If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

West Somerset Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة gwr4090, بتاريخ ‏15 نوفمبر 2007.

  1. Robin Moira White

    Robin Moira White Resident of Nat Pres

    إنضم إلينا في:
    ‏27 إبريل 2014
    المشاركات:
    11,404
    عدد المعجبين:
    18,231
    الجنس:
    أنثي
    الوظيفة:
    Barrister
    مكان الإقامة:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Best not to talk nonsense, then.
     
    green five, YorkyLad, Chufferpuff و 7 آخرون معجبون بهذا.
  2. Robin Moira White

    Robin Moira White Resident of Nat Pres

    إنضم إلينا في:
    ‏27 إبريل 2014
    المشاركات:
    11,404
    عدد المعجبين:
    18,231
    الجنس:
    أنثي
    الوظيفة:
    Barrister
    مكان الإقامة:
    Stogumber
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We will get to that.
     
  3. D7076

    D7076 Well-Known Member

    إنضم إلينا في:
    ‏21 ديسمبر 2007
    المشاركات:
    1,538
    عدد المعجبين:
    691
    What rubbish .
    Replacement of bridge costs £400k and month of line closure .Do you replace in February when line has 5 days of half term traffic or the month of December and cancel all santa trains which net you 25% of annual income ?
    I know which any well run line would choose .
     
    Great Western, green five, Bluenosejohn و 3 آخرون معجبون بهذا.
  4. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    Straw man? Or deliberately misunderstanding? Of course it matters whether you replace a bridge when the line is closed anyway or when you would otherwise be operating, but it makes minimal difference to the need for a large amount of money.
     
    أعجب بهذه المشاركة JBTEvans
  5. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On the contrary, as the time taken to deal with Seaward Way has illustrated, when you do this work makes a significant difference to the company as a whole. And if that is when the line is busy, that means the cost goes up significantly because the cost of the job is not just the direct cost, but also the income foregone. I'd say @D7076 has it about right when considering what should happen and when.
     
    The Dainton Banker, green five, 61624 و 4 آخرون معجبون بهذا.
  6. Bayard

    Bayard Well-Known Member

    إنضم إلينا في:
    ‏26 إبريل 2015
    المشاركات:
    1,841
    عدد المعجبين:
    3,904
    الجنس:
    ذكر
    Heritage Railway Volunteer:
    No I do not currently volunteer
    "Rail replacement service". One of the most depressing ways you can put three words together in the English language.
     
    green five, Copper-capped و 35B معجبون بهذا.
  7. Paulthehitch

    Paulthehitch Well-Known Member

    إنضم إلينا في:
    ‏13 فبراير 2020
    المشاركات:
    1,090
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    مكان الإقامة:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can actually be quicker than the trains they replace.
     
  8. andrewtoplis

    andrewtoplis Well-Known Member

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    1,419
    عدد المعجبين:
    878
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the context of paying to go on a heritage railway though....it's pretty sub optimal!
     
    green five, Bluenosejohn, Copper-capped و 5 آخرون معجبون بهذا.
  9. Paulthehitch

    Paulthehitch Well-Known Member

    إنضم إلينا في:
    ‏13 فبراير 2020
    المشاركات:
    1,090
    عدد المعجبين:
    1,093
    الجنس:
    ذكر
    مكان الإقامة:
    Hayling Island
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Depends whether it is a leisure entertainment on offer or an aspiration to provide a public transport service. The sad truth is thar after the introduction of the heavy duty pneumatic tyre between the wars, yer av'rage branch line tended to be on life support.
     
  10. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,659
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The irony of which, in this specific context, is not lost on many.
     
    Sheff, green five, Bluenosejohn و 2 آخرون معجبون بهذا.
  11. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,912
    عدد المعجبين:
    5,847
    Yes of course, if infrastructure work prevents or restricts operation of trains for a prolonged period that loses more money. But the post that I was responding to cited replacement of a bridge occupying one month, either in or out of season. Even if that had to be done during the normal operating season, the loss of income from one month's operation would be a fraction of the direct cost of replacing the bridge. The WSR lost a whole season's income, and because of the level crossing, which I would expect to be a bit cheaper than a bridge.
     
    أعجب بهذه المشاركة 35B
  12. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :Chillout:
     
  13. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How did they lose a whole season's operations? They provided a service to Minehead last year and didn't run in 2020 but neither did some other railways, including the commercially operated Vale of Rhediol, which is similar to the WSR in having a seaside location.

    The past is the past and let's move on, 11 days until trains roll in and out of MD with passengers on board.
     
    أعجب بهذه المشاركة Snail368
  14. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You've missed the point. Yes you would do it in a closed season and not in the summer or on the pre-Christmas run up, but the cost of replacing the bridge doesn't change whenever you do it, that needed fundraising. That was the point I was making.
     
  15. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    :Yawn:

    People go on like they scrapped 53808, burnt down Washford and ran a bus from Crowcombe to Minehead, jeeze, chill out guys.

    Crossing is replaced (which was a SCC project) and trains are back to normal again.
     
  16. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Such railway has changed the ownership structure of the carriages, and now a daily rate is paid everytime each carriage is used to pay for future repairs, plus plans to build a carriage shed with pieces of the jigsaw ongoing to get that to happen.

    That's future proofin'!

    Anyway, back to the lovely WSR...
     
  17. JBTEvans

    JBTEvans Part of the furniture

    إنضم إلينا في:
    ‏14 فبراير 2008
    المشاركات:
    2,597
    عدد المعجبين:
    793
    الجنس:
    ذكر
    مكان الإقامة:
    Casnewydd, De Cymru
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ah Brains SA, nice stuff. Dark is nice too. Rev James are good ales. Not had some in a while. ;)
     
  18. Ploughman

    Ploughman Part of the furniture

    إنضم إلينا في:
    ‏1 إبريل 2008
    المشاركات:
    5,969
    عدد المعجبين:
    2,761
    الوظيفة:
    Ex a lot of things.
    مكان الإقامة:
    Near where the 3 Ridings meet
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    The other factor to consider, is how much do you want to spend doing the work?
    Spend a lot and get the "Bridge or whatever" replaced in a weekend or spend less and take longer.

    Which would cause the least damage to the Bank Account in the long run?

    As an illustration take look at the Bluebell track renewal works.
    The plant in use will cost a lot but they get the job done with the least disturbance to the normal service.
     
    أعجب بهذه المشاركة Jamessquared
  19. ross

    ross Well-Known Member

    إنضم إلينا في:
    ‏18 ماي 2017
    المشاركات:
    1,002
    عدد المعجبين:
    2,477
    الجنس:
    ذكر
    مكان الإقامة:
    Titfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good, Quick, Cheap- choose any two
     
    أعجب بهذه المشاركة Sheff
  20. Cuckoo Line

    Cuckoo Line Member

    إنضم إلينا في:
    ‏29 أوت 2020
    المشاركات:
    373
    عدد المعجبين:
    382
    الجنس:
    ذكر
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You need the plant whatever way you do it and if you need to hire it probably cheaper to say hire for 2 -3 weeks than ad hoc days. But importantly see how other railways e.g. NYMR, Bluebell etc do a lot of preparatory work to minimise the time the railway is shut down. Also remember some of those lines do high income experiences during the off season.
     

مشاركة هذه الصفحة