If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

الموضوع في 'Heritage Railways & Centres in the UK' بواسطة The Black Hat, بتاريخ ‏13 فبراير 2011.

  1. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Where as you don’t have to worry about things like this on a nice piece of kit like ohhhh an EE Type 3? Just sayin… :);)
     
    أعجب بهذه المشاركة Steve
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Given the choice between a Schools and an EE type 3, I’d take the Schools any day. The best thing about a Type 3 is getting off it.
    Just saying……:):)
     
    Sheff, RLinkinS, YorkyLad و 2 آخرون معجبون بهذا.
  3. D1002

    D1002 Resident of Nat Pres

    إنضم إلينا في:
    ‏25 إبريل 2011
    المشاركات:
    9,847
    عدد المعجبين:
    7,547
    الجنس:
    ذكر
    مكان الإقامة:
    Enfield
    The cab of Cheltenham:
    9B4BBFA2-032E-45C7-BF3D-04E36742B27C.png
     
    Johnme101 و Bluenosejohn معجبون بهذا.
  4. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,551
    عدد المعجبين:
    11,955
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Have a mate who’s an ex Barton Hill driver who’d definitely agree with you on that one my friend! :)
     
  5. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,057
    عدد المعجبين:
    3,137
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Absolutely, if it’s anything like the day I spent as second man on a 33 on a filming job. Much of the time was sat around awaiting instructions, but the noise and vibration never stop. Never again.


    Sent from my iPad using Tapatalk
     
    أعجب بهذه المشاركة Steve
  6. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All services on the NYMR between Pickering and Levisham have been cancelled today:

    Due to operational reasons out of our control, we've had to make the difficult decision to cancel our advertised services on Wednesday 28 September.

    We will still be operating a reduced hop-on hop-off shuttle service between Levisham, Goathland, Grosmont and Whitby and all services will be half price for this day only (28/09/2022). Tickets available from Booking Offices only.

    Anyone know why?
     
  7. Steamie Boxes

    Steamie Boxes Member

    إنضم إلينا في:
    ‏17 أوت 2017
    المشاركات:
    721
    عدد المعجبين:
    674
    الجنس:
    ذكر
    الوظيفة:
    Apprentice Enginner at NYMR
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No signalman available for New Bridge box
     
  8. brennan

    brennan Member

    إنضم إلينا في:
    ‏11 سبتمبر 2016
    المشاركات:
    408
    عدد المعجبين:
    452
    مكان الإقامة:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Unofficial strike action ?
     
  9. MrDibbs

    MrDibbs New Member

    إنضم إلينا في:
    ‏24 يناير 2019
    المشاركات:
    181
    عدد المعجبين:
    149
    مكان الإقامة:
    York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There's been a shortage of bobbies for most of the year it seems, with turns regularly being filled last minute. The Gala was very much an exception as folk resurface for the weekend.
     
  10. brennan

    brennan Member

    إنضم إلينا في:
    ‏11 سبتمبر 2016
    المشاركات:
    408
    عدد المعجبين:
    452
    مكان الإقامة:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    How many are needed each day for the whole railway?
     
  11. ruddingtonrsh56

    ruddingtonrsh56 Well-Known Member

    إنضم إلينا في:
    ‏14 سبتمبر 2009
    المشاركات:
    1,180
    عدد المعجبين:
    1,812
    الجنس:
    ذكر
    مكان الإقامة:
    Nottinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'd presume 5 - 5 boxes (Pickering, New Bridge, Levisham, Goathland and Grosmont) and 1 bobby per box
     
  12. Lineisclear

    Lineisclear Well-Known Member

    إنضم إلينا في:
    ‏24 ماي 2020
    المشاركات:
    1,207
    عدد المعجبين:
    1,353
    الجنس:
    ذكر
    مكان الإقامة:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Almost right. New Bridge controls Pickering ( Pickering South box is just a demo.one) so for a normal day it's four
     
  13. chrishallam

    chrishallam Well-Known Member

    إنضم إلينا في:
    ‏25 مارس 2007
    المشاركات:
    1,039
    عدد المعجبين:
    377
    مكان الإقامة:
    Uk
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Can either of the intermediate boxes be switched out, allowing a less frequent, but still full line service?
     
  14. andyc

    andyc New Member

    إنضم إلينا في:
    ‏28 مارس 2006
    المشاركات:
    80
    عدد المعجبين:
    9
    Certainly I believe years ago Levisham could but couldn't say if it still can be. I assume so.
     
  15. Lineisclear

    Lineisclear Well-Known Member

    إنضم إلينا في:
    ‏24 ماي 2020
    المشاركات:
    1,207
    عدد المعجبين:
    1,353
    الجنس:
    ذكر
    مكان الإقامة:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Only Levisham can be switched out in theory but it hasn't been possible in practice for a number of years. In any event the benefit of doing so is limited to those times when there is no need for trains to pass there. Consequently the impact tends to be on shortening the signalman's hours or removing the need to cover the few evening Pullman turns rather than reducing the number of signalmen required.
     
  16. black5

    black5 Well-Known Member

    إنضم إلينا في:
    ‏1 إبريل 2006
    المشاركات:
    2,055
    عدد المعجبين:
    2,925
    الوظيفة:
    Theatre
    مكان الإقامة:
    Merseyside>Bury
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How does (did) that work with the level crossing, was it crew operated?
     
  17. Lineisclear

    Lineisclear Well-Known Member

    إنضم إلينا في:
    ‏24 ماي 2020
    المشاركات:
    1,207
    عدد المعجبين:
    1,353
    الجنس:
    ذكر
    مكان الإقامة:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    When the box is switched out the crossing goes to road user working. There are manual pump handles each side ( with instructions) and a release lever to lower the barriers. Inevitably some users fail to lower them after driving over the crossing. In that case post mounted white flashing lights in the Up and Down directions will not display. Their flashing is a signal to footplate crews that the the barriers are fully down across the road. In the absence of a white flashing light the train will stop some distance from the crossing and a member of the crew will have to walk to one of the barrier pedestals and use the barrier release level to lower them and trigger the white flashing light.
     
    YorkyLad و black5 معجبون بهذا.
  18. brennan

    brennan Member

    إنضم إلينا في:
    ‏11 سبتمبر 2016
    المشاركات:
    408
    عدد المعجبين:
    452
    مكان الإقامة:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Isn't this one of the reasons that some evening dining trains used to go to Battersby ( or maybe they still do)?
     
  19. D7076

    D7076 Well-Known Member

    إنضم إلينا في:
    ‏21 ديسمبر 2007
    المشاركات:
    1,538
    عدد المعجبين:
    691
    If it’s been a shortage all year ,perhaps some of the Park Street office staff should be trained up ,would actually be a benefit to operations then.
     
    YorkyLad, 47406 و Steve معجبون بهذا.
  20. Lineisclear

    Lineisclear Well-Known Member

    إنضم إلينا في:
    ‏24 ماي 2020
    المشاركات:
    1,207
    عدد المعجبين:
    1,353
    الجنس:
    ذكر
    مكان الإقامة:
    Worcestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That suggestion has already been made on another forum. Resilience from within the paid staff may indeed have some merit but it's far from a simple cost free solution. The implied suggestion that Park Street office staff are no benefit to operations is nonsense. Without the support provided by their roles there would be no operations!
    Then the cost has to be factored in. To train a signalman from scratch probably needs a minimum of around 20 practical training turns. There 's also the theory course. Ideally that would be done on a voluntary basis out of working hours but an employer can't insist on that. Once passed out competence has to be maintained and documented. So that means practical experience has to be reasonably frequent......probably at least one turn a month to prevent the signalman "going rusty". That's for one box. Shortage of signalmen can occur at any of the four boxes so to cover them all with a competent staff member means four days a month.
    Recruiting a staff member for one job, which has to be justified by cost/benefit analysis, and then requiring the employee ( if he or she agrees) to spend around four working weeks training, and almost one working week a month doing something else, is economic illiteracy.
    Of course the ideal is if the staff member volunteers to acquire and maintain such competence in their own unpaid time. Then the occasional diversion from the day job would probably make sense. There are already examples of that such as one of the marketing team volunteering on the footplate and ready to help out in an emergency. However, much as posters on the other forum might wish otherwise, an employer cannot make volunteering in any capacity a condition of employment.
    I can' help but speculate that perhaps there would be greater enthusiasm for such volunteering from amongst the paid staff, whether at Park Street or elsewhere, if they weren't subjected to unfounded sniping suggestions that they are a burden on the NYMR.
     
    Brunswick Green 2 و Copper-capped معجبون بهذا.

مشاركة هذه الصفحة