the ORR, with whom we are also in touch. Signalling will almost certainly be like for like, with the addition of one semaphore signal. We will issue further information in due course, but I am not entering into a detailed dialogue here. If anyone has a detailed question, and a good reason for needing to know then send me a PM.
     
    6960 Raveningham Hall, baldbazza и malcolm imps нравится это.
  15. Ploughman

    Ploughman Part of the furniture

    Дата регистрации:
    1 апр 2008
    Сообщения:
    5.969
    Симпатии:
    2.761
    Род занятий:
    Ex a lot of things.
    Адрес:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the Council document it mentions that the work is included in the 2017 - 2018 budget at £850K.
    Just wondering how much this figure has gone up in the intervening period of indecision?
    And how much more will it increase by before work is actually completed?
     
    Hampshire Unit нравится это.
  16. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.515
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well the GWR did at one time operate its own buses linking outlying villages with the stations. as regards a guided bus way, how much was the last such scheme over budget by? only the big boys, first group for example could afford it, and why when there would be no advantage to them.
     
    ross нравится это.
  17. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.848
    The reason why the crossing needs to be renewed was explained by the document from two years ago. While it is slightly reassuring to know that discussions are proceeding, it remains unexplained why the work was not completed before Spring this year. One or other party's second thoughts about the detailed design would have been irrelevant if the job had been carried out sooner.
     
    The Dainton Banker и 35B нравится это.
  18. MellishR

    MellishR Resident of Nat Pres Friend

    Дата регистрации:
    16 апр 2009
    Сообщения:
    8.912
    Симпатии:
    5.848
    Oh I don't know. The people who have been agitating for a through service to Taunton might like the idea of a 60 mph guided busway.
    Edit: Or make the present road one-way, with the railway trackbed for the other direction.
    (My turn to get my coat.)
     
    32110 нравится это.
  19. martin1656

    martin1656 Nat Pres stalwart Friend

    Дата регистрации:
    8 дек 2014
    Сообщения:
    19.263
    Симпатии:
    12.515
    Пол:
    Мужской
    Адрес:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As could a new station, on the other side of the crossing, doing away with the need for a crossing, .
     
  20. bluetrain

    bluetrain Well-Known Member

    Дата регистрации:
    3 мар 2019
    Сообщения:
    1.561
    Симпатии:
    1.584
    Пол:
    Мужской
    Адрес:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I am sure that the WSR has a number of contingency plans to continue limited operations in the event of a section of the line being blocked, in this case the Minehead level crossing (assuming that use of flag-men is unacceptable for routine operation).

    The obvious options are for trains from BL to turn back at Blue Anchor, Watchet or Williton. I was interested, however, to see your comment that the ORR will currently only agree BL to Williton on a "one engine in steam" basis. Has the reason for this limitation been given? Is it expected to last into 2021?

    With only 4 months remaining until the target date of March 2021 for completion of the level crossing work, there must be concern that the target will slip.
     
    35B нравится это.