    I'm sure I read somewhere, that there is no intention of that being a manned control cabin. I think they plan on using obstacle detectors.
     
  2. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,416
    支持:
    12,617
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think it might be safer if Junction Rd could also be monitored at the Bodiam end, with the ability to be switched out, if the station is ever unmanned, the crossing can be controlled by treadles, linked to colour light signals, but if theres ever a problem, with the power, its easier to get someone to site from Bodiam than from Robertsbridge, if a crossing ever has to be manually operated i would imagine the train would stop short, and the crew would operate the crossing, via a locked panel and proceed , then repeat the operation,
     
  3. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,036
    支持:
    1,505
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My undertanding is that the crossings will be controlled by Treadles with Colour light signals and obstruction detection - the 3 crossings are to be monitored from the new Cabin adjacent to the A21.
     
    已获得D1039的支持.
  4. Woof Mk2

    Woof Mk2 Member

    注册日期:
    2015-10-26
    帖子:
    340
    支持:
    245
    性别:
    所在地:
    Padstow
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thats going to cost quite a few pennies...
     
  5. Biermeister

    Biermeister Member

    注册日期:
    2019-08-04
    帖子:
    361
    支持:
    669
    性别:
    职业:
    Brewer
    所在地:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
  6. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,813
    支持:
    12,009
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
  7. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,416
    支持:
    12,617
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That expensive system might be what the ORR are going to insist on, Certainly the A21 will need to be fully controlled, the other two, possibly might not need to be so complex, they will all have to be of the powered barrier type, ideally with some manual operation in the case of cable problems, i think it will be a good safeguard to have crew operated switch panels on the approaches that can trigger the lights and barriers, if something goes wrong,
     
  8. Steve

    Steve Resident of Nat Pres Friend

    注册日期:
    2006-10-07
    帖子:
    12,813
    支持:
    12,009
    职业:
    Gentleman of leisure, nowadays
    所在地:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The ORR will insist on it being fit for purpose, not where it is purchased from.
     
    已获得Woof Mk2, Wenlock, gwalkeriow另外3人的支持.
  9. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,036
    支持:
    1,505
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A lot of design work has been done already and submitted to the ORR, National Highways and the Public Inquiry.
     
    已获得Biermeister, Wenlock, alastair另外1人的支持.
  10. Biermeister

    Biermeister Member

    注册日期:
    2019-08-04
    帖子:
    361
    支持:
    669
    性别:
    职业:
    Brewer
    所在地:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Harold, You might know of the new Northiam level crossing? I remember reading something about a pre-cast concrete LC being installed there recently-ish, but there's nothing in Tenterden Terrier No. 150. Was it some work done by London Underground and Bakerail? Anyone?
     
  11. Wenlock

    Wenlock Well-Known Member Friend

    注册日期:
    2008-10-26
    帖子:
    2,126
    支持:
    1,381
    性别:
    职业:
    Bus Driver
    所在地:
    Loughton Essex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Covered I think in the online Newsletter.

    There was some kind of 'work in' to give staff from several rail maintenance companies experience of the track work, without affecting the National Network. Three work sites. The KESR had to do a lot afterwards, but it was a big help. Not sure whether the crossing was part of that, but it was soon after.
     
    已获得Nick CBiermeister的支持.
  12. Miff

    Miff Part of the furniture Friend

    注册日期:
    2008-06-17
    帖子:
    3,040
    支持:
    3,116
    已获得Biermeisterbrmp201的支持.
  13. Biermeister

    Biermeister Member

    注册日期:
    2019-08-04
    帖子:
    361
    支持:
    669
    性别:
    职业:
    Brewer
    所在地:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Mike. The Northiam LC is indeed mentioned in K&ESR Members Newsletter No. 71 (dated 01/05/23) but somewhere else I think I have seen some nice pix of the work done. Anyway, it has been done! Nicely!
     
  14. martin1656

    martin1656 Nat Pres stalwart Friend

    注册日期:
    2014-12-08
    帖子:
    19,416
    支持:
    12,617
    性别:
    所在地:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I remember seeing the video of the installation, so the team will know exactly how to do the works, I don't see an problems with Junction Rd, or Northbridge St, the councils have already seen, the method of working now twice, and must be reassured the road closures will be limited to overnight, Highways agency I would think will probably want someone on site to inspect each stage during the A21 works
     
    已获得Biermeister的支持.
  15. Paul42

    Paul42 Part of the furniture

    注册日期:
    2006-07-17
    帖子:
    6,117
    支持:
    4,507
    性别:
    所在地:
    East Grinstead
    I posted some photos on here in the K&ESR thread, which the railway had posted on Instagram.

    Sent from my XQ-AS52 using Tapatalk
     
  16. Biermeister

    Biermeister Member

    注册日期:
    2019-08-04
    帖子:
    361
    支持:
    669
    性别:
    职业:
    Brewer
    所在地:
    Daylesford, Victoria, Australia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks Paul. I've just scrolled through the K&ESR thread and found them. Yes, these are they! (See Post no.606 of 7 March '23 on p.31 of the thread.)
    Doesn't it look neat? Are the heritage gates there re-installed?
     
  17. Fireline

    Fireline Well-Known Member

    注册日期:
    2008-02-11
    帖子:
    1,322
    支持:
    1,415
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Yes, the gates have remained the heritage "fun to operate in heavy traffic" variety...
     
    已获得johnofwessexBiermeisterH Cloutt的支持.
  18. H Cloutt

    H Cloutt Well-Known Member

    注册日期:
    2018-12-22
    帖子:
    1,036
    支持:
    1,505
    性别:
    所在地:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The ones on the RVR extension will be full barrier.
     
  19. Fireline

    Fireline Well-Known Member

    注册日期:
    2008-02-11
    帖子:
    1,322
    支持:
    1,415
    性别:
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There is an exercise ongoing on the KESR on ways to reduce the total journey time from Tenterden to Robertsbridge, as we are aware that families, in particular, can be put off by a return journey that is just TOO long. As part of that, some of the level crossings may be altered to the barrier type on the current KESR. I know that a number of people have been doing an awful lot of work to try to make the RVR extension work for the KESR once it is built. It's not just a case of "once it's built, we use it." There needs to be a lot of forward planning.
     
    已获得Nick C, Dead Sheep, MellishR另外3人的支持.
  20. class8mikado

    class8mikado Part of the furniture

    注册日期:
    2009-06-01
    帖子:
    3,854
    支持:
    1,655
    职业:
    Print Estimator/ Repository of Useless Informatio.
    所在地:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Find the NYMR and SVR too long for that reason
     
    已获得Dead Sheep的支持.

分享此页面