If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bridge that Gap: Great Central Railway News

Тема в разделе 'Heritage Railways & Centres in the UK', создана пользователем Gav106, 8 май 2010.

  1. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.044
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was told that there are signs up at the A60 bridge indicating that the worksite is being prepared. I expect that the track will be being lifted and ballast removed so that the old bridge decks can be lifted. Also the brick abutments will need repair/preparation work before the new decks go in. The actual lifts are scheduled for two dates in October.
    The fundraising for the two "Factory Flyover sections is now around £1.2M and there is the desire to get something started sooner rather than later in view of the inflation affecting costs. Could this follow on relatively quickly from the A 60 bridge work??
     
    AndyY, Hando, ilvaporista и ещё 1-му нравится это.
  2. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.044
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was driving in Loughborough today and I can confirm that there are road signs up in both directions to the A 60 bridge indicating road access to works....but there is no sign, yet, of any plant or workers on site.
     
    Andrew MI нравится это.
  3. Vulcan Works

    Vulcan Works Member

    Дата регистрации:
    12 апр 2018
    Сообщения:
    266
    Симпатии:
    746
    Пол:
    Мужской
    Адрес:
    England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Good progress being made and very sensible to place orders ‘now’, especially for materials. I work for a utility company and the price of bulk orders of concrete for example are only being honoured by suppliers for a day! Other railways should take note and order what they can if they’re fundraising for civics projects because construction materials inflation is 10-15% (depending on the product), which could quickly erode the value of any donations coming in to an appeal fund. Granted a few hundred cube of ready mix isn’t sensible to store, but you get the idea!
     
    J Rob't Harrison нравится это.
  4. Jamessquared

    Jamessquared Nat Pres stalwart

    Дата регистрации:
    8 мар 2008
    Сообщения:
    28.020
    Симпатии:
    65.585
    Адрес:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My understanding is that HS2 is sucking up construction materials at a tremendous rate and driving a shortage in the market, and hence very rapid inflation.

    Tom
     
    J Rob't Harrison нравится это.
  5. J Rob't Harrison

    J Rob't Harrison Member

    Дата регистрации:
    6 ноя 2016
    Сообщения:
    242
    Симпатии:
    371
    Пол:
    Мужской
    Адрес:
    Stafford
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not just the materials, but the elements of the materials. Some of the larger civils projects on it actually have their own dedicated new-build concrete plants. Construction materials generally have gone through the roof of late so I'm glad to hear orders are being placed and costs locked-in, rather than potentially watching the price going up quicker than the donations.
     
    Hando нравится это.
  6. Musket The Dog

    Musket The Dog Member

    Дата регистрации:
    5 янв 2022
    Сообщения:
    200
    Симпатии:
    465
    Пол:
    Мужской
    Род занятий:
    Mechanical Engineer
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    An update on the A60 bridge provided today:

     
    Flying Phil, banburysaint, Dave Williams и 5 другим нравится это.
  7. Dave Williams

    Dave Williams New Member

    Дата регистрации:
    29 мар 2021
    Сообщения:
    23
    Симпатии:
    26
    Пол:
    Мужской
    Адрес:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Please could I ask if the new bridge will be raised to ensure it will not be at risk of being hit by road traffic?
     
  8. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    However high or wide you make a bridge, Sod's Law dictates some pratt will manage to find a way to hit it.
     
    Gareth, ilvaporista, weltrol и ещё 1-му нравится это.
  9. 45045

    45045 New Member

    Дата регистрации:
    28 июл 2009
    Сообщения:
    117
    Симпатии:
    49
    Generally a replacement bridge will have a thinner deck, due to improvements in materials and design. However, it may not be enough to still need a restricted height. Then adding crash protection, as was done at Broadway, is an option.
     
    30854 нравится это.
  10. Belgarath001

    Belgarath001 New Member

    Дата регистрации:
    2 апр 2012
    Сообщения:
    152
    Симпатии:
    384
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    In the lastest issue of MainLine it mentions that there is very little room for manoeuvre in terms of either lifting the bridge or lowering the road. The design incorporates as much headroom as possible supposedly, but as @45045 mentions above, crash protection will be installed also.
     
    Dave Williams нравится это.
  11. 30854

    30854 Resident of Nat Pres

    Дата регистрации:
    8 мар 2017
    Сообщения:
    12.172
    Симпатии:
    11.496
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    We've a notoriously tight bridge, single track on a blind bend when heading west, beneath the Brighton Main Line on Mill Road (joins the A23 at the roundabout forming the junction with the A27 bypass). The number of times it's been clouted, repaired and reinforced defies counting.

    Why on earth it's not been replaced during one of any of the dozens occasions the BML has been closed for planned repairs (i.e. not the dozens of times it's suffered unscheduled closures), or due to motor insurance companies fed up with endless payouts is anyone's guess.

    I wish the GCR the very best and trust they've a top notch civil engineer to design the bridge (and it's defences) and Local Authority Highways Dept alert to the issues.
     
  12. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Looking at the mock-up, I'm assuming the new bridge deck will be double width, should doubling this section ever be on the agenda?
     
  13. Musket The Dog

    Musket The Dog Member

    Дата регистрации:
    5 янв 2022
    Сообщения:
    200
    Симпатии:
    465
    Пол:
    Мужской
    Род занятий:
    Mechanical Engineer
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think I've seen it written and sketched that the two decks are already necessary because of the proximity of the bridge to the main line link. It might have been a combination of the differences in height between the alignments needed to get the MML up to the GCR and the need to stable the trains from the mainline on the GCR off of the curve/embankment. They haven't gone to the trouble of making any of the rest of the gap double in the plans, this would be quite a small piece, just in case.
     
  14. SpudUk

    SpudUk Well-Known Member

    Дата регистрации:
    5 фев 2009
    Сообщения:
    1.736
    Симпатии:
    597
    Пол:
    Мужской
    Род занятий:
    Project Manager
    Адрес:
    Wales
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Ah that makes sense, thanks!
     
  15. mogulb

    mogulb New Member

    Дата регистрации:
    20 дек 2010
    Сообщения:
    133
    Симпатии:
    95
    The bridge will be double track, one for the cord from the MML and one for the link from Loughborough Central. A section of double track is planned north of the new bridge to allow a run round for any incoming traffic heading south.
     
    30854, SpudUk, The Dainton Banker и 2 другим нравится это.
  16. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.044
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work has started!
    There are now some container type buildings being placed in the compound by the North embankment of the MML bridge. This is for the works compound for the A 60 bridge work.
    DSC01864.JPG

    There is some new fencing and gate at the works access.
     
  17. NBDR Lock

    NBDR Lock New Member

    Дата регистрации:
    18 июн 2012
    Сообщения:
    152
    Симпатии:
    126
    Good news Phil, thanks for posting.

    Do we yet have any more idea of the problems with Bridge 307 at Bunny Lane? If this bridge is to be out of service for a long period it would preclude any thoughts of running between Ruddington and Rushcliffe Halt and also prevent the running round movements needed for the Gypsum traffic. To allow the gypsum train loco to run round without straying onto this bridge and get this traffic going again, would it be possible to relay the crossover further south or would this compromise the ability to deal with a full length train?
     
    GOEdwards нравится это.
  18. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.044
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I have seen nor heard any more information about that Bridge 307. Perhaps it can be used only at slow speed until it gets repaired? If so the Gypsum traffic could be allowed once the A60 bridge is replaced.....But that is only a supposition in the absence of any new information!
     
  19. Miff

    Miff Part of the furniture Friend

    Дата регистрации:
    17 июн 2008
    Сообщения:
    3.040
    Симпатии:
    3.116
    Is there any guarantee the Gypsum will come back? I hope it does but I assume the producer and customers will have made other transport arrangements since the bridges broke.
     
  20. Flying Phil

    Flying Phil Part of the furniture

    Дата регистрации:
    10 дек 2018
    Сообщения:
    3.044
    Симпатии:
    6.447
    Пол:
    Мужской
    Адрес:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Miff makes a good point but I'm sure that the GCR will have been working very closely with British Gypsum. I believe the supply of Gypsum is both from the ground and as a by-product from some types of power station so a variety of sources/locations.
     
    Miff нравится это.

Поделиться этой страницей