If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

'Sensible' New Builds

الموضوع في 'Steam Traction' بواسطة alexl102, بتاريخ ‏12 سبتمبر 2022.

  1. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don't know how many sofas at York or Kew remain unchecked, but given Brighton Works was going quite late (last loco built there was an 80xxx), I'm surprised (and not in a good way) that so much seems to be missing. You have to wonder whether somewhere round the back of somewhere, someone occasionally looks at some manky old office furniture and wonders (a) what's in them and (b) who the hell has the keys!
     
  2. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,057
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Sent from my iPad using Tapatalk
     
    Matt37401 و The Green Howards معجبون بهذا.
  3. Paul Grant

    Paul Grant Well-Known Member

    إنضم إلينا في:
    ‏6 اكتوبر 2010
    المشاركات:
    1,524
    عدد المعجبين:
    1,120
    مكان الإقامة:
    Fife
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I used to be all aboard the idea of the Victorian/ Edwardian 4-4-0 with some modern additions. But the more time rolls on the more I think the Standard 3 in its hatchback and estate variants is already that essentially. I probably have openly pondered the idea of what a second STD 3 tank would cost to build here too.
     
    أعجب بهذه المشاركة GOEdwards
  4. Hirn

    Hirn Member

    إنضم إلينا في:
    ‏11 أوت 2015
    المشاركات:
    512
    عدد المعجبين:
    320
    الجنس:
    ذكر
    I should have said: "no unlike button"
     
  5. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The group building 82045 have stated in the past that anyone looking for an 82046 is welcome to come and look at the hard work they’ve done.
    From memory though I recall both Standard 3 types have different spoked wheels?
    I’m not an engineer ( Although I did start off going down that route) But how do I put this? Certain Standards weren’t exactly what I’d call ‘Standard’
     
    أعجب بهذه المشاركة MellishR
  6. Paul Grant

    Paul Grant Well-Known Member

    إنضم إلينا في:
    ‏6 اكتوبر 2010
    المشاركات:
    1,524
    عدد المعجبين:
    1,120
    مكان الإقامة:
    Fife
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Definitely something odd going on there but if you're worried about things that matter the difference of a spoke won't make a jot of difference to performance.
     
  7. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yeah but if your going to do something…
     
  8. Gav106

    Gav106 Well-Known Member

    إنضم إلينا في:
    ‏29 مارس 2010
    المشاركات:
    1,772
    عدد المعجبين:
    2,170
    مكان الإقامة:
    Nantwich, Cheshire
    Completely dependent on how many volunteers you have to help. If its a paid job from the start then multiple millions will be needed even for a small tank. The same amount of money would cover the overhaul of 2 or 3 standard 4 tanks at least that we already have around, and be more powerful for things like the santas. 82045 may be fantastic to fill a gap in preservation and i cant wait to see it, but this notion of building more than one is where it doesnt add up financially
     
  9. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. The 77xxx was pretty much the antithesis of the concept of standardisation. There have been at least two serious attempts to get a newbuild off the ground. Both stillborn, for whatever reason. TBH, unless either someone runs some convincing simulation proving a quality making them significantly better than anything else, or an eccentric millionaire falls in love with the design, I rather doubt we'll be seeing this one again.
     
    أعجب بهذه المشاركة Matt37401
  10. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's an interesting thing to look at. What would cripple a professional new-build is the combo of sunk design costs and blind alleys that most new-builds go through.

    If anyone could get all the design, jigs, moulds etc *and* the production know-how from a built new-build, and a written guarantee from the ORR that nothing would prevent acceptance, I reckon the cost/time payoff of 100% paid work vs volunteer build could well tip to the professional. Material costs would be the same, build time-table could be optimised, assembly time (and so some prelim costs) would be less, etc.

    The people who will know this (in some years time) will be CTL steel

    Mike
     
    أعجب بهذه المشاركة 30854
  11. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Mike, as I’ve said those in charge of building 82045 have said they’re willing to let anyone stupid/willing to batch build 82046/51 are more than welcome to the paperwork, patterns and hard work they’ve had to put in.
    Nobody’s done that yet but it would be interesting to see what would happen if it did.
     
  12. 30854

    30854 Resident of Nat Pres

    إنضم إلينا في:
    ‏8 مارس 2017
    المشاركات:
    12,172
    عدد المعجبين:
    11,496
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That's nowhere near as 'leftfield' as it might at first sound. We're already seeing pointed questions asked about the acceptability of what it will increasingly take to keep ever more ancient machines in steam.
     
    أعجب بهذه المشاركة Hicks19862
  13. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I don’t disagree with that, I’m just saying there’s an offer on the table should someone wish to take it up.
     
  14. 35B

    35B Nat Pres stalwart

    إنضم إلينا في:
    ‏18 جوان 2011
    المشاركات:
    28,731
    عدد المعجبين:
    28,658
    الجنس:
    ذكر
    مكان الإقامة:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Possibly, although the records at Kew in particular can be subject to winnowing before they get in.


    Sent from my iPad using Tapatalk
     

مشاركة هذه الصفحة