If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Lynton and Barnstaple - Operations and Development

Тема в разделе 'Narrow Gauge Railways', создана пользователем 50044 Exeter, 25 дек 2009.

  1. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    As regards the first point, it more a matter of that is what we would suggest doing if either (a) required to do and/or (b) a risk-assessment suggested that it would be a good idea. For example, there is an opinion that the signalman at BR will have a less-than-ideal view of the facing points north of the over-bridges, so TCs on the points to indicate whether or not the train is clear of them could be advisable. In which case, the TC can be used to lock the FPL as well.

    As regards your second point, I quite agree and something which we have kept in mind and stressed whenever such matters are discussed - I'm all for the Keep It Simple approach. Indeed, to some extent I think we are already at the stage where there is no S&T technician readily available to handle urgent problems at WB anyway, let alone elsewhere.
     
    weltrol, Biermeister и H Cloutt нравится это.
  2. lynbarn

    lynbarn Well-Known Member

    Дата регистрации:
    22 авг 2006
    Сообщения:
    1.554
    Симпатии:
    537
    Пол:
    Мужской
    Род занятий:
    Retired
    Адрес:
    Kent
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The issue with Track Circuits as I understand it was that at one time there was a discussion at trust management level about their concern of having enough volunteers to run the line and it was pointed out to them that it would be easier to have one central power signal box and all the S&T under one controller, I don't have to tell you that a number of us disagreed with that as the only way forward.
     
  3. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    ...yet at the same time there have been suggestions 'from above' that future point-work should be motor-operated rather than mechanical.[#] Also there have been suggestions from some at WB that there ought to be a TC at least on 6B, on the grounds that at busy periods (not withstanding engine whistle codes) the GF operator can't always tell if an engine is clear before changing the points.

    [#] The reason given to me for that suggestion was that apparently some of the 'older' volunteers were having difficulty with the points at WB. Well, a few thoughts on that:-

    1. There is less leverage available on a 'knee' type ground-level frame than on a full-size elevated frame
    2. It does not help when both the main sets of points at WB (4 and 6) are double-ended and so the operator has to move two point ends every time rather than just one (particularly annoying given that in the case of 4 you normally only need to move 4B most of the time)
    3. Points 4 had no compensation (now rectified I believe during the relay last winter)
    4. The compensation on points 6 is not in the correct place (or so I am informed by those more familiar with it) - not sure if that has been rectified.
    5 Presumably the railway is taking steps to recruit more, younger volunteers (for whom it will be less of a problem) to fill the gaps as the existing work-force slowly retires...???
     
    Last edited: 20 ноя 2022
    Tobbes, lynbarn и H Cloutt нравится это.
  4. Michael B

    Michael B Member

    Дата регистрации:
    12 ноя 2020
    Сообщения:
    506
    Симпатии:
    1.317
    Пол:
    Мужской
    Адрес:
    Bristol
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is a prominent heading - 'L & B News' - at the beginning of the L&BR website. The last posting about the Railway apart from notification of the forum a couple of weeks ago, was in May, reporting on the tea rooms and the spring gala. Which suggests either there isn't any or a lack of willingness to provide any.
     
    Last edited: 28 ноя 2022
  5. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.591
    Симпатии:
    3.934
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I agree. It's looking increasingly poor, for a railway with such ambition. Updates used to be regular, almost weekly, and informative. I gather that site maintenance has now been outsourced, but it's certainly done no-one any favours.
     
    H Cloutt, The Dainton Banker, Biermeister и 2 другим нравится это.
  6. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    Indeed.

    My other 'pet hate' about that site is that one has to scroll done a long way in order to see whether or not (far too often the latter!) there has been an update to the members only section.

    I note sadly no report yet - for the benefit of those of us unable to attend - on the recent 'Volunteers' Forum' :-(
     
    Biermeister, Tobbes и Mark Thompson нравится это.
  7. H Cloutt

    H Cloutt Well-Known Member

    Дата регистрации:
    22 дек 2018
    Сообщения:
    1.024
    Симпатии:
    1.498
    Пол:
    Мужской
    Адрес:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wasn't there something recently about someone else managing the websites.
     
  8. Thomas Woods

    Thomas Woods New Member

    Дата регистрации:
    11 янв 2020
    Сообщения:
    89
    Симпатии:
    225
    Пол:
    Мужской
    Адрес:
    Somerset
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    We are working towards providing more on the news section, just have to be patient I'm afraid.
     
    green five, H Cloutt, Biermeister и 2 другим нравится это.
  9. Mark Thompson

    Mark Thompson Well-Known Member

    Дата регистрации:
    10 сен 2017
    Сообщения:
    1.591
    Симпатии:
    3.934
    Пол:
    Мужской
    Адрес:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for that, Thomas - good to know its in hand.
     
    H Cloutt нравится это.
  10. Biermeister

    Biermeister Member

    Дата регистрации:
    4 авг 2019
    Сообщения:
    361
    Симпатии:
    669
    Пол:
    Мужской
    Род занятий:
    Brewer
    Адрес:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks for that Thomas. I am wondering about the 'working towards providing' part. Clearly there must be some issues. Do these relate to:
    * old-fashioned clunky website which needs a considerable up-grade;
    * lack of interesting and/ or relevant news (juicy news is always hungrily devoured, of course); or
    * old-fashioned top-down managerialism where the web-master has to report everything s/he might wish to print to an (overbearing?) review panel?
    Or is it perhaps all three?
    Of course I do realise that some material might be ultra-sensitive given the current state of play but surely Trust members need some reassurance that the Trust is confidently and competently managing its/our affairs, surely?
     
    H Cloutt и Mark Thompson нравится это.
  11. Meatman

    Meatman Member

    Дата регистрации:
    10 апр 2018
    Сообщения:
    696
    Симпатии:
    1.645
    Пол:
    Мужской
    Адрес:
    Burrington,devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    internal politics it seems has caused the issues with the website, the Trust now wanting to pass the running of the website to an external company who will of course be taking a fee for its initial setup and it would seem will also be receiving a small payment for every online transaction made , i believe a statement was made on the news or members page of the archive site some weeks ago but it was stated at the members forum (for those members who couldn't attend it seems there will be no news of what was discussed) that the new look website will be up and running soon
     
  12. sitimela43

    sitimela43 New Member

    Дата регистрации:
    17 окт 2019
    Сообщения:
    84
    Симпатии:
    123
    Пол:
    Мужской
    Адрес:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Not sure where that suggestion that older volunteers were having problems operating the ground frame and points at WB came from. There is a robust and regular inspection and maintenance programme carried out on S&C (and S&T) and no-one carrying out the safety-critical role of guard or signalman has a problem with operating the frame, whatever their age. Also any issues with the compensation on 6A/6B was not because it was wrongly sited, but because the stability of the compensator was inadequate (now resolved). You are correct that points 4A/4B now have compensation.
     
    Last edited: 28 ноя 2022
    H Cloutt нравится это.
  13. sitimela43

    sitimela43 New Member

    Дата регистрации:
    17 окт 2019
    Сообщения:
    84
    Симпатии:
    123
    Пол:
    Мужской
    Адрес:
    Devon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    *Yes
    *No
    *No.
     
    Snail368 и H Cloutt нравится это.
  14. Biermeister

    Biermeister Member

    Дата регистрации:
    4 авг 2019
    Сообщения:
    361
    Симпатии:
    669
    Пол:
    Мужской
    Род занятий:
    Brewer
    Адрес:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks M
     
    H Cloutt нравится это.
  15. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    As regards the first point, the claim was made to the signal design team by someone from 'the management' with regular contact with users of the frame at WB (I don't see any benefit in naming them here, so won't). Maybe they were wrong, but at least the matter was discussed, which was beneficial for the future design.

    As regards the second point, that was my recollection of a discussion with someone who worked 'on the ground' with the S&T equipment. Maybe my recollection was wrong as to the root cause, but certainly there was a problem - good to know that it is now fixed.
     
    H Cloutt нравится это.
  16. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    Speaking as someone with long experience of 'out-sourcing' in IT projects, it is something which often looks good in theory on paper to the accountants, but in reality often falls down in terms of lack of flexibility and speed of response.

    With anything run by volunteers you are always relying on goodwill and people having 'free time' to do such things - I know from personal experience how long it can take for something to get from brain to actual web content :) - but equally many volunteers are willing and able to do 'a quick update' far quicker than having to go through a commercial process. I wonder if the Trust will have obtained a Service Level Agreement with agreed responses times for various categories of web changes ???
     
    Biermeister и H Cloutt нравится это.
  17. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    I have no knowledge of the arrangements on the L&B. But as a heritage railway signalman elsewhere (well, I haven't worked a box since before Covid, but will go back to it at some point), I think it's fair to say that age has very little to do with it and that anyone with a decent level of mental and physical agility and fitness could do the job, regardless of age. Poor technique, on the other hand, and lack of understanding the equipment, are both things which tend to lead to people declaring the job to be too difficult. And that's true of young and old alike. I've lost count of the number of times I've walked into a box halfway through a day (when working split shifts) to find that the previous signalman has every signal wire tightened up like a banjo string and complains that none of the signals will come off...
     
    H Cloutt, Jamessquared и sitimela43 нравится это.
  18. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    To a large extent, I think you are right. On the other hand, poor set-up and/or maintenance of the equipment does not help the situation - I hasten to add that I am not saying that was/is the case at WB.

    Points 6 at Blue Anchor could be temperamental - a long rod run (and a touch over the 350 yards limit) on a curve, with the rollers often gunged-up by earth falls from the side of the cutting, and quite often they needed several attempts in order to be able to get the FPL bolt in and/or obtain detection, but I found that usually a good hard kick to the lever solved that problem :) (not something you can do these days now that they are motorised). By contrast crossover 15 at Midsomer Norton South is almost outside of the box, yet can be a devil of a job to change from observation (I've not tried it myself recently - unwise thing to do with a slipped disc :-( ).
     
    H Cloutt нравится это.
  19. pmh_74

    pmh_74 Part of the furniture

    Дата регистрации:
    28 янв 2009
    Сообщения:
    2.423
    Симпатии:
    1.707
    Yes, that's also a valid concern although I intentionally didn't include it as, as stated, I've no knowledge of such matters at Woody Bay. (Except to presume that long rodding runs aren't an issue if the points are worked from a ground frame.)

    The north crossover at Loughborough is not too far from the box but very temperamental. Often one end will go over OK and the other standing just off, so the FPL won't go in. It is said that part of the problem is part of the rodding run in sun and part of it in shade, so the compensation goes a little off. How valid this is I don't know. When the crossover was laid back in the 70s, the geometry wasn't quite right either, but I seem to recall that was fixed a few years ago. As I said, it's about 3 years since I last did a shift so things may have changed since. What I can say with certainty is that the S&T were regularly maintaining it!
     
    lynbarn и H Cloutt нравится это.
  20. RailWest

    RailWest Part of the furniture

    Дата регистрации:
    7 дек 2011
    Сообщения:
    3.984
    Симпатии:
    7.802
    Пол:
    Мужской
    Адрес:
    West Country
    It would appear that the latest Newsletter may now be in the post to members.

    So...here's a suggestion for who ever it may concern - why not upload the Newsletter as a PDF to the members-only section of the web-site? Then a quick posting on social media to advise people that it's there and those of us online could all read it sooner :)
     
    Tobbes, ghost, lynbarn и 2 другим нравится это.

Поделиться этой страницей