If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

LMS Patriot Project Updates

الموضوع في 'Steam Traction' بواسطة Gav106, بتاريخ ‏10 إبريل 2011.

  1. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Radio silence for quite a long time . . . Does anyone have any recent news about progress with The Warrior?
     
    أعجب بهذه المشاركة Sheff
  2. lee98

    lee98 New Member

    إنضم إلينا في:
    ‏3 ماي 2009
    المشاركات:
    1
    عدد المعجبين:
    0
     
  3. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Your reason for quoting something from April is what?
     
  4. bluetrain

    bluetrain Well-Known Member

    إنضم إلينا في:
    ‏3 مارس 2019
    المشاركات:
    1,561
    عدد المعجبين:
    1,584
    الجنس:
    ذكر
    مكان الإقامة:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The project website is forecasting completion in 2026. Shows an engineering update to August 2022.

    https://lms-patriot.org.uk/
     
  5. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,788
    عدد المعجبين:
    64,441
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I wonder how many more millions they will need to raise and spend between now and then? :rolleyes:

    Tom
     
    أعجب بهذه المشاركة 240P15
  6. Paul42

    Paul42 Part of the furniture

    إنضم إلينا في:
    ‏17 جويلية 2006
    المشاركات:
    6,092
    عدد المعجبين:
    4,465
    الجنس:
    ذكر
    مكان الإقامة:
    East Grinstead
    Screenshot_20221229-125426.png
     
    Johnme101 و Bluenosejohn معجبون بهذا.
  7. bluetrain

    bluetrain Well-Known Member

    إنضم إلينا في:
    ‏3 مارس 2019
    المشاركات:
    1,561
    عدد المعجبين:
    1,584
    الجنس:
    ذكر
    مكان الإقامة:
    Wiltshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer

    Accounts for 2021/22 have been posted on the Companies House website. They show total income for the year as being £271K. So if the locomotive is going to take 4 more years to complete, that suggests around a further £1m (or so) cost.

    https://find-and-update.company-information.service.gov.uk/company/06502248/filing-history

    I notice that there is no specific mention in the accounts of any compensation being expected from the liquidators of Llangollen Rly plc. The accounts of the Llangollen's administrators had earlier reported that the Patriot Project was claiming £100K compensation, but their latest report ("Move from Administration to Creditors Voluntary Liquidation" - para 5.11) estimates that unsecured creditors will will only get back 16.5p per £.


    https://find-and-update.company-information.service.gov.uk/company/02716476/filing-history
     
  8. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,911
    عدد المعجبين:
    5,847
    If the company had not gone into liquidation there would presumably have been some negotiation and possibly legal action over whether there was any entitlement to compensation for poor work and if so how much. As things stand, does someone seeking compensation count as a creditor at all?

    Edit: changed "receivership" to "liquidation".
     
  9. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I am definitely not a legal authority, so judge reliability of this comment appropriately.

    I very much doubt someone *claiming* compensation counts as a creditor. Someone legally owed compensation surely would. However if to establish a right to compensation you have to pay your lawyers fees 100p per £1, but your compensation will come back at 16p per £1 then the sums probably don't add up. And I think we can be reasonably confident no law firm would take on such a claim without being paid in full upfront.
     
    Last edited: ‏31 ديسمبر 2022
  10. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,512
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There is a lesson here, and its to ensure that the firm you contract to do the work, is doing it to the required standard, and to check, and double check the work, don't take reputation for granted, Any firm worth its reputation, would welcome inspection of what they are doing, As ever hind sight is great, but mistakes were made, that should have not been made, those running the Project at the time, are just as culpable as those doing the work, you should never take for granted that your hard earned funds are being spent wisely, Now its money flushed down the drain, and you won't get any of it back, and your back to stage one, plus extra time and money now has to be spent, because it was not done right to start with, and every single bit has to be removed, checked rectified or replaced, If you don't have an competent engineer , then you get one to oversee the work, had that been done from day one, , the mistakes might have been avoided,
     
    S.A.C. Martin, Aberdare و std tank معجبون بهذا.
  11. 60017

    60017 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    9,102
    عدد المعجبين:
    8,071
    الجنس:
    ذكر
    الوظيفة:
    Retired from corporate slavery :o)
    مكان الإقامة:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Instead of repeating what everyone already knows, why don't you say something positive?
     
    7P6F, Gav106, The Dainton Banker و 8 آخرون معجبون بهذا.
  12. W.Williams

    W.Williams Well-Known Member

    إنضم إلينا في:
    ‏20 ديسمبر 2015
    المشاركات:
    1,650
    عدد المعجبين:
    1,559
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Aberdeenshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Appraising what has happened , in a transparent way, isn't necessarily negative. The positive is that the project is moving forwards.

    The way in which it is moving forwards, particularly the attention to detail, should give us all confidence.

    It may be uncomfortable to read the above regarding having engineering competence acting as oversight, but it's a lesson humans have had to keep re-learning for at least the last 2000 years.

    Personally, I'm happy to read and hear it again and again, because no matter how well appraised this engineer may like to think he is on any given day, barely a week goes past where something doesn't surprise me, or make me pause and think....hmmm, could that have been foreseen, been done better, or, will that cause problems going forwards?

    Continuous improvement is by definition an uncomfortable process.

    We can either embrace that discomfort or ignore it and make the same old mistakes over and over.
     
  13. Musket The Dog

    Musket The Dog New Member

    إنضم إلينا في:
    ‏5 يناير 2022
    المشاركات:
    198
    عدد المعجبين:
    458
    الجنس:
    ذكر
    الوظيفة:
    Mechanical Engineer
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    andrewshimmin, Diamond Gaz, Mick45305 و 7 آخرون معجبون بهذا.
  14. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think the Patriot team are to be congratulated on "keeping the faith" despite all the horrendous difficulties that they have encountered. It is easy with hindsight to see what should/could have been done differently but I'm sure that they were given all sorts of positive information...at the time.
     
    andrewshimmin, Johnme101, Diamond Gaz و 3 آخرون معجبون بهذا.
  15. Paul Grant

    Paul Grant Well-Known Member

    إنضم إلينا في:
    ‏6 اكتوبر 2010
    المشاركات:
    1,524
    عدد المعجبين:
    1,120
    مكان الإقامة:
    Fife
    Heritage Railway Volunteer:
    No I do not currently volunteer
    أعجب بهذه المشاركة andrewshimmin
  16. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,574
    عدد المعجبين:
    1,781
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    andrewshimmin, keith6233, ghost و 2 آخرون معجبون بهذا.
  17. andalfi1

    andalfi1 Well-Known Member

    إنضم إلينا في:
    ‏5 نوفمبر 2008
    المشاركات:
    1,007
    عدد المعجبين:
    466
    الجنس:
    ذكر
    الوظيفة:
    Semi Retired.
    مكان الإقامة:
    Haworth
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    All been said before, move on...
     
  18. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,512
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    a bit slow aren't you, my remark was posted back in Dec 2022, I have moved on, have you?
     
    andrewshimmin, Great Western و 45517 معجبون بهذا.
  19. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    In the latest Engineering Report they say "The original set of wheels and axle obtained from 8F No. 48518 has now been declared unfit for further main line use as the parts are out of specification for use on a Patriot-design bogie. We are investigating possible short term use of this wheelset for heritage line use whilst a replacement wheelset is manufactured." This may offer a potential route to gradually stepping down from mainline aspirations.
     
    أعجب بهذه المشاركة andrewshimmin
  20. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,911
    عدد المعجبين:
    5,847
    Or a stepping stone towards mainline operation at a later date.
     
    أعجب بهذه المشاركة Gav106

مشاركة هذه الصفحة