    The improvements will mean an increase of visitors on Thursdays and Sundays.
    Ideally signage and safe parking provision will be improved. Also notices to ensure no walking on neighbours land to protect privacy.
    Hopefully will not be long till the viaduct is open for supervised walks along it (as shown on Ch5 and Yesterday TV)?
     
  2. MartinBall

    MartinBall Guest

    Not sure how you keep the local authorities on-side through submitting unnecessary planning applications that they then have to send back to you as not needed...?
     
  3. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    Wednesdays and Sundays :)

    Do not forget that the viaduct is still owned by the relevant Gov department. Whilst TV shows may well get special treatment, I doubt that the same would be extended to the Trust other than perhaps on very rare occasions, as otherwise they are more likely to insist that the Trust takes over ownership - nice in theory, but financially very unwise at the moment :-( I think you may well have to await Phase 3......
     
    ross нравится это.
  4. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    ...which is why one would ask them first "do I need PP for this or not please?" After all, I'm sure no-one in the Trust would want to spend time, effort and money in drafting a PP application if it were not needed anyway.

    At the moment tho' no one on here seems to have the answer to the basic Q of how much, if any, track-laying could take place without needing PP. Without that info, all the rest is mere speculcation.
     
    ross, The Dainton Banker и 2392 нравится это.
  5. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Which is the point I was sort of making. Contact the authorities and ask do we need to apply/re-apply. Do you have any objections to our plan etc.....
     
    ross нравится это.
  6. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    27.790
    Симпатии:
    64.454
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I suspect what is important at this juncture is the level of informal contact and relationship with elected members, rather than formal contact with officers.

    Tom
     
    ross и 2392 нравится это.
  7. oliversbest

    oliversbest Member

    Дата регистрации:
    14 июн 2011
    Сообщения:
    814
    Симпатии:
    121
    Thank you. Have never visited9from Canada) but its on"the list". Is the post box still operational??
     
  8. 2392

    2392 Well-Known Member

    Дата регистрации:
    7 июн 2010
    Сообщения:
    1.902
    Симпатии:
    1.148
    Пол:
    Мужской
    Адрес:
    Felling on Tyne
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yup Tom, keep it informal at the moment. Rather like the late Major Olver at the H.M.R.I.. He was quite happy if you came along and asked his advise/picked his brains on a particular issue. Then if needs be take things further and make them formal.
     
    weltrol нравится это.
  9. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    I would suggest that it is the officers, and not the elected members, who would make the decision as to whether or not it was necessary to seek PP. I'm sure an informal approach to them would not be a problem, after all it might well save them time further down the line (no pun intended!).
     
    Axe +1, 2392 и The Dainton Banker нравится это.
  10. DcB

    DcB Well-Known Member

    Дата регистрации:
    5 июн 2018
    Сообщения:
    1.487
    Симпатии:
    455
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for the correction on open days.
    There is political pressure on Highways England to cut support costs by demolishing structures. Hopefully they will support the viaduct maintenance till the Trust is ready to take it on.
     
  11. Meatman

    Meatman Member

    Дата регистрации:
    10 апр 2018
    Сообщения:
    696
    Симпатии:
    1.645
    Пол:
    Мужской
    Адрес:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand it, the guy who is doing all the work with the signals had planned for a matching pair, (the other is still on tressels) up and down starters to be erected and linked to the signal cabin so that visitors could work them, I believe he had more than two sets of spectacle plates, finials and metalwork made up initially and that the idea was to create a set of replica evans o'donnell signals at Chelfham,what will actually happen remains to be seen
     
    Flying Phil и ross нравится это.
  12. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.018
    Симпатии:
    6.318
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks again Meatman (and others) for your detailed and prompt replies. I, and I'm sure many others in these constrained times, appreciate being kept up to date and getting our L & B "Fix" satisfied! :Updated:
     
  13. Meiriongwril

    Meiriongwril Member

    Дата регистрации:
    3 июн 2007
    Сообщения:
    837
    Симпатии:
    704
    Пол:
    Мужской
    Адрес:
    Cymru
    Why not ask EA officials if they asked about PP for the track at Snapper? Then you mayn't even have to bother the officers...
    Also did the Trust ask about PP for the track and wagons already at Chelfham? If not, then I'd guess no need to ask if you're adding a bit more.
     
  14. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.800
    Пол:
    Мужской
    Адрес:
    West Country
    Not a bad idea, but the answer may be dependent upon what the current PP conditions are for Chelfham, so it would require NDC advice just to be sure.
     
  15. Leafent

    Leafent New Member

    Дата регистрации:
    2 окт 2017
    Сообщения:
    100
    Симпатии:
    58
    Пол:
    Мужской
    Адрес:
    The UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Now that Isaac's left, how many working engines does the L&B have? Is Axe currently a runner?
     
  16. Axe +1

    Axe +1 New Member

    Дата регистрации:
    16 сен 2017
    Сообщения:
    192
    Симпатии:
    761
    Род занятий:
    Retired {Electronics Engineer}
    Адрес:
    Surrey
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As of today, the state of the railway's steam engines is as follows.....
    • LYN (A new-build of the former L&BR Baldwin 2-4-2T No. 472, built-in 2017 by Alan Keef Ltd, Ross-on-Wye): is in working order and available for daily service;
    • AXE (Kerr, Stuart & Co Ltd No. 2451 of 1915, 0-6-0T): passed its recent 10-year boiler certification and is again available for service, but currently does have a minor problem with its motion which awaits workshop attention; and
    • CHARLES WYTOCK (Bagnall No. 2891 of 1945 4-4-0T side tank): is currently out of service undergoing a major rebuild. It is hoped that the locomotive will return to service later this year.
     
    Leafent, andrewshimmin, LesterBrown и 5 другим нравится это.
  17. Thomas Woods

    Thomas Woods New Member

    Дата регистрации:
    11 янв 2020
    Сообщения:
    89
    Симпатии:
    225
    Пол:
    Мужской
    Адрес:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Axe is undergoing routine maintenance and is hoped to be in service by start of next month to supplement Lyn on the more intensive timetable.
     
  18. Leafent

    Leafent New Member

    Дата регистрации:
    2 окт 2017
    Сообщения:
    100
    Симпатии:
    58
    Пол:
    Мужской
    Адрес:
    The UK
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Cool. It's a shame Isaac didn't stay on the L&B but it's a pretty nice fleet of steam engines.
     
    andrewshimmin нравится это.
  19. MartinBall

    MartinBall Guest

    And remember that 2 new build Manning Wardles are currently under construction...
    https://www.762club.com/
     
    Bluenosejohn, Paul42, mgp и ещё 1-му нравится это.
  20. ghost

    ghost Part of the furniture

    Дата регистрации:
    29 май 2006
    Сообщения:
    4.303
    Симпатии:
    5.727
    Пол:
    Мужской
    Адрес:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not sure I would say they are under construction just yet. As I understand it, some castings have been ordered, but there is no current machining/assembly/construction taking place. Give it a year or so and hopefully your statement will be correct!
     