If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

34039 Boscastle WC class

本贴由 Flying Phil2019-02-23 发布. 版块名称: Steam Traction

  1. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    To bring this back to the present, the team have been using optical measurement techniques to ensure that the tender chassis is accurate. This involves lots of careful work not only along each side, but also from the centreline and for each hornguide. When the dimensions are known, then the final machining of the axleboxes after remetalling the bearings can be completed.
    When the boxes were cleaned for white metalling, some small old cracks were uncovered. These have now been repaired by welding.
    telescope21.jpg
    (Pic by M Playle)
     
    已获得mgl, Richard Roper, Bluenosejohn另外2人的支持.
  2. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work on re staying the firebox has restarted now that the new long "tap" has arrived. Most of the surfaces for fittings, such as the whistle, have now been re faced. Work on the tender frame is continuing and it is hoped that the tender tank will be fitted in the Autumn.
     
    已获得Johnme101jncRichard Roper的支持.
  3. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is now an update to the Boscastle website with pictures of the latest work being done on the boiler fittings and tender axleboxes.
     
    已获得Johnme101jnc的支持.
  4. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More work has been done on the tender frame - now painted, and it looks like the spring hanging brackets are ready to be attached. There is the vacuum reservoir tanks cover being made ready for the top of the tender.
    DSC00675.JPG
     
    已获得weltrol, Richard Roper, ilvaporista另外1人的支持.
  5. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here are a couple of pictures of the current situation re the tender painting and the new chimney/blower assembly. DSC00701.JPG DSC00702.JPG
     
    已获得Johnme101Bluenosejohn的支持.
  6. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I've been checking on the Boscastle website and that pair of castings are for "petticoats" and the Boscastle one was machined last year....which these aren't, so I don't know the story for these?? But that is the fascination of walking around the back of sheds, you see all sorts of bits and bobs - there is a new smokebox for something in the other "Gap" thread picture.
     
  7. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is an update on the Boscastle website.....

    "Shed Tours

    Shed tours are starting again!


    'Boscastle' volunteers will, once more, be conducting tours of the locomotive shed at the GCR one weekend a month. Tours will take place at regular intervals throughout the day from 10:30am to 3:30pm.


    The tour gives you a chance to see restoration, overhaul and repair work in progress and hear about the place of 'Boscastle' in the story of the Great Central Railway. There is no charge for tours, but a donation on the day towards the overhaul of 'Boscastle' would be appreciated.


    Dates confirmed so far are:-


    July 24th & 25th

    August 7th & 8th

    September 4th & 5th"
     
    已获得YorkyLadHaighie的支持.
  8. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    More parts for the tender chassis were ready for assembly when I was able to visit the shed yesterday.
    Boscastle Shed Tours take place this weekend when the Beer Festival is also running at the GCR.
     
  9. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Shed tours took place but the visitor numbers were, as expected, lower than normal.
    Work is concentrating on the tender axleboxes with the insides being white metalled and machined after the weld repairs to the old cracks. It is hoped to get the tender tank put on the chassis and (then!) the wheels installed in the next few weeks.
     
    Last edited: 2021-08-02
  10. Tobbes

    Tobbes Member

    注册日期:
    2010-08-14
    帖子:
    944
    支持:
    2,642
    Fascinating - why put the tank on first? I'd never really thought about it, but presumed you'd wheel the chassis first and then put the tank on top?
     
    已获得std tank的支持.
  11. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The sheer breadth and detail of stuff one learns on here never ceases to amaze me. Bob help any non-NP opponents, should Trivial Pursuit ever decide to flog a "railways" edition! :)
     
    已获得jnc的支持.
  12. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Sorry Tobbes to have caused confusion. My sentence was clumsily reworded and the "then" should not be there, so in fact, the wheels will go under the chassis and the tender tank will be put on top, in that order.....:oops:
     
    Last edited: 2021-07-28
    已获得Tobbes的支持.
  13. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is another opportunity to see the progress on Boscastle and the other locomotives in the GCR Loughborough Shed as there are "Boscastle Shed Tours" this week end (Aug 7th, 8th). More details on the Boscastle Website.
     
  14. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work has been continuing "off-site" on re-staying the boiler. The tender frames are awaiting the axleboxes to be installed.
    The shed tours had a steady flow of participants.
     
  15. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Two views today of Boscastle - inside the frames and the new vacuum reservoirs for the tender. DSC00885.JPG DSC00884.JPG
     
    已获得Richard Roper, Johnme101, John Petley另外2人的支持.
  16. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is another opportunity to see the progress on Boscastle and the other locomotives in the GCR Loughborough Shed as there are "Boscastle Shed Tours" this week end (Sept 4th, 5th....... It is the Diesel gala event). More details on the Boscastle Website.
     
    已获得Johnme101S.A.C. Martin的支持.
  17. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Re-wheeling of the tender chassis is said to be very soon, as the axlebox machining is nearly complete. Then the tender tank will be put in place as the GCR wants to clear more space North of the shed.
    There is an update to the Boscastle website, with pictures of the latest progress.
     
    已获得jnc的支持.
  18. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been a bit more work on the various tender chassis parts, but most time has been spent on the boiler. The next Boscastle Shed Tours takes place Oct 2nd, 3rd during the Autumn Gala (31st - 3rd). There is also a new date for tours on the website for Nov 13, 14th. DSC00920.JPG
     
    已获得misspentyouth62, Tobbes, ghost另外2人的支持.
  19. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Steady progress with Boscastle as the tender now has its axleboxes repaired, re white metalled and machined. They are by the chassis and the wheelsets are just outside the shed. It is hoped that the rolling chassis will be run along the line in November, before the tender tank is put in position.
    DSC01002.JPG DSC01003.JPG
     
    已获得misspentyouth62Richard RoperJohnme101的支持.
  20. Flying Phil

    Flying Phil Part of the furniture

    注册日期:
    2018-12-10
    帖子:
    3,018
    支持:
    6,319
    性别:
    所在地:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The Boscastle AGM went well yesterday and it was a welcome change to be able to meet in person! The good news is that the tender frame should be back on its wheels very soon and the tank back on shortly after. The boiler has had a lot of work done and re - staying is proceeding. The inside motion on the locomotive chassis is due to be re-assembled early next year when the tender is finished. The end is indeed in sight for the return to steam in 2023.
    In other news, the recent updates to the website were well received and the return of the regular Boscastle Shed Tours at Loughborough is proving very popular with plenty of visitors.
    The less good news is that more money will be needed to get the locomotive finished, as the cash in the bank is running very low. However recently donations via the DCRT have increased and more BLL shares have been purchased, so the issue is being addressed.
     

分享此页面