Llangollen Railway

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем 14xx Lover, 4 янв 2010.

  1. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed.


    Someone mentioned things 'growing organically', & that's where the risk is.
    They've got to a situation where Engineering has ~30 employees, that's a sizable operation.
    It was 20 in 2014, when there was also an operating loss. 20 in 2010, when there was a loss.
    The 2018 accounts state that engineering turnover was significantly down, yet staff numbers had gone up to 31.


    The figures for Engineering aren't split out, so difficult to tell if it was ever a viable business.
    I would wonder if the volunteer Directors had the capacity & skills to operate two quite different businesses.
     
    ross, Bluenosejohn, osprey и 3 другим нравится это.
  2. huochemi

    huochemi Part of the furniture

    Дата регистрации:
    6 май 2008
    Сообщения:
    2.995
    Симпатии:
    1.515
    Пол:
    Мужской
    Адрес:
    UK
    Heritage Railway Volunteer:
    No I do not currently volunteer
    While that is a fair comment in isolation, it appears from the company's announcement that over £250,000 of liabilities are claims against the engineering business, which one might reasonably interpret to be claims which have not been settled and are unfunded by the bank or anyone else. Which really goes to the point of separate incorporation, to protect the main operating company from major shocks. Now there may have been good reasons for not putting it in a separate entity but prima facie it would have provided some shelter to the PLC.
     
    The Dainton Banker и jnc нравится это.
  3. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.494
    Симпатии:
    2.853
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Absolutely...
     
    GWRArry нравится это.
  4. simon

    simon Resident of Nat Pres

    Дата регистрации:
    26 июн 2006
    Сообщения:
    11.872
    Симпатии:
    5.555
    True, but then someone has to control the new entity and it has to be funded. All structures have their advantages and disadvantages. And what existed at the Llangollen cannot be retrospectively changed.

    What would be useful to know (although I have no right to know as I'm not a share holder or member) is who owns/owed what.
     
    Miff и osprey нравится это.
  5. Pmorgan_cym

    Pmorgan_cym Member

    Дата регистрации:
    8 авг 2006
    Сообщения:
    268
    Симпатии:
    3
    So is this just a tactical winding up, they can't pay the settlement fees so they have no option but to wind the plc up? Not an uncommon thing to do but does leave a nasty taste in the mouth for those who lose out.
    No PI to cover the engineering business against these sort of claims?
     
    ross нравится это.
  6. osprey

    osprey Resident of Nat Pres

    Дата регистрации:
    3 окт 2007
    Сообщения:
    10.494
    Симпатии:
    2.853
    Род занятий:
    semi-retired, currently doing R&D for my patents
    Адрес:
    Halifax
    Oh dear this is sad reading. I repeat, I hope and believe something can arise from this sad situation ..the potential is there. Hopefully some group with vision realise this with sound business grounds...remember it's a business not a railway.
     
  7. DavidH

    DavidH New Member

    Дата регистрации:
    23 мар 2016
    Сообщения:
    86
    Симпатии:
    107
    Адрес:
    The Marches
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It can't be both tactical and because they have no option.
     
    jnc нравится это.
  8. Great Western

    Great Western Member

    Дата регистрации:
    22 ноя 2009
    Сообщения:
    327
    Симпатии:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You have to worry the engineering side troubles will ripple across to the actual railway side of things in that donations and public confidence in pledging donations will dry up causing the slow death.

    We’ve already seen warnings of be careful where any donations are actually going etc, can we be 100% sure donations won’t go directly to paying the debts incurred and not support the railway? Is if just safer from a confidence point of view to simply not donate at all until it’s all sorted out, one way or the other.

    This doesn’t happen overnight, each nail in the coffin has been hammered home over several years, if the railway closes and the track ripped up then the management who’s job it is to ensure the ongoing ability of all aspects of the railway to operate in the green have failed so it’s only them who are to blame.

    I really can’t see 2021 ending without a Big name going out of business unfortunately, the WSR appear to have dodged that bullet - but will the LR?
     
  9. flying scotsman123

    flying scotsman123 Resident of Nat Pres

    Дата регистрации:
    9 сен 2013
    Сообщения:
    10.674
    Симпатии:
    18.699
    Пол:
    Мужской
    Адрес:
    Cheltenham
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, mostly from you!

    As long as you donate to the Trust, then yes, I think you can.
     
    49010 нравится это.
  10. estwdjhn

    estwdjhn Member

    Дата регистрации:
    24 янв 2013
    Сообщения:
    342
    Симпатии:
    693
    Род занятий:
    Boilermaker
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To a certain extent it can be. The total organisation (Trust, PLC, Engineering) has total liabilities which possibly exceed the total value of the assets, and certainly exceeds the value of the assets which aren't needed to keep the railway running. They probably have no option but for at least some of the organisation to go bump. However rather than lose the assets of the trust they are letting the PLC go under, losing any assets it has, and thus escaping all the liabilities - this is to a certain extent a tactical decision, the ability to do which goes back to when the PLC was created. One of the reasons a lot of railways use this structure is to shield their assets in the trust from the results of commercial failure.
     
    MellishR, ross, jnc и 3 другим нравится это.
  11. Thompson1706

    Thompson1706 Part of the furniture

    Дата регистрации:
    19 ноя 2007
    Сообщения:
    2.523
    Симпатии:
    1.886
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    A note to all of the doom-mongers out there. The track is safe and the railway should be able to operate within a couple of months. The L.R.O. and T.W.A.O. held by the Trust allows the railway to operate Any donations to the Trust will be gratefully received, as will any new volunteers.

    Bob.
     
    mdewell, GWR4707, ghost и 17 другим нравится это.
  12. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A quick look suggests that monies going to the Trust should be okay. They don't appear to be a guarantor of the plc.
    (however, as at the end of 2019 they did owe the plc money, if that is still the case the receivers may choose to collect it)
     
  13. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Yep, it is the Trust that owns the trackbed etc;
    https://find-and-update.company-inf.../03040336/charges/AjSdcu_5yGA6qfD-h3u4rhTGiTg
     
  14. Great Western

    Great Western Member

    Дата регистрации:
    22 ноя 2009
    Сообщения:
    327
    Симпатии:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    From a number of forums, ive asked the question once prior to this message.

    How do we know the trust isn’t going to be dragged into this mess, or is in trouble as well?
     
  15. Great Western

    Great Western Member

    Дата регистрации:
    22 ноя 2009
    Сообщения:
    327
    Симпатии:
    174
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Doom mongers or realists, “should be able to operate” ?

    I think potential donators have a right to be worried in the light of other railways who have been on the edge or have rather loose understanding of how to run a happy and financially sound business, note business not private train set.
     
  16. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer

    It is the plc's bank that have called in the receivers.
    NOT the plc or the Trust.

    Tactical would be the plc calling in administrators
     
    GWR4707 и Sheff нравится это.
  17. Monkey Magic

    Monkey Magic Part of the furniture

    Дата регистрации:
    6 янв 2018
    Сообщения:
    3.498
    Симпатии:
    6.845
    Адрес:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wasn't one of the directors the GM so surely someone who should have had their eye on the ball about what was going on day in day out on the line?
     
  18. Pmorgan_cym

    Pmorgan_cym Member

    Дата регистрации:
    8 авг 2006
    Сообщения:
    268
    Симпатии:
    3
    It was reported as the PLC asking the bank to call in the receivers.
     
    jnc нравится это.
  19. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
  20. RichardBrum

    RichardBrum Member

    Дата регистрации:
    16 апр 2019
    Сообщения:
    262
    Симпатии:
    335
    Пол:
    Мужской
    Адрес:
    Birmingham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's a phrase they are told to use by the bank, so as to make it appear it isn't the bank taking the action.

    "Usually the bank (bizarrely) requires the directors to "request the bank to appoint a receiver". This is face-saving, and designed to deflect criticism from the bank to the directors."