    As far as 6697 was concerned, I think that that was the problem, it had old flues. Everything changed after the incident, the 10 year rule came in, not before time. Not sure about 7808, as it was still operating in 1979, at least. One reason I joined the GWS was after a trip to Stratford with 5900, 7808 and the Vintage Train.
     
  2. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Oh I know that, it was more the point that as there was 5 years between 5900 arriving and steaming (and it being 12 yrs after she was withdrawn by BR) one would assume a fair bit of work was needed/done before she steamed.
     
  3. RabthreeL

    RabthreeL New Member

    إنضم إلينا في:
    ‏22 ديسمبر 2021
    المشاركات:
    19
    عدد المعجبين:
    15
    الجنس:
    ذكر
    مكان الإقامة:
    Eastbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can't say, a bit before my time at Didcot. Five years is not a long time for an overhaul, it depends on resources and what else is going on at the time.
     
  4. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand it, the problem, if that is the right word, was that there was no legislation requiring a locomotive boiler to be examined. The only statutory requirement was the Factories Act and railways were specifically exempted from that Act*. This actually didn't change until the Pressure Systems and Transportable Gas containers Regulations came in in 1989. Thus, there was no problem in simply steaming your recently acquired locomotive without having any independent examination. Following the Didcot and Great Central incidents the Railway Inspectorate issued guidance on steam locomotive boilers but it remained only guidance and was not enforceable. Originally PM18, later revised and re- issued as HSG30.

    *An anomaly of this was the fact that places like Crewe Works were Factories and had to comply with the Factories Act so locos working there had to be examined under that Act but there was no legal requirement to examine the same loco working out of Crewe loco on the railway. Fortunately, the railways generally had developed their own standards for examinations and standards and effectively were self policing their boilers. It wasn't necessarily the case with smaller concerns such a the Talyllyn, though. There is one anomaly that still exists with regard to hydraulic testing. Current legislation does not stipulate what the hydraulic test pressure should be but the Factories Act required boilers to by tested to 1.5 x SWP. The current ORR guidance specifies 1.3 x SWP based on BR standards but boiler inspectors still generally require 1.5 x SWP for industrial locos originally built to comply with the Factories Act and ex BR locos to 1.3 x SWP. I've just hydraulicked a 140 psi boiler to the 210 psi required by the boiler inspector and not the 185 psi required by HSE guidance.
     
    2392 و acorb معجبون بهذا.
  5. RabthreeL

    RabthreeL New Member

    إنضم إلينا في:
    ‏22 ديسمبر 2021
    المشاركات:
    19
    عدد المعجبين:
    15
    الجنس:
    ذكر
    مكان الإقامة:
    Eastbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As I remember it, the 10-year rule was adopted well before 1989 and was probably enforced by the insurance companies. When I was at Bold Colliery in 1980, we were amazed to find that a few of the NRM locomotives in steam still had the same tubes as when withdrawn from BR service! Of course they were government owned and did not need insurance. I am sure that some sample tubes had been removed for examination.
     
  6. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I must confess that I had never heard about the Great central incident albeit a quick google throws this up, https://www.railwaysarchive.co.uk/docsummary.php?docID=930 the Didcot incident seems to be barely mentioned anywhere, not even ever seen an indication of the year it happened?
     
    أعجب بهذه المشاركة 35B
  7. goldfish

    goldfish Nat Pres stalwart

    إنضم إلينا في:
    ‏13 يناير 2009
    المشاركات:
    16,157
    عدد المعجبين:
    14,426
    Am I reading the report of that incident correctly, that the Perm Sec of the Department of Environment was crawling around in the firebox and wrote the report himself…? That's an episode of Yes Minister they didn't show…

    Simon
     
  8. pmh_74

    pmh_74 Part of the furniture

    إنضم إلينا في:
    ‏28 يناير 2009
    المشاركات:
    2,423
    عدد المعجبين:
    1,707
    One of the footplate staff involved with the GCR incident is, I believe, still involved, though at the GCRN these days and as far as I know not on the footplate.

    It was a nasty incident by all accounts but it didn’t stop them repairing 377 and steaming it again (before it eventually left the line).


    Sent from my iPhone using Tapatalk
     
  9. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The '10 year rule' came in with the publication of PM18 and was based largely on what BR did and what the Factories Act Steam Boiler Regulations said, although there was no requirement to remove tubes or even lift boilers under the latter, only to remove cladding. PM18 was only ever guidance, though. The current Pressure Systems Regulations require a written scheme and this should have all the necessary requirements for examinations in it. Ten years is a norm but it is the owners written scheme and, provided the competent person (boiler inspector) agrees it can be a different period.
     
    2392, misspentyouth62, GWR4707 و 4 آخرون معجبون بهذا.
  10. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,717
    عدد المعجبين:
    2,221
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Would it be fair to suggest therefore that the boiler on 6697 hasn't been lifted since BR days?

    Other than some more obvious museum pieces (Winston Churchill, City of Birmingham, Glen Douglas etc), how many other locomotives that have steamed post 1968 if any, would there be in this situation?
     
  11. Selsig

    Selsig Member

    إنضم إلينا في:
    ‏6 ماي 2007
    المشاركات:
    980
    عدد المعجبين:
    443
    مكان الإقامة:
    Coventry, United Kingdom, United Kingdom
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Would Mallard be another - I don't think it got much more than a retube in 1986, and I don't think the boiler was lifted for that.

    John
     
    أعجب بهذه المشاركة misspentyouth62
  12. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In both cases what would be the position re asbestos, if there beneath the cladding could it all be removed without a boiler lift?
     
  13. Selsig

    Selsig Member

    إنضم إلينا في:
    ‏6 ماي 2007
    المشاركات:
    980
    عدد المعجبين:
    443
    مكان الإقامة:
    Coventry, United Kingdom, United Kingdom
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Pictures from 1985 show Mallard steaming with no boiler cladding at all, so I'd imagine any asbestos was removed during, or even before, the overhaul in the 80s. I can't imagine that having got the loco working they then lifted the boiler to clad it, so it must be possible to access sufficiently with it in situ.

    John
     
  14. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,863
    عدد المعجبين:
    9,260
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Most of the NRM stuff that steamed for Shildon and Rainhill seemed to have had very little done to them. 790, No. 1, 673, 925 before it's overhaul at MHR.

    Other countries aren't as rigorous with their regulations. Look at the amount of Swedish locos that get steamed once or twice a year for various celebrations. Obviously they have a different inspection regime to what we have. Then again, when they dragged a couple of B class 4-6-0s out of the strategic reserve after 40 years, they had planned to use one of them to get the other back to the museum! Only because the safety valves failed to lift was the move diesel hauled.
     
    Bluenosejohn و misspentyouth62 معجبون بهذا.
  15. RabthreeL

    RabthreeL New Member

    إنضم إلينا في:
    ‏22 ديسمبر 2021
    المشاركات:
    19
    عدد المعجبين:
    15
    الجنس:
    ذكر
    مكان الإقامة:
    Eastbourne
    Heritage Railway Volunteer:
    No I do not currently volunteer
    925 for sure had it's original tubes at Rainhill. Locomotives with wide fireboxes don't necessarily have to have their boilers lifted.
     
  16. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    4,906
    عدد المعجبين:
    7,651
    I believe in the US the rule is 1472 steaming days or 15 years, whichever is reached first. In other words unless your loco is steamed about 100 days a year you can go 15 years between boiler overhauls.

    Peter
     
    أعجب بهذه المشاركة ross
  17. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I've seen images of US loco boiler barrels being tested for thickness, with results chalked on in a grid pattern. Any idea if that is routine, or merely something for recertification of boilers which haven't held steam for bob knows how long?
     
  18. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s often done in the UK at the 10 year overhaul, as well. Probably elsewhere, too.
     
    2392, Copper-capped, torgormaig و 1 شخص آخر معجبون بهذا.
  19. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,538
    عدد المعجبين:
    18,384
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s all very well saying we want this or that loco overhauled but the GWS is a working museum and will have suffered the same financial setbacks as other museums die to Covid. The paying public want to see engines in steam, they generally don’t care which.
    It is clear that to do that the Society will pick those that can be turned round most economically. We don’t know the mechanical condition of 5900, 6106, 6697 or 7808. Major boiler work will swallow up large amounts of cash. I suppose that the GWS could be criticised for concentrating too much on the new builds but it’s a business decision where to allocate scarce resources both financial and manpower.
     
    أعجب بهذه المشاركة green five
  20. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    It's also a decision for the scarce resources as to whether they are allocated don't forget. The care and feeding of volunteers is one of the top priorities for any organisation that uses them, and if they aren't involved in something that excites them they may not appear at all.
     