    According to the NNR website Tornado will not be ready to fulfil her commitments at the NNR at the end of May.
     
    brmp201 se sviđa ovo.
  2. guycarr360

    guycarr360 Part of the furniture

    Pridružen(a):
    4. Listopad 2005.
    Poruka:
    4,874
    Lajkova:
    3,191
    Spol:
    Muškarac
    Grad:
    Chester le Street County Durham
  3. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Last edited: 20. Travanj 2023.
    agalpin and green five like this.
  4. westernrenown

    westernrenown New Member

    Pridružen(a):
    2. Rujan 2011.
    Poruka:
    32
    Lajkova:
    21
    Didn’t the NNR have problems with a German boiler bodge job on the B12 many years ago ?
     
  5. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    10,636
    Lajkova:
    2,903
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    IIRC this was passed OK before shipment? So what has happened from ex works to the UK?
    Has shipping caused the problems?
     
  6. 242A1

    242A1 Well-Known Member

    Pridružen(a):
    3. Prosinac 2006.
    Poruka:
    1,562
    Lajkova:
    1,309
    From reading the news article it appears that some stay replacement was planned but it seems that there was not the time to replace them all. Little surprise there in a post C19 world. As for the tubes we have not been told exactly what the objection was or how the installation of these new tubes differed from the installation of those previously fitted. It will be interesting to find out in due course.
     
    Bluenosejohn, guycarr360 i osprey se sviđa ovo.
  7. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,818
    Lajkova:
    12,016
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I’ve no idea of what the problem is but we’re the tubes welded in? German and UK practice differs in the method of doing this.
     
    osprey se sviđa ovo.
  8. 242A1

    242A1 Well-Known Member

    Pridružen(a):
    3. Prosinac 2006.
    Poruka:
    1,562
    Lajkova:
    1,309
    I recall David Elliot saying that the method used to install the small tubes was different and he felt that this was a good thing because it altered the gas flow through the tubes. This alteration allowed more gases to flow through the flue tubes with a subsequent improvement in superheater performance. There are details which I do not know but I suspect that someone did not like German practice. Reason? We don't know but I wonder what exactly changed.
     
  9. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,423
    Lajkova:
    12,626
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The problem is that as the engine operates in the UK, It has to comply with UK boiler regs, and the method of installing the tubes did not comply so the only option, is to cut out new, unused tubes, at great cost, obtain a complete new set, again at great cost, install them to comply with UK regs, those doing the work in Germany, should have been aware of the differing methods that need to be employed, for an engine that operates in the UK, as opposed to the EU.
     
  10. Steve

    Steve Resident of Nat Pres Friend

    Pridružen(a):
    7. Listopad 2006.
    Poruka:
    12,818
    Lajkova:
    12,016
    Interesi:
    Gentleman of leisure, nowadays
    Grad:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are no regulations other than compliance with the Pressure Systems Regulations which is silent on the subject. It is down to the opinion of the Competent Person who essentially signs it off. However, there is a British Standard for welded boilers which gives details on tube installation and quality and compliance with this is usually the accepted methodology. There is no standard for steam locomotive boilers of conventional riveted construction which is why the HRA issue guidance notes.
     
    Bluenosejohn and Sheff like this.
  11. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,341
    Lajkova:
    5,850
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Could you please quote a source for this assertion. I don't believe the A1 Trust have confirmed the actual problem with the tubes.
     
  12. osprey

    osprey Resident of Nat Pres

    Pridružen(a):
    3. Listopad 2007.
    Poruka:
    10,636
    Lajkova:
    2,903
    Interesi:
    semi-retired, currently doing R&D for my patents
    Grad:
    Halifax
    Fantasy...I think the source...
     
    6960 Raveningham Hall and ghost like this.
  13. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,084
    Lajkova:
    3,148
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Regarding the stays, if they needed replacing I don’t see doing that here, rather than there, significantly alters the overhaul programme? It probably entails an additional hydraulic test too, which would delay the steam test.

    As you say, the same boiler has already been tubed twice in the past (once when new, and again at the first 7 year overhaul), so what’s different this time? I doubt it’s another ‘Brexit benefit’, so what’s gone on?

    And while we’re on the subject of boilers, what’s the status of the two long overdue new boilers (and their tubes), bearing in mind the first one was destined for Tornado’s overhaul, which could have obviated this whole tube & stay issue?


    Sent from my iPad using Tapatalk
     
    Bluenosejohn and torgormaig like this.
  14. guycarr360

    guycarr360 Part of the furniture

    Pridružen(a):
    4. Listopad 2005.
    Poruka:
    4,874
    Lajkova:
    3,191
    Spol:
    Muškarac
    Grad:
    Chester le Street County Durham
    The situation has alarming similarities to Aussie 3801's boiler issues.

    Having seen the boiler at first hand, i cannot believe that Meineghan allowed it out of the works in that condition.

    I can only assume a heavy knock in transit, or similar to cause the issue, did they use Evri to move it.....
     
    osprey se sviđa ovo.
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,423
    Lajkova:
    12,626
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Why else remove the entire set of tubes, then?? Its not something you would normally do, unless you had to, they are brand new for god's sake, have you ever worked on a steam loco? and fantasy, really, once you cut out tubes, you unless you can weld on new flue ends, which i'm not even sure is allowed now, the tubes are scrap, perhaps a boilersmith can back me up on this, the staining looked to be around the flue and smoke tubes, not the tube plate there has been no mention of work needed on the tube plate itself .
     
  16. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,341
    Lajkova:
    5,850
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Maybe there has been a flaw found in the tube material? Maybe a treatment was applied that shouldn't have been. Maybe the weld material was incorrect. We simply don't know, so you can't make statements as though you do.
    Yes, although I don't see what that's got to do with anything.
    If you're putting forward your opinion as fact without any statement from the Trust to back you up, then why would it matter if I've worked on a steam loco????
     
  17. std tank

    std tank Part of the furniture

    Pridružen(a):
    20. Rujan 2005.
    Poruka:
    3,941
    Lajkova:
    1,076
    Spol:
    Muškarac
    Interesi:
    Retired
    Grad:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Does the "Red Book" still rule, Steve?
     
  18. The Green Howards

    The Green Howards Nat Pres stalwart

    Pridružen(a):
    20. Veljača 2016.
    Poruka:
    15,133
    Lajkova:
    8,693
    Interesi:
    Layabout
    Grad:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    If they did, they'd still be looking for it in a depot...
     
    green five, Sheff, Bluenosejohn i 4 ostalih se sviđa ovo.
  19. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,857
    Lajkova:
    1,655
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On arrival in the U.K., and following inspection by British Engineering Services, there has been a concern around the quality and installation of the small tubes in Tornado's boiler. At present we are not able to confirm if this is a material or welding issue so all parties (A1SLT, DB Meiningen and BES) have agreed that the most expeditious action is to replace the small tubes whilst we investigate the issue. This approach will not only ensure continued quality and reliability but will be the fastest route to complete the boiler ready for installation on the frames.

    Source 21st century steam ( afka A1SLT) news page February 2023. Doesnt confirm what the problem with the tubes is, only that there is a problem perhaps its a case of being diplomatically vague...
     
    green five and martin1656 like this.
  20. ghost

    ghost Part of the furniture

    Pridružen(a):
    29. Svibanj 2006.
    Poruka:
    4,341
    Lajkova:
    5,850
    Spol:
    Muškarac
    Grad:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Exactly. I had previously read that statement on the A1 website and could find no definitive cause mentioned.
    That's why I took issue with Martin's assertion that it was definitely the method of installing the tubes, when none of us actually know.
     
    osprey se sviđa ovo.