    Boiler 1.jpg boiler 2.jpg boiler 3.jpg
    Continuing the theme of good news coming out of Bo'ness this week after our award of an additional £234k from the NHLF for our Steaming Ahead project, very happy to say that work has recommenced on 'Morayshire'!

    "After a long hiatus work has recommenced on the overhaul of unique Gresley D49 'Morayshire'. Initial work is focused on getting the boiler to the stage of a hydraulic test early next year. To this end the Boiler Inspector has required that the new flue tubes are replaced and that remedial work is undertaken to the sling stays. The boiler was moved into the works of Locomotive Maintenance Services Ltd this week where, as the photo shows, steady progress is now being made.

    This work is only possible thanks to the continued generosity of our supporters. If you would like to see Morayshire back in action, please consider making a donation towards the overhaul fund: www.virginmoneygiving.com/fund/246Morayshire"

    Photos courtesy of Locomotive Maintenance Services Ltd.
     
    已获得Chris86, S.A.C. Martin, andrewshimmin另外8人的支持.
  2. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I read this as meaning that the new flue tubes are to be replaced as in "put back into the boiler", not replaced as in "they aren't useable and need complete replacement again". I hope the first of these statements is the applicable one. Hopefully the work required on the sling stays isn't extensive or hideously costly either.

    Richard.
     
    已获得jnc的支持.
  3. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Hi Richard, unfortunately the flue tubes were damaged when they were expanded (a sharp ridge was left on the inside of the bottle ends) and subsequently failed the independent boiler inspector's examination so they require complete replacement with a new set.

    Andrew
     
    已获得hyboyflying scotsman123jnc的支持.
  4. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Bugger. Sorry to hear that. It's nice to hear that work has re-started though, and that progress is being made. One day I'll hopefully catch up with Morayshire, it's a loco I've never seen but would love to!

    Richard.
     
  5. Matt37401

    Matt37401 Nat Pres stalwart

    注册日期:
    2014-06-08
    帖子:
    15,551
    支持:
    11,955
    所在地:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Cracking machine, I made a point about 10 years ago on the way to Loughborough with my Dad ‘We ain’t going home until we’ve got Morayshire in!’
     
    已获得Richard Roper的支持.
  6. jnc

    jnc Well-Known Member

    注册日期:
    2012-04-03
    帖子:
    1,511
    支持:
    2,709
    性别:
    所在地:
    Western Atlantic
    Heritage Railway Volunteer:
    No I do not currently volunteer
    This seems to bear on the dispute upthread about the work done elsewhere (which I won't name)? Sorry to hear the news.

    Noel
     
    已获得Richard Roperflying scotsman123的支持.
  7. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,862
    支持:
    9,257
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  8. Richard Roper

    Richard Roper Well-Known Member

    注册日期:
    2006-05-22
    帖子:
    1,310
    支持:
    1,359
    性别:
    职业:
    Librarian
    所在地:
    Just up the road from 56E Sowerby Bridge
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ouch! That looks nasty. I sincerely hope that if a third party did this, they are the ones who will be paying for the replacement flues.

    Richard.
     
    已获得green fiveweltrol的支持.
  9. MellishR

    MellishR Resident of Nat Pres Friend

    注册日期:
    2009-04-16
    帖子:
    8,911
    支持:
    5,847
    Ideally they would, but if they're broke … …
     
    已获得Richard Roper的支持.
  10. weltrol

    weltrol Part of the furniture Friend

    注册日期:
    2008-12-29
    帖子:
    2,842
    支持:
    687
    Isn't that what your Company insurance should be paying out on?
     
    已获得ghostRichard Roper的支持.
  11. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Further rectification works now rapidly progressing at Locomotive Maintenance Services Ltd (who kindly supplied the photographs too). The replacement section of the outer wrapper has been replaced again and awaits tapping of new stays.

    The bogie axle boxes have also been retrieved from Loughborough and are on their way to Aviemore where our friends at the Strathspey Railway will refurbish them. Once repaired, these will return south to allow the locomotive to be reassembled as a 'rolling chassis' to come home into our new workshop at Bo'ness for finishing.

    We've been able to continue with the repairs to Morayshire thanks to the generous support of many - nearly £30k raised since last summer - and if anyone would like to contribute you can do so here: www.virginmoneygiving.com/fund/246Morayshire

    188863186_4303104273067936_2478234285048312014_n.jpg 188556187_4303104089734621_3833249149581691695_n.jpg 187835311_4303104393067924_4920442306892747482_n.jpg
     
    已获得Chris86, banburysaint, green five另外10人的支持.
  12. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Further progress on Morayshire at both Locomotive Maintenance Services Ltd and Bo'ness. Work on the boiler nears completion and its hoped that Morayshire's rolling chassis will be delivered to Bo'ness towards the end of the year. The locomotive will then enter the new shed for final reassembly! Images show new firebox skirt being prepared for tapping and an assortment of valves after refurbishment, including snifter valveand cylinder relief valves.

    Home straight is in sight but £25,000 is needed to finish the job: you can make a donation online at: www.virginmoneygiving.com/fund/246Morayshire

    248220434_4779162322128793_5566233748911867147_n.jpg 247678472_4779162572128768_7370919053662384862_n.jpg 247650616_4779162328795459_4860553116647957968_n.jpg 248052831_4779186972126328_4433547433958536057_n.jpg 248362144_4779186808793011_8459256931362258341_n.jpg 248457754_4779186828793009_8078614767454602494_n.jpg
     
    已获得Chris86, ross, 26power另外14人的支持.
  13. bluetrain

    bluetrain Well-Known Member

    注册日期:
    2019-03-03
    帖子:
    1,561
    支持:
    1,584
    性别:
    所在地:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thread has gone quiet.

    Anyone know if there has been further progress? Has the locomotive returned to Scotland or is it still in the Midlands?
     
  14. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The locomotive remains in store in the Midlands whilst overhaul of Tornado is finished at Locomotive Maintenance Services, tender is being worked on at Bo’ness. Announcement expected at some point in January on the next steps!
     
    已获得joe_issitt, Richard Roper, green five另外2人的支持.
  15. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    6B97D22F-60FC-42A3-B99D-D2B2515D3A7A.jpeg
    Posted within ‘Blastpipe’ today so can now share more widely some fantastic news!


    £144,000 Grant to Finish D49 Overhual!

    We are happy to announce that in January 2023 we were awarded £144,290.00, which means that we can successfully finish the overhaul of D49 ‘Morayshire’ and see her back running on the B&KR.

    At the end of 2022, we submitted an application to the National Heritage Memorial Fund Covid19 Response Fund to help us finish the overhaul of ‘Morayshire’. The funding was awarded due to Morayshire’s importance as an item of national importance and to ensure its continued running as an operational locomotive.

    Work will soon start on completing Morayshire’s overhaul once the funding paperwork has been completed. The overhaul will be a mixture of contractor work off site and volunteer work based at Bo’ness. We have been lucky that the funding award will cover the cost
    of outsourcing sections of the work, while we undertake other elements in the Engineering Workshop. The timescale for turnaround for the overhaul is 12 months, which means that we will see Morayshire back running on the B&KR in 2024. After a year based at the B&KR we will be looking at hiring the locomotive out to other railways to meet the access requirements of the grant, but do not fear we will still see her at Bo’ness throughout this time.

    The NHMF grant covers about 88% of the total costs, with the SRPS contributing volunteer labour to the project. This leaves a shortfall of £20,000 that we hope to raise through generous donations. We hope that people will be willing to help us raise this final amount now that we have managed to secure the majority of funding for the locomotive.
     
    已获得CH 19, taliesin1999, ykin01另外22人的支持.
  16. D6332found

    D6332found Member

    注册日期:
    2016-12-03
    帖子:
    399
    支持:
    233
    性别:
    所在地:
    Dinting
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Any news- ruours of progress? NYMR visit one day?
    I'm really interested which locs the old boiler ran in sure its in a Yeadons I read one... Anyone have the details?
    Many possible thanks in anticipation
     
  17. 5944

    5944 Resident of Nat Pres

    注册日期:
    2006-01-14
    帖子:
    8,862
    支持:
    9,257
    性别:
    职业:
    Train Maintainer for GTR at Hornsey
    所在地:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  18. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Back to Bo’ness.

    The boiler remains at David Wright’s works where it is being finished but through mutual agreement it has been decided the quickest way to get the locomotive into service is for the SRPS to finish & reassemble the bottom end given David’s current workload.

    Rough target, as in understand it, is for completion in summer 2026.
     
    已获得banburysaint, Johnme101, acorb另外8人的支持.
  19. steam_mad

    steam_mad Member

    注册日期:
    2011-04-18
    帖子:
    683
    支持:
    1,493
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    IMG_5985.jpeg IMG_5990.jpeg IMG_5989.jpeg IMG_5991.jpeg
    Progressing nicely alongside the overhaul of the D49 is a LNER train to go with her, something of a 30 year long project! Fortunately the support of a benefactor allows us to have 3 sets of Gresley bogies overhauled by a contractor, the first of which returned to Bo’ness yesterday.
    • Thompson TTO No. 13803, built 1946, steel panelled in scumbled teak. Overhauled bogies returned to Bo’ness this week to allow this vehicle to return to service this spring.
    • Gresley TK No. 10021, built 1924. Full body rebuild and interior reconstruction completed in 2023, awaiting bogie overhaul, expected to enter service 2025.
    • Gresley RB No. 644, built 1937. Full body rebuild and interior reconstruction completed in 2013, awaiting bogie overhaul, expected to re-enter service 2025.
    • Gresley BTK No. 62515, built 1924. Undergoing full restoration to varnished teak, project started 2024 and hoped to be finished in 2-3 years.
     
    Last edited: 2025-01-16
    已获得MuzTrem, Chris86, Bluenosejohn另外13人的支持.
  20. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,840
    支持:
    1,644
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wonderful, TTO is a new one on me ... Something open 3rd ?
     

分享此页面