If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Mid Hants Railway Operational Matters

Discussie in 'Heritage Railways & Centres in the UK' gestart door NightRail, 11 jan 2017.

  1. Fireline

    Fireline Well-Known Member

    Lid geworden:
    11 feb 2008
    Berichten:
    1.301
    Leuk Bevonden:
    1.348
    Geslacht:
    Man
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is only really practical if the question of ownership is raised before the railway starts the overhaul. If a shareholder or shareholders decide to let a railway get started on the engine, and then launch an ambush, it's a bit hard for the railway to prepare for that. There has been a recent exercise at our line to try to identify exactly who owns what. (Mind you, good luck with 4253 Ltd, at over 400 shareholders!). I think more railways should be auditing not only what they have, but who owns it. This might just force hiding shareholders into the open, and forewarn the railway of a potential issue ahead.
     
    johnofwessex en ghost vinden dit leuk.
  2. 30854

    30854 Resident of Nat Pres

    Lid geworden:
    8 mrt 2017
    Berichten:
    12.172
    Leuk Bevonden:
    11.496
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I was thinking specifically of 10 year "fast track" overhauls of 'front line fleets', rather than dragging recalcitrant metal back from totally knackered condition (even if I'm sparing a thought for the brave lunatics souls about to do battle with the Ffesterbahn's Alco!). Apologies, as that was obviously not made clear.
     
  3. 21B

    21B Part of the furniture

    Lid geworden:
    2 sep 2009
    Berichten:
    3.896
    Leuk Bevonden:
    8.664
    35005 and 75079 are progressing. Neither should be years away. 30499 could possibly be accelerated if needs be i
    Your post represents only a fraction of the history of this situation. I know enough about that history to know that your conclusions are overly simplistic. I am not going to share that history in public, and so make this post solely so that people are aware that there is a lot more to this than is being presented here and that it was not so simple in the past as is indicated.

    I do not know what is happening right now, or even if there is anything happening beyond a foul up over programming the return. I suggest we should await developments patiently.
     
    Shaggy, 35B, green five en 8 anderen vinden dit leuk.
  4. ghost

    ghost Part of the furniture

    Lid geworden:
    29 mei 2006
    Berichten:
    4.304
    Leuk Bevonden:
    5.727
    Geslacht:
    Man
    Locatie:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not sure that a running agreement with railway X is automatically torn up if a loco was to be sold, especially if the railway has paid up front to overhaul the loco.
    I would have thought that a loco is still under contract to railway X for the remaining period of the agreement regardless of who the new owner is. It's a little like selling a house while having sitting tenants.
     
    Matt78, Swan Age en 21B vinden dit leuk.
  5. Gladiator 5076

    Gladiator 5076 Resident of Nat Pres

    Lid geworden:
    2 okt 2015
    Berichten:
    7.924
    Leuk Bevonden:
    6.657
    Geslacht:
    Man
    Locatie:
    Swanage
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I see lots of talk about overhaul of NRM locos but I thought I had read that apart from FS now back there would be no overhauls for a while due to more pressing issues.
    I guess may have been in SR or RH as RH is the only one I subscribe to and the subscription I bought may dad for SR about 20 years back just keeps running. Eventually normally many months late he passes them on to me.
    Anyone know the actual NRM position?
     
  6. 21B

    21B Part of the furniture

    Lid geworden:
    2 sep 2009
    Berichten:
    3.896
    Leuk Bevonden:
    8.664
    My understanding is that they will not fund overhauls, but that certain vehicles in the collection would be allowed to be overhauled by their borrower. The NRM was trying to keep the number of borrowers low because of course each relationship must be managed. It wouldn't be a huge surprise for both to remain where they are and to receive overhauls in due course.
     
    Johnme101 en Swan Age vinden dit leuk.
  7. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Indeed. For example the NRM and Swanage Railway have reached agreement for the T9 to
    remain at Swanage in storage, pending future discussions on a new overhaul. I’d imagine there will be similar agreements with the MHR regarding 850 and 926.

    If there was no prospect of a new overhaul then 850 would have left the MHR a long time ago.
     
  8. A1X

    A1X Well-Known Member

    Lid geworden:
    21 mrt 2011
    Berichten:
    1.212
    Leuk Bevonden:
    1.268
    Beroep:
    Insurance
    Locatie:
    Good Old Sussex by the Sea
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Presumably both Nelson and Cheltenham also have in their favour that, while both are superb machines, neither is particularly special enough to justify being hauled back to York / Shildon for display (in the way, say, the Q1 was).
     
  9. 61624

    61624 Part of the furniture

    Lid geworden:
    27 sep 2006
    Berichten:
    5.294
    Leuk Bevonden:
    3.599
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    One of the NRM's loan conditions, though, is that items are stored under cover where practical. I'm not sure how this condition can be met with 850 and 925 on the MHR? Perhaps 925 could be a candidate for a loan spell at the Spa Valley instead
     
    Last edited by a moderator: 4 nov 2022
  10. Paul42

    Paul42 Part of the furniture

    Lid geworden:
    17 jul 2006
    Berichten:
    6.096
    Leuk Bevonden:
    4.484
    Geslacht:
    Man
    Locatie:
    East Grinstead
    Unlikely to be any space at the Spa Valley. Margate where the Black Five is, is more likely.
     
    Last edited: 2 nov 2022
  11. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    850 has been out of action for 7 years at the MHR. So they must have found space in one of their workshops somewhere?
     
  12. Ben Jenden

    Ben Jenden Well-Known Member

    Lid geworden:
    27 mei 2019
    Berichten:
    1.166
    Leuk Bevonden:
    911
    Geslacht:
    Man
    Locatie:
    Croydon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    850 is in store in the boiler shop. The tender is up the Ropley headshunt
     
    Paul42 en Hampshire Unit vinden dit leuk.
  13. Jamessquared

    Jamessquared Nat Pres stalwart

    Lid geworden:
    8 mrt 2008
    Berichten:
    27.798
    Leuk Bevonden:
    64.476
    Locatie:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I remember for many years the NRM T9 was stored at Sheffield Park, under cover and accessible to the public (at the expense of putting one of our own locos outside). Then it went off to Swanage and as far as I can see is kept either outside, or else in an engine shed with no public access. So go figure!

    Tom
     
  14. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not forgetting it went to Bodmin first, got overhauled, and we got 10 years enjoying seeing it running at Bodmin and Swanage.

    Currently stored in Swanage engine shed pending overhaul.
     
  15. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    Lid geworden:
    9 okt 2019
    Berichten:
    1.401
    Leuk Bevonden:
    1.772
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That would be after it was repaired and ran at the Watercress Line, n'est ce pas?
    I remember working our tamper between Ropley and Medstead when 120 appeared. First time I'd seen it in steam. Took advantage of the offer for a ride, of course!
    Pat
     
  16. 30854

    30854 Resident of Nat Pres

    Lid geworden:
    8 mrt 2017
    Berichten:
    12.172
    Leuk Bevonden:
    11.496
    Geslacht:
    Man
    Beroep:
    Retired
    Locatie:
    Brighton&Hove
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I recall it in steam on the MHR too. Can't say it had the cleanest exhaust I've ever seen, but a magnificent old machine with a very distinctive presence (can't think how else to put it). Just to think .... I might even live long enough to see it cross, or even double head a train with 563! :)
     
  17. Alan Kebby

    Alan Kebby Well-Known Member

    Lid geworden:
    18 sep 2019
    Berichten:
    1.193
    Leuk Bevonden:
    1.249
    Geslacht:
    Man
    Locatie:
    Brighton
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Correct. Originally restored to steam on the MHR in 1980s. Moved to Swanage early 90s as it was more suited to the less severely graded line. Ran at Swanage for a couple of years until boiler certificate expired. Then Swanage and NRM were unable to agree terms for a new overhaul, so moved to Bluebell for storage. Overhauled and moved to Bodmin about 2010,
    before back to Swanage 2017. Ran at Swanage until ticket expired 2020. NRM and Swanage have made noises about agreeing to another overhaul, but currently stored in engine shed at Swanage.
     
  18. 6026 King John

    6026 King John Well-Known Member

    Lid geworden:
    10 nov 2006
    Berichten:
    1.616
    Leuk Bevonden:
    908
    Locatie:
    Hampton Court, Surrey
    ..... and came back to the Mid-Hants for the Spring Gala in 2013 and 2016
     
  19. green five

    green five Resident of Nat Pres

    Lid geworden:
    30 apr 2006
    Berichten:
    6.783
    Leuk Bevonden:
    2.623
    Geslacht:
    Man
    Beroep:
    Design Draughtsman
    Locatie:
    Hampshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The 2013 visit was very memorable as 30120 was put on a Five coach set. One of the most tense climbs of Medstead bank I have encountered but also one of the best for the way that the crew and loco responded to the challenge after the initial slog away from the speed restriction:



    Sent from my XQ-BT52 using Tapatalk
     
    stuarttrains en Big Al vinden dit leuk.
  20. 21B

    21B Part of the furniture

    Lid geworden:
    2 sep 2009
    Berichten:
    3.896
    Leuk Bevonden:
    8.664
    It was great fun. I stepped onto the footplate for the first time about 30seconds before getting the tip and the previous crew had already gone. All fine and very logical except the drain cocks which took me until the outer home to shut
     
    Gilesy68 en green five vinden dit leuk.

Deel Deze Pagina