If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Bluebell Railway General Discussion

本贴由 Jamessquared2013-02-16 发布. 版块名称: Heritage Railways & Centres in the UK

  1. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,791
    支持:
    64,456
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, 949 is very close to being finished AFAIK - definitely further ahead than 328. But I didn’t do a complete tour of the C&W, just poked my head in, and 949 wasn’t visible - think it is in the paint shop, or was last time I saw it.

    Tom
     
    已获得Mark Thompson30854的支持.
  2. Mark Thompson

    Mark Thompson Well-Known Member

    注册日期:
    2017-09-10
    帖子:
    1,591
    支持:
    3,934
    性别:
    所在地:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Yes, Howard, very much so. It is fully glazed, the doors are all on, and the carriage itself is in the first topcoats. The doors themselves are a little further behind, in undercoat, but the carriage is essentially complete. The most recent "Brighton Matters" states that 949 still needs some attention on E Road, the Stroudley-Rusbridge alarm box requires final fitting in the guards compartment, plus of course, it is awaiting its slot in the paintshop, which presumably will be after the Hastings brake has had its turn.
    Edit- reading Tom's post, it would appear to have jumped the Hastings brake to the paintshop!
     
    已获得H Cloutt30854的支持.
  3. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,791
    支持:
    64,456
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interesting press release from yesterday: the railway has been awarded a one-off grant of £692,500 from Mid Sussex DC to help create and enable access to a "suitable natural green space" at Hill Place Farm. From what I can see, that is essentially some of the developer's contribution to the new estate that has sprung up adjacent to the line south of the viaduct, but is being paid directly in advance by the council, rather than the railway waiting for the developer to pay.

    See here: https://www.bluebell-railway.com/bluebell-railway-press-releases/

    I'm not totally certain about the "tunnel beneath the railway", presumably that is part of the scheme (I think the area of the SANG straddles the railway, so this is about joining up the two halves).

    Some of the money will also be used for solar panels, I think on the new carriage shed / OP4 at Horsted Keynes.

    Tom
     
    已获得Johnme101H ClouttMuzTrem的支持.
  4. Paul42

    Paul42 Part of the furniture

    注册日期:
    2006-07-17
    帖子:
    6,092
    支持:
    4,465
    性别:
    所在地:
    East Grinstead
    There is an existing under bridge in the area , so it might be for works to repair/ upgrade it. While travelling on the Beer Festival weekend I noticed an area West of the line which has been landscaped including paths and seating, which can only be accessed using the under bridge.
     
    已获得H ClouttJamessquared的支持.
  5. Penrhynfan

    Penrhynfan New Member

    注册日期:
    2013-10-03
    帖子:
    116
    支持:
    96
    性别:
    There are plans and maps included in the document at https://www.midsussex.gov.uk/media/...l-place-farm-construction-management-plan.pdf.
    There is an existing underbridge (cattle creep?) shown and a new one is also indicated further North-East.
    As often happens with documents posted on websites, the definition of plans is so poor that the text cannot be read due to pixelation. My cynical side wonders if this is due to incompetence or some ulterior motive to hide details.
     
    已获得H ClouttPaul42的支持.
  6. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Colour me befuddled by this sentence: "Natural England has advised the council that one of the best ways to protect Ashdown Forest from increasing visitor numbers is to provide alternative areas for people to visit".

    Reason for befuddlement? From the onset of the original covid lockdown onwards, viewers of local TV stations in Sussex will have heard representatives of bodies controlling the Ashdown Forest and High Weald bemoaning cuts in government funding and using same to justify proposals to introduce charges at parking areas within said areas.

    Are we to now believe the aim is to restrict visitor numbers? Genuinely ..... ?
     
    已获得H Cloutt的支持.
  7. Paul42

    Paul42 Part of the furniture

    注册日期:
    2006-07-17
    帖子:
    6,092
    支持:
    4,465
    性别:
    所在地:
    East Grinstead
    Screenshot_20221007-150728.png
     
    已获得Romsey, Bluenosejohn, Matt37401另外4人的支持.
  8. A1X

    A1X Well-Known Member

    注册日期:
    2011-03-21
    帖子:
    1,211
    支持:
    1,267
    职业:
    Insurance
    所在地:
    Good Old Sussex by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    TBH I translated that as "the best way to look after it is to tell them to bog off and go visit somewhere else".
     
    已获得The Dainton Banker, weltrol, Hawkeye28另外2人的支持.
  9. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,791
    支持:
    64,456
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The latest issue of The Bluebell Times is now available to view for October

    In this issue:
    • Advanced details of next year’s BRPS AGM
    • Introductions to the new Safety and Assurance Director and Museum Curator
    • How No. 65’s trip to the mainline was planned from a beach in Antigua
    • Latest work at Horsted Keynes as renovations gather pace
    • 5 Minutes with BRPS Trustee Laurie Anderson
    • And much much more.
    The Bluebell Times is published monthly on the second Friday of every month. The next issue is due out on Friday, November 11th.

    https://www.bluebell-railway.com/bluebell-times/

    Tom
     
    已获得Johnme10130854Bluenosejohn的支持.
  10. CH 19

    CH 19 Well-Known Member Friend

    注册日期:
    2013-12-30
    帖子:
    1,271
    支持:
    648
    性别:
    职业:
    Hospital Porter
    所在地:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just an idle thought concerning the Ardingly extension, could a power delivery system like the Docklands Light Railway's covered leccy pickup work?
     
  11. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wouldn't have thought so, the DLR system is bottom contact.
     
  12. CH 19

    CH 19 Well-Known Member Friend

    注册日期:
    2013-12-30
    帖子:
    1,271
    支持:
    648
    性别:
    职业:
    Hospital Porter
    所在地:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Aye, but could not the beams and collector shoes be adapted to make the bottom contact possible, I know that would upset the purists but they could just take piccies from the other side lol.
     
  13. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I suspect it'd be rather more involved than it may first appear.
     
    已获得MellishR35B的支持.
  14. 35B

    35B Nat Pres stalwart

    注册日期:
    2011-06-18
    帖子:
    28,731
    支持:
    28,659
    性别:
    所在地:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That would be a change from something gravity based to an upward sprung system. That's non-trivial, and probably at least as challenging on authenticity as the debates over precisely how Flying Scotsman appears.
     
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,263
    支持:
    12,514
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You could always if you can find a suitable vehicle use battery power, with an 2 car emu similar to the 2 HAP/ MLV used on the MHR, with a recharging set up set up at Horstead keynes
     
    已获得MuzTremCH 19的支持.
  16. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    注册日期:
    2019-10-09
    帖子:
    1,401
    支持:
    1,772
    性别:
    职业:
    Retired
    所在地:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Given that Network Rail cannot (at present) get any 3rd rail extension project past the ORR, the chances of any heritage railway getting a TWAO allowing it don't seem too good, to me. And, as I have mentioned before, the old LROs were pretty specific on prohibiting electrification (unless self-contained, ie battery).
    Still, nothing ventured, ... ... ...
    Pat
     
    已获得Jamessquared的支持.
  17. Jamessquared

    Jamessquared Nat Pres stalwart

    注册日期:
    2008-03-08
    帖子:
    27,791
    支持:
    64,456
    所在地:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Apart from that - could we afford the juice these days? ;)

    Tom
     
    已获得A1X, Bluenosejohn, Dunfanaghy Road另外4人的支持.
  18. CH 19

    CH 19 Well-Known Member Friend

    注册日期:
    2013-12-30
    帖子:
    1,271
    支持:
    648
    性别:
    职业:
    Hospital Porter
    所在地:
    W14
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    True, but then the DLR have them so a precedent, and design, has already been set.
    Mind you, I think our @martin1656 has the most workable solution
     
  19. 30854

    30854 Resident of Nat Pres

    注册日期:
    2017-03-08
    帖子:
    12,172
    支持:
    11,496
    性别:
    职业:
    Retired
    所在地:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Pop round Ardingly Showground at the right times with a few buckets and shovels and there's a month's worth of fuel right there.
     
    已获得CH 19的支持.
  20. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,912
    支持:
    5,847
    Does that apply to shielded arrangements such as that on the DLR? That network has been extended in fairly recent years, presumably with the ORR's blessing.

    I suspect that it would be possible in principle for Ardingly, but that the cost would be out of all proportion to the benefit. And if the Bluebell ever gets to Haywards Heath it would be incompatible with the ordinary third rail there. Battery power (or steam, of course) makes more sense.
     

分享此页面