Maunsell S15 825 NYMR

الموضوع في 'Steam Traction' بواسطة neildimmer, بتاريخ ‏14 جويلية 2023.

  1. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,259
    عدد المعجبين:
    1,164
    Grosmont shed Thursday 13th July
    825 looking very sorry for itself, not sure what the problem is hopefully in service for the Gala later this year
    https://tinyurl.com/5bz662k4

    Neil
     
  2. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,856
    عدد المعجبين:
    12,096
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    No chance, I’m afraid.
     
  3. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,259
    عدد المعجبين:
    1,164
    Whats the problem?
     
  4. Steamie Boxes

    Steamie Boxes Member

    إنضم إلينا في:
    ‏17 أوت 2017
    المشاركات:
    731
    عدد المعجبين:
    740
    الجنس:
    ذكر
    الوظيفة:
    Apprentice Enginner at NYMR
    مكان الإقامة:
    Grosmont
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Cracks in the smoke box tubeplate, so will be a while until that's back out
     
  5. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,259
    عدد المعجبين:
    1,164
    Ok thanks

    Neil
     
  6. Dunfanaghy Road

    Dunfanaghy Road Well-Known Member

    إنضم إلينا في:
    ‏9 اكتوبر 2019
    المشاركات:
    1,438
    عدد المعجبين:
    1,849
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Alton, Hants
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    How many S15 parts does the NYMR have? I thought there were 2, plus the remains of 841.
    Pat
     
  7. 61624

    61624 Part of the furniture

    إنضم إلينا في:
    ‏27 سبتمبر 2006
    المشاركات:
    5,294
    عدد المعجبين:
    3,602
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There are chassis parts of 825, 841 and 830 but only 2 boilers between them. I think it was the intention at one time to overhaul the second boiler to reduce the downtime when 825's boiler was in need of overhaul but I don't think it progressed very far. Not far enough to be considered as a viable swap candidate yet, at any rate, although I don't think a repair plan for 825 exists yet. A shame as it seems to be an ideal loco for NYMR purposes and its absence (along with 76079) leaves the Whitby fleet a bit weak.
     
  8. neildimmer

    neildimmer Resident of Nat Pres

    إنضم إلينا في:
    ‏6 جوان 2008
    المشاركات:
    9,259
    عدد المعجبين:
    1,164

    just 926 & 5428 for Whitby turns left now
     
  9. Mick45305

    Mick45305 Member

    إنضم إلينا في:
    ‏26 مارس 2013
    المشاركات:
    271
    عدد المعجبين:
    605
    مكان الإقامة:
    Huddersfield
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Isn’t 44806 being certified to run to Whitby? Another candidate in the not too distant future if so.
     
  10. torgormaig

    torgormaig Part of the furniture Friend

    إنضم إلينا في:
    ‏17 جويلية 2007
    المشاركات:
    5,031
    عدد المعجبين:
    7,939
    I was 825's fireman on the afternoon of Tues 2nd May. We had a perfectly normal trip (Grosmont - Whitby - Pickering - Grosmont) and the loco was in good fettle and steaming well. We took it on shed for disposal and opened the smokebox for the fitter to look round. Initially satisified he were about to close it up when a whisp of steam from the tubeplate below the header caught his eye. Further examination suggested that maybe it was coming from a rivet, so it was arranged for the boiler smith to come in at 5am next morning to have a closer look at it. And the rest as they say is history.... What he found was a small crack on the outside of the tube plate, which I believe on more detailed later examination showed it to be a much larger crack on the inside.

    We certainly had no idea that afternoon that the engine would not be working again for some considerable time. Despite it being a nice sunny day I never even took a picture of it on its final working.

    Peter
     
    ykin01, banburysaint, Romsey و 3 آخرون معجبون بهذا.
  11. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,856
    عدد المعجبين:
    12,096
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work started on 830's boiler a good few years ago with Roy Haines doing the work after he had retired as a full time boilersmith. Unfortunately Roy passed away and the job stopped. I think that there was a plan to continue with the work once 825's boiler was completed but no idea what happened with this plan. If I remember correctly the firebox wasn't the best, having half side patches riveted on.
     