If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bluebell Railway General Discussion

Discuție în 'Heritage Railways & Centres in the UK' creată de Jamessquared, 16 Feb 2013.

  1. torgormaig

    torgormaig Part of the furniture Friend

    Înscris:
    17 Iul 2007
    Mesaje:
    4.906
    Aprecieri primite:
    7.651
    Thanks, Steve - I stand corrected. Although I had never thought about it before, now you mention it I can see the difference.

    Peter
     
  2. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.911
    Aprecieri primite:
    5.847
    I have different questions about the move.

    Why does a tamper need two 20s to pull it?

    And why, at the end of the video, did the locos go onto the running-round loop?
     
    6960 Raveningham Hall apreciază asta.
  3. Matt37401

    Matt37401 Nat Pres stalwart

    Înscris:
    8 Iun 2014
    Mesaje:
    15.551
    Aprecieri primite:
    11.955
    Locație:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Class 20’s sometimes run nose to nose because the visibility for the crew’s better when running cab first. Also when they’re in multiple a pair of them have a similar power output to a type 3.
     
  4. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Înscris:
    9 Oct 2019
    Mesaje:
    1.401
    Aprecieri primite:
    1.772
    Sex:
    Masculin
    Ocupație:
    Retired
    Locație:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A 20 on its own was a rarity (excepting working T n'T).
    I remember pairs twittering through Derby with coke trains from Avenue (ex-LNER type hoppers with wooden slats raising the sides).
    Pat
     
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I don't know, I wasn't there. My gut feeling is that it might have been to release the incoming tamper to head south under its own power rather than using them to trip it all the way down to HK behind the class 20s. But that is supposition on my part.

    Tom
     
  6. City of truro fan

    City of truro fan Member

    Înscris:
    29 Noi 2015
    Mesaje:
    795
    Aprecieri primite:
    90
    Sex:
    Feminin
    Locație:
    Honiton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    why did it get toad all the way to the railway if it can go on its own power. I have seen a tamper go by at Taunton on its own so this is possible. There was a man driving it normally
     
  7. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    booked speed I'd guess. One went past us, and I looked it up - Woking to Pboro at 45mph, on a rigid 4 wheel chassis with the cab well forward of the front axle...
    seasickness pills at the ready...
    Or it could be mileage - wearing out a tamper is probably more expensive than wearing out a couple of 20s.
     
  8. Bertie Lissie

    Bertie Lissie New Member

    Înscris:
    10 Dec 2012
    Mesaje:
    58
    Aprecieri primite:
    138
    Heritage Railway Volunteer:
    No I do not currently volunteer
    They could have towed it behind Kilmersdon?
     
  9. Matt35027

    Matt35027 Well-Known Member

    Înscris:
    16 Oct 2009
    Mesaje:
    1.122
    Aprecieri primite:
    143
    Sex:
    Masculin
    Ocupație:
    Builder
    Locație:
    Near 74D
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think they're brand new tampers of a type not yet fully approved/accepted/signed off, whatever process they're going through, so can't work under their own power on the mainline yet.
     
    Nick C, brmp201 și Jamessquared apreciază asta.
  10. grid56126

    grid56126 New Member

    Înscris:
    30 Oct 2010
    Mesaje:
    13
    Aprecieri primite:
    10
    Thats is correct and they are also incredibly tight to guage. The restrictions on their movement have led to at least one move being cancelled as no suitable route was open. Add to this onging issues with loco weight / RA restrictions on the Oxted and you get a pair of class 20s to add to the fun as they are still allowed. And of course that meantthere were towo locos to top and tail the machine as they reversed at Croydon. Its also had to run under single line working for part of the route as the mchine is (Currently) out of gauge on the Up line. Unless things have changed recently there was no Northbound route yet approved to get the machine anywhere North of Croydon, hence it ran back via Redhill and Tonbridge.
     
    Nick C, Matt37401 și Jamessquared apreciază asta.
  11. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There will be a new issue of The Bluebell Times next Friday but something just piqued my interest in editing: the recent track relaying north of Horsted Keynes means that the entire section of track that comprised the first section of the Northern Extension, ca. 1990, has now been relayed ...

    Tom
     
    S.A.C. Martin, A1X 32670, jnc și alți 2 apreciază asta.
  12. BrightonBaltic

    BrightonBaltic Member

    Înscris:
    26 Mai 2011
    Mesaje:
    724
    Aprecieri primite:
    242
    Relayed to where, and by whom? Surely you mean re-laid? ;)
     
  13. BrightonBaltic

    BrightonBaltic Member

    Înscris:
    26 Mai 2011
    Mesaje:
    724
    Aprecieri primite:
    242
    Incidentally, it has been quite a few years since I last read the latest long-term development plan - I understand that priorities may well have changed, especially with the pandemic - but I do remember that a new station at West Hoathly and commencement of the long-discussed Ardingly extension were both on the cards for some time in the 2020s... are either of these still a definite aspiration?
     
    jnc apreciază asta.
  14. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The long term plan was last revised in 2013. I think it should have had another revision since, but well, you know, things ...

    In the current version though, with re-opening a station at West Hoathly and extending to Ardingly still feature. There was some bridge repair done on the Ardingly branch last year if my memory serves me right.

    Tom
     
    jnc, BrightonBaltic și S.A.C. Martin apreciază asta.
  15. BrightonBaltic

    BrightonBaltic Member

    Înscris:
    26 Mai 2011
    Mesaje:
    724
    Aprecieri primite:
    242
    Duly noted. Obviously, with the Ardingly project, the big job initially (unless work started at the existing Ardingly railhead and pushed east!) would be reinstating Sheriff Mill viaduct. Am I correct in thinking that you have a couple of redundant secondhand bridge spans in store for this purpose?

    If Ardingly does eventually go ahead, have you any idea when work would likely commence in earnest?

    I do recall hearing some scuttlebutt at a Bluebell gala of a reluctance on the part of Bluebell management to obtain a second main-line connection, as it was alleged that this would then lead to the entire EGR-Ardingly section being taken over by Network Rail as a diversionary main line... how accurate that was/is/may be, I cannot comment.
     
  16. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    that sounds unlikely (although never say never), as you can bus replacement passengers, why now would you bother getting the route knowledge kept up to date?

    It's (thread drift alert) an interesting question though. NR/preserved railway relationships seem to be on the whole quite good (if a touch patronising). I wonder what happens when there is a conflict of interest over resources vested in the preserved line?
     
    BrightonBaltic apreciază asta.
  17. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    Înscris:
    14 Sep 2009
    Mesaje:
    1.180
    Aprecieri primite:
    1.812
    Sex:
    Masculin
    Locație:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Presumably if that was a genuine risk then the Bluebell could get round that by not actually instating a physical mainline connection at Ardingly, rather like the IoW currently has at Smallbrook. Join by platforms but no rail connection. Just because a railway runs into a station next to the national network doesn't mean a physical connection of rails has to be installed
     
    Paulthehitch și jnc apreciază asta.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.454
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Wouldn’t even be “join by platforms” as Ardingly no longer has a Network Rail station.

    Tom
     
  19. BrightonBaltic

    BrightonBaltic Member

    Înscris:
    26 Mai 2011
    Mesaje:
    724
    Aprecieri primite:
    242
    Indeed not, but I wondered whether EGR residents might not start campaigning for commuter services to Brighton via Ardingly...
     
  20. Bikermike

    Bikermike Well-Known Member

    Înscris:
    11 Mar 2020
    Mesaje:
    1.814
    Aprecieri primite:
    2.045
    Sex:
    Masculin
    Locație:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    keep them off by laying to 4'8 1/2" not 1435mm...
     
    Hirn, Nick C și Dunfanaghy Road apreciază asta.

Distribuie pagina asta