If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

A2 60532 Blue Peter

الموضوع في 'Steam Traction' بواسطة big.stu, بتاريخ ‏3 نوفمبر 2014.

  1. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I was of the same opinion but at the last minute I changed my mind simply because I realised that it would probably never happen again in my lifetime. To see all those A4's together, two of which I hadn't seen since the sixties, did bring a lump to my throat. I wasn't bothered about taking any photographs and was just content to wander around them at close hand and stand in the cabs. Even SWMBO, who has no real interest in railways was impressed by the sight and thought it worth the effort.
     
    hyboy, S.A.C. Martin, 35B و 10 آخرون معجبون بهذا.
  2. MarkinDurham

    MarkinDurham Well-Known Member

    إنضم إلينا في:
    ‏4 ماي 2007
    المشاركات:
    2,229
    عدد المعجبين:
    999
    مكان الإقامة:
    Durham
    Exactly so. Yes, you'll be unlikely to get photos as good as those seen in the magazines at such events, but the whole point of it was to experience what may well be unrepeatable, certainly in the lifetime of quite a few of us. I thoroughly enjoyed it, as did family members who came along too. I sadly missed the Great Goodbye due to work, but had gone to Shildon when 60008 and 60010 arrived, simply because, again, this was going to be unrepeatable, especially as 60010 was going to get the makeover in the workshops before going to York.

    Mark
     
    3ABescot, 2392, Dan Hill و 1 شخص آخر معجبون بهذا.
  3. guycarr360

    guycarr360 Part of the furniture

    إنضم إلينا في:
    ‏4 اكتوبر 2005
    المشاركات:
    4,873
    عدد المعجبين:
    3,187
    الجنس:
    ذكر
    مكان الإقامة:
    Chester le Street County Durham
    75mph running???
     
  4. Matt37401

    Matt37401 Nat Pres stalwart

    إنضم إلينا في:
    ‏8 جوان 2014
    المشاركات:
    15,552
    عدد المعجبين:
    11,961
    مكان الإقامة:
    Wnxx
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Tom, I really do think you miss the point I was trying to make.
     
    أعجب بهذه المشاركة The Green Howards
  5. RASDV

    RASDV Member

    إنضم إلينا في:
    ‏8 ماي 2010
    المشاركات:
    497
    عدد المعجبين:
    199
    مكان الإقامة:
    Midlands
    Reported on LSL Facebook that hydraulic test passed this afternoon.
    Steam test next
    Screenshot_20230821-173935.png
     
    MPR, Sam 60103, Bluenosejohn و 16 آخرون معجبون بهذا.
  6. Simon Smith

    Simon Smith New Member

    إنضم إلينا في:
    ‏23 فبراير 2022
    المشاركات:
    123
    عدد المعجبين:
    85
    مكان الإقامة:
    South West
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Shame the person shaking the inspectors hand isn't the one that did all the work..........
     
    green five, The Green Howards, Chris86 و 1 شخص آخر معجبون بهذا.
  7. Sheff

    Sheff Resident of Nat Pres

    إنضم إلينا في:
    ‏21 إبريل 2006
    المشاركات:
    8,084
    عدد المعجبين:
    3,148
    الجنس:
    ذكر
    الوظيفة:
    Retired Engineer & Heritage Volunteer
    مكان الإقامة:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Nothing new there then, all too common these days.


    Sent from my iPhone using Tapatalk
     
    The Green Howards و Dunfanaghy Road معجبون بهذا.
  8. lappinp

    lappinp New Member

    إنضم إلينا في:
    ‏21 جويلية 2007
    المشاركات:
    139
    عدد المعجبين:
    38
    Just passed Crewe and the boiler is being fired with plenty of smoke coming out of chimney. Only a brief glimpse from a late running 9:33 to Manchester
     
    acorb, Mick45305, John Merry و 3 آخرون معجبون بهذا.
  9. D1002

    D1002 Resident of Nat Pres

    إنضم إلينا في:
    ‏25 إبريل 2011
    المشاركات:
    9,952
    عدد المعجبين:
    7,633
    الجنس:
    ذكر
    مكان الإقامة:
    Enfield
    From a Facebook Group:

    IMG_0432.png
     
    MPR, 73129, BrillTramway و 16 آخرون معجبون بهذا.
  10. northernsteam

    northernsteam Member

    إنضم إلينا في:
    ‏25 ماي 2010
    المشاركات:
    609
    عدد المعجبين:
    297
    الجنس:
    ذكر
    الوظيفة:
    Used to be in civil engineering, highway bridges.
    مكان الإقامة:
    Tyne and Wear
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Wonderful to see this magnificent locomotive returning to use again. Thanks to all involved.
     
    أعجب بهذه المشاركة blink bonny
  11. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,416
    عدد المعجبين:
    12,617
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    there is still quite a lot to do, and there is still the system tests to ensure everything works as it should, I would not expect to see 60532 on mainline test runs before end of the year, November/ December
     
  12. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,629
    عدد المعجبين:
    2,900
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    You have all this information from LSL?
     
  13. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,941
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    That was only a boil-up yesterday, not a steam test.
     
    أعجب بهذه المشاركة 26D_M
  14. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,981
    عدد المعجبين:
    9,508
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    You mean you can't do a steam test with the safety valves missing? ;)
     
    green five, Steve و Jamessquared معجبون بهذا.
  15. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,813
    عدد المعجبين:
    12,009
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Depends what you've replaced them with. ;) Let me know when you do and I'll keep away.
     
    Jamessquared, MarkinDurham, lynbarn و 6 آخرون معجبون بهذا.
  16. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,416
    عدد المعجبين:
    12,617
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Clearly this was not the official test then, quite often once you've passed the hydraulic, you will raise steam gently, in stages to ensure that everything is still sound, and the safety valves are set before the official test, If I remember correctly you are allowed to carry out further testing to set safety valves under steam, before the actual official steaming in the presence of the examiner, that of course is only the first stage, there is then a second stage when the loco is complete when the various systems, are tested by moving under its own steam when if passed the loco is then signed off,
     
    أعجب بهذه المشاركة lynbarn
  17. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,416
    عدد المعجبين:
    12,617
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Its called having been involved with loco restorations and there is a lot of work that needs to be done, even once the steam test is done, the boiler needs to go back in the frames, everything plumbed up, electronics installed then, theres more testing, to ensure it all works as it should, test runs, Mileage acquisition, then a trip to the paint shop, it can take several months from passing the steam test, to ready to run, even on the most simple of engines, without complex electronics. air braking, and all the other add on's needed for mainline running.
     
    أعجب بهذه المشاركة lynbarn
  18. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,941
    عدد المعجبين:
    1,076
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If you look at the photo you will see that no safety valves are in place. The steam is coming out of the two holes in the seatings. Also the fire doors have not been fitted.
     
    أعجب بهذه المشاركة osprey
  19. osprey

    osprey Resident of Nat Pres

    إنضم إلينا في:
    ‏3 اكتوبر 2007
    المشاركات:
    10,629
    عدد المعجبين:
    2,900
    الوظيفة:
    semi-retired, currently doing R&D for my patents
    مكان الإقامة:
    Halifax
    I'm aware of that but you quoted Nov/Dec so you must have detailed information from LSL or are being somewhat surmising...
     
    guycarr360, Paul42, Steve و 1 شخص آخر معجبون بهذا.
  20. Kje7812

    Kje7812 Part of the furniture

    إنضم إلينا في:
    ‏25 نوفمبر 2010
    المشاركات:
    2,859
    عدد المعجبين:
    1,209
    مكان الإقامة:
    Kidderminster/ York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler passed its out of frames steam test last Wednesday (30th August) according to a post by LSL.

    Sent from my moto g(7) play using Tapatalk
     
    Johnme101, Matt37401, green five و 3 آخرون معجبون بهذا.

مشاركة هذه الصفحة