If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Draughting arrangements for Bulleid Pacifics including the Giesl ejector

الموضوع في 'Steam Traction' بواسطة jamesd, بتاريخ ‏14 اكتوبر 2014.

  1. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why?

    If there is a known issue that can be improved why would you not take steps to improve it? Especially if it improves performance, efficiency and maintenance? Most locos changed and evolved during their own first working lifetimes to adjust to needs and demands of the day, so it is just a continuation of previous practice.

    I can't help but think that Bulleid would be spinning in his grave at the thought of people not embracing innovative ideas to improve performance.
     
    fergusmacg, andrewshimmin و 35B معجبون بهذا.
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,818
    عدد المعجبين:
    12,016
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In which case it would be nonsense to ‘unrebuild’ 35011 because its rebuild was to improve performance efficiency and maintenance.
     
    240P15, jnc و Richard Roper معجبون بهذا.
  3. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I get your argument, but effectively curing the drifting exhaust problems common to so many large boilered locos could properly called a safety issue. Doing so with no negative impact on performance is merely a bonus.

    Was that at all convincing? :Angelic:
     
    srapley و andrewshimmin معجبون بهذا.
  4. Monkey Magic

    Monkey Magic Part of the furniture

    إنضم إلينا في:
    ‏6 يناير 2018
    المشاركات:
    3,498
    عدد المعجبين:
    6,845
    مكان الإقامة:
    Here, there, everywhere
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No it isn't. Your argument makes no sense. There is a marked difference between a relatively small change ie drafting improvements and the Jarvis rebuild. Returning it to its pre Jarvis rebuild form does not mean fossilizing it.

    If they were rebuilding it with a completely different valve gear, boiler, firebox, cylinders then I could understand your point but they aren't.

    It is entirely logical to attempt to evolve the prerebuild design.

    Unless you take it back to its as built form it will always be rebuilt and modified.

    Where is the line 7th May 59? March 56? Feb 55? Jan 54? Dec 44?
     
    Last edited: ‏2 إبريل 2021
    srapley, andrewshimmin و 35B معجبون بهذا.
  5. class8mikado

    class8mikado Part of the furniture

    إنضم إلينا في:
    ‏1 جوان 2009
    المشاركات:
    3,857
    عدد المعجبين:
    1,655
    الوظيفة:
    Print Estimator/ Repository of Useless Informatio.
    مكان الإقامة:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I note with interest the Schools on the NYMR is having its Lemaitre put back on, hopefully they are n,t daft enough just to put the 'SR' version on...
     
  6. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,963
    عدد المعجبين:
    7,749
    Gotcha!:)

    Peter
     
    class8mikado, Jamessquared و Steve معجبون بهذا.
  7. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,818
    عدد المعجبين:
    12,016
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No, just the plywood version.
     
    أعجب بهذه المشاركة class8mikado
  8. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    29,204
    عدد المعجبين:
    29,644
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Agree completely. If we’re in the realms of “might have been”, then we can reasonably assume that tweaks to the unrebuilt Light Pacifics would have been made to their larger cousins had any been left in original form. But, for this project, the constraint should be to consider what BR might have done 60 years ago, not what a modern engineer might now do given an unrebuilt MN.

    * NB - I’m deliberately using “unrebuilt” to avoid getting drawn into the devilish detail of what constitutes “original” given the in service modifications made to the class.


    Sent from my iPad using Tapatalk
     
  9. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,084
    عدد المعجبين:
    3,148
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Steve, sorry to drag the discussion back to this this post, (and further apologises if this has already been addressed, but if so I couldn't spot it reading through the thread), but I don't understand why you would model a Lempor that wasn't designed to the known optimal parameters? Anything else isn't a Lempor is it? Why does it need to have the same outer diameter (of the chimney?) I'm sure there must have been a sound reason?
     
  10. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What I don't get in this discussion is why concentrate on the draughting? Of all the criticisms you could lay at the door of a Bulleid pacific, surely the one thing that was never in doubt was their ability to produce steam when needed?

    Tom
     
    240P15, 69530, torgormaig و 4 آخرون معجبون بهذا.
  11. JJG Koopmans

    JJG Koopmans Member

    إنضم إلينا في:
    ‏12 نوفمبر 2014
    المشاركات:
    382
    عدد المعجبين:
    474
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, and it does not matter what it does cost???
    Kind regards
    Jos
     
  12. Allegheny

    Allegheny Member

    إنضم إلينا في:
    ‏8 ماي 2015
    المشاركات:
    637
    عدد المعجبين:
    311
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I would recommend re-reading this thread, starting from about page 2.
     
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The answer I would give is that any project has only a limited amount of engineering capacity, so it is important to consider where you expend that capacity. In the context of 35011, the loco requires a new inside cylinder to be designed and fitted (no small task - has anyone in preservation ever replaced the inside cylinder of a Bulleid pacific yet?); a new crank axle to be designed and manufactured; new valve gear and reverser, plus myriad small components. No doubt drawings exist for some of those components, but that is still a huge amount of engineering, design and project management work to be done, not to mention what is likely a seven figure sum to pay for it all. All of those things are on the critical path to success - no middle cylinder, no loco. By contrast, worrying about the draughting of a type of loco that was a prodigious steam raiser feels like displacement activity to me - it might be intellectually satisfying, but it won't be the making of the project. It might break it if it results in too much diversion of limited engineering capacity from items that are absolutely essential.

    Tom
     
    35B, jnc و 240P15 معجبون بهذا.
  14. JJG Koopmans

    JJG Koopmans Member

    إنضم إلينا في:
    ‏12 نوفمبر 2014
    المشاركات:
    382
    عدد المعجبين:
    474
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All that effort to produce an expensive scarce coal devourer?
    Kind regards
    Jos
     
    أعجب بهذه المشاركة Monkey Magic
  15. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    One might also add to Tom's answer that it would be as well to consider improvements for the various serious design and engineering flaws that caused the rebuilds to be necessary before expending serious effort on an aspect of the design that was merely sub-optimal.

    That being said, though, volunteer resource is rarely a zero sum game. If there is volunteer resource willing to look at the draughting that would not be able to assist with more important items on the critical path then why not?
     
    Monkey Magic و Sheff معجبون بهذا.
  16. Allegheny

    Allegheny Member

    إنضم إلينا في:
    ‏8 ماي 2015
    المشاركات:
    637
    عدد المعجبين:
    311
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    No one would doubt that the Merchant Navy couldn't produce the required quantity of steam. The whole point is that the blastpipe back pressure was considerably higher than it needed to be.

    Correcting this would reduce coal and water consumption and/or generate additional revenue by pulling more coaches.
     
    Monkey Magic و Sheff معجبون بهذا.
  17. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    إنضم إلينا في:
    ‏30 ماي 2009
    المشاركات:
    22,738
    عدد المعجبين:
    22,894
    مكان الإقامة:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Well said. This is all good discussion but rather pointless unless you are interested primarily in a better view from the footplate that you definitely get with a rebuilt. I will rely on hard evidence from experienced railway men and in that context I would prefer the words of legendary Nine Elms Top Link driver Bert Hooker. He is on record as saying:

    A Merchant Navy’s power outputs were only limited by the fireman’s capacity for work and this was later borne out with the satisfactory trials at Rugby. I don’t think they reached the limit of the boiler there, only the ‘front end’ to use the steam so quickly generated. There is no doubt in my mind that if the best engines from the other regions were put on test against a Merchant Navy, all with clean boilers and steaming freely, but with the tenders loaded up with very inferior coal, the Merchant Navy would still be going long after the others had stalled through lack of steam. A tribute to a really good boiler.

    Nothing more need be said, arguably.
     
    Johnb, 240P15, torgormaig و 1 شخص آخر معجبون بهذا.
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    But by how much over a complete duty cycle?

    Take a typical mainline trip - a day or so gradually bringing the loco into steam; then an FTR, then a pathing move that will likely have a flyweight load of just a single support vehicle; then the day itself - perhaps a few hours each way with a break in the middle - then another pathing move with the support vehicle, then a controlled cool down. For the vast majority of that cycle, the loco is working at zero or very low output. I get the sense that lots of the supposed benefits of improved draughting are based around assuming a BR-era duty cycle with high availability. Modern conditions aren't like that - the total time spent at high output is small relative to the total period in steam.

    (More carriages by the way - is that actually feasible on today's routes? An original condition Merchant Navy would take 13 or 14 Pullmans unaided up Honiton Bank - about 7 miles of 1 in 75. That's a good 500 tons - convert that to Mark 1s / Mark 2s and you might be talking 15 or 16 carriages, but how many routes could take a train that big? Most stations aren't big enough for trains of that size. So I get the feeling "pull more carriages" is a red herring for a class 8 loco - maybe useful if you turn a class 5 from nine to ten carriages, but not much point allowing a class 8 to go from fifteen to sixteen when it is likely limited by station capacity to about twelve or thirteen anyway).

    Tom
     
    MellishR, jnc و 240P15 معجبون بهذا.
  19. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    28,028
    عدد المعجبين:
    65,609
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    They are all coal devourers though. A typical mainline charter might generate gross income of well over £50,000; and a tender of coal might cost less than £2000 of that. If you save even 10% (and I doubt you would) that's what - a £200 saving on a £50,000 trip? You'd get more bang for your buck negotiating a better deal with your vintner ...

    Tom
     
    MellishR, Romsey و 240P15 معجبون بهذا.
  20. Allegheny

    Allegheny Member

    إنضم إلينا في:
    ‏8 ماي 2015
    المشاركات:
    637
    عدد المعجبين:
    311
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's one point I hadn't thought about. Improving the draughting would also reduce the effort required by the fireman.
     
    أعجب بهذه المشاركة Sheff

مشاركة هذه الصفحة