If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

6880 Betton Grange

الموضوع في 'Steam Traction' بواسطة Thompson1706, بتاريخ ‏4 نوفمبر 2011.

  1. 2857Harry

    2857Harry Well-Known Member

    إنضم إلينا في:
    ‏5 جوان 2023
    المشاركات:
    1,203
    عدد المعجبين:
    2,485
    الجنس:
    ذكر
    الوظيفة:
    Conductor/Guard
    مكان الإقامة:
    Kidderminster/Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You won’t get John to understand logic like that!

    As you say I think it’s good that it follows a Western tradition of recycling parts for use on new engines.
     
    أعجب بهذه المشاركة hyboy
  2. Jamessquared

    Jamessquared Nat Pres stalwart

    إنضم إلينا في:
    ‏8 مارس 2008
    المشاركات:
    27,790
    عدد المعجبين:
    64,453
    مكان الإقامة:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    My concern isn’t about recycled parts. It is that when you have set entirely new frames up from scratch, only running in will show if everything is perfectly aligned. That happens even to an extent on an overhaul if you have dropped the wheels and refurbished the axle boxes / horns; but the stakes seem higher if you are also dealing with entirely new alignment of frames, stretchers and cylinders that has never turned a wheel.

    Still, those on the ground seem confident so they must have grounds for that confidence.

    Tom
     
    clinker, Bluenosejohn, Sheff و 1 شخص آخر معجبون بهذا.
  3. Jimc

    Jimc Part of the furniture

    إنضم إلينا في:
    ‏8 سبتمبر 2005
    المشاركات:
    4,117
    عدد المعجبين:
    4,821
    الوظيفة:
    Once computers, now part time writer I suppose.
    مكان الإقامة:
    SE England
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A Grange built of new parts would be thoroughly unauthentic.
     
    Copper-capped و hyboy معجبون بهذا.
  4. Steve

    Steve Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏7 اكتوبر 2006
    المشاركات:
    12,729
    عدد المعجبين:
    11,847
    الوظيفة:
    Gentleman of leisure, nowadays
    مكان الإقامة:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Even BR used to run steam locos in. In my youth I would regularly catch a particular stopping train from Leeds to Doncaster rather than a slightly later fast train; the reason being that the stopper was always used as a running in from the Doncaster Plant and would generally have a pacific on it, even though it was slow and only about five coaches.
     
    Hampshire Unit, clinker, Jamessquared و 2 آخرون معجبون بهذا.
  5. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,575
    عدد المعجبين:
    1,782
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I guess from the SVRs perspective there's quite a few options;

    1- It turns up and performs flawlessly straight out of the box- tea and medals all round.

    2- It turns up, with known issues that confine it to appearing in light steam or moving round a minimal amount.

    3- It turns up, and the decision is made to use it on light duties, on locals or as a pilot for double headed services

    5- it doesn't make it, and something else covers it's duties.

    In most cases, I'm sure folk will still be pleased to see it even if it's usage is more minimal than originally planned, I can well imagine that people might be a bit miffed if it doesn't even appear at some point.

    A turn out where it just drags a brake van about on a running in turn would still likely go down better than not I'd have thought.

    Chris
     
  6. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,537
    عدد المعجبين:
    18,383
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It was an observation not a criticism
     
  7. 2857Harry

    2857Harry Well-Known Member

    إنضم إلينا في:
    ‏5 جوان 2023
    المشاركات:
    1,203
    عدد المعجبين:
    2,485
    الجنس:
    ذكر
    الوظيفة:
    Conductor/Guard
    مكان الإقامة:
    Kidderminster/Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Be honest you’d criticise the GWR whatever the situation!
     
  8. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Item 3 Weight limit on Victoria Bridge. No double heading.
     
  9. Chris86

    Chris86 Well-Known Member

    إنضم إلينا في:
    ‏31 اكتوبر 2011
    المشاركات:
    1,575
    عدد المعجبين:
    1,782
    الوظيفة:
    Safety, technical and vehicle trainer
    مكان الإقامة:
    South Yorkshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Duly noted, still gives other options or coming off before the bridge?

    Chris
     
  10. 2857Harry

    2857Harry Well-Known Member

    إنضم إلينا في:
    ‏5 جوان 2023
    المشاركات:
    1,203
    عدد المعجبين:
    2,485
    الجنس:
    ذكر
    الوظيفة:
    Conductor/Guard
    مكان الإقامة:
    Kidderminster/Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Well no doubleheading of 2 large locos….

    Doesn’t necessarily stop a large/small pairing
     
    أعجب بهذه المشاركة Chris86
  11. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,862
    عدد المعجبين:
    9,257
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I think part of the concern in some quarters stems from the fact a lot of the work was done at Llangollen. Ask the Patriot group what they thought of the work carried out there on their new build. Or the boiler overhaul of Morayshire, where they couldn't even get the tubes to line up with the holes in the tubeplate properly.

    The website doesn't inspire much confidence either. The "about us" section states they're aiming to have the loco ready for 2018! The Bluebell Atlantic group's approach of "it'll be ready when it's ready" is much more convincing, rather than continually setting and completely missing advertised completion dates.
     
    35B و Johnb معجبون بهذا.
  12. Thompson1706

    Thompson1706 Part of the furniture

    إنضم إلينا في:
    ‏19 نوفمبر 2007
    المشاركات:
    2,523
    عدد المعجبين:
    1,886
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You need to get your facts right about who carried out the work before spouting s**t - stirring drivel like this.

    Bob.
     
    Johnme101 و std tank معجبون بهذا.
  13. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I personally cannot understand the urgency to include engines for galas when they have not even turned a wheel, your just inviting trouble, either the owners have to back out at the 11th hour, leaving you an engine short, with very little time to find a replacement, or it turns up and is not. fit to run without help, to me it would make more sense if the Grange was static, possibly in steam, then after the gala, that's when it could be run in, shaken down, get the miles in, and then put into service with a themed gala later in the year.
     
  14. bristolian

    bristolian Member

    إنضم إلينا في:
    ‏25 جويلية 2005
    المشاركات:
    531
    عدد المعجبين:
    297
    الجنس:
    ذكر
    مكان الإقامة:
    Huntingdon. Formerly from Bristol.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    A
    A similar situation arose with the Class 58 a year ago. If the SVR is willing to accept the loco before it's even turned a wheel in anger, that's their choice. Everyone must be quietly confident, if not with fingers crossed.
     
  15. 2857Harry

    2857Harry Well-Known Member

    إنضم إلينا في:
    ‏5 جوان 2023
    المشاركات:
    1,203
    عدد المعجبين:
    2,485
    الجنس:
    ذكر
    الوظيفة:
    Conductor/Guard
    مكان الإقامة:
    Kidderminster/Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Surely you must understand that there is some urgency to attract the first public running of 6880, particularly as we at the SVR are the first of thr big Western Region railways events of the season. If it went WSR or GWSR before us we’ve lost that attraction.

    And the above is why this gamble is worth it. It has a lot of potential to attract several extra punters (the gala sales are already doing very well), and we can only expect tickets to increase when 6880 arrives.

    As for hosting a gala later in the year for the loco, firstly the above reason of getting it before the other big gala players is key, secondly our Autumn event is pretty set already.
     
    Johnme101 و bristolian معجبون بهذا.
  16. brennan

    brennan Member

    إنضم إلينا في:
    ‏11 سبتمبر 2016
    المشاركات:
    408
    عدد المعجبين:
    452
    مكان الإقامة:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Ho, hum, let me think. Locomotive owners sent their pride and joy to Llangollen to be fixed. ( note that the engineering business and the railway were one and the same hence the failure of both). Locos are returned, recovered , removed ( take your choice) by the owners and all have significant defects. Now, how could that have happened?
     
    أعجب بهذه المشاركة thegrimeater
  17. 5944

    5944 Resident of Nat Pres

    إنضم إلينا في:
    ‏14 يناير 2006
    المشاركات:
    8,862
    عدد المعجبين:
    9,257
    الجنس:
    ذكر
    الوظيفة:
    Train Maintainer for GTR at Hornsey
    مكان الإقامة:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Which bits are wrong Bob? The frames of 5551 have had to be completely stripped down to component parts and significant errors have been found. The photos of the flue tubes from 62712 are still online if anyone wants to see them. Yes, Llangollen Engineering did some great work - 60007's boiler has had no significant faults with it since overhaul there - but there are a lot of horror stories that have come out.
     
  18. std tank

    std tank Part of the furniture

    إنضم إلينا في:
    ‏20 سبتمبر 2005
    المشاركات:
    3,927
    عدد المعجبين:
    1,070
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Liverpool
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Where the errors found on 5551 done by Llangollen or other contractors?
     
  19. Thompson1706

    Thompson1706 Part of the furniture

    إنضم إلينا في:
    ‏19 نوفمبر 2007
    المشاركات:
    2,523
    عدد المعجبين:
    1,886
    الجنس:
    ذكر
    الوظيفة:
    Retired
    مكان الإقامة:
    Rhiwabon
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm not putting anything on this forum , but when I retire from the railway all will be revealed regarding who was to blame. That's it !

    Bob.
     
  20. martin1656

    martin1656 Nat Pres stalwart Friend

    إنضم إلينا في:
    ‏8 ديسمبر 2014
    المشاركات:
    19,260
    عدد المعجبين:
    12,514
    الجنس:
    ذكر
    مكان الإقامة:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    So, what you are saying, it's really about the money, it might generate, I can understand that, on owners, and hirers pints of view, the owner, having spent a lot of money wants to start getting some back, often in disagreement with the people who overhauled the loco, who might want to ensure its ready, I blame the owner, more than the hirer, they are the ones who have the say, but often the pot is empty and it needs to be refilled as soon as possible, so the temptation is always there to say yes, and hope your overhaul team have done a good job, and the engine does not come back broken,
     

مشاركة هذه الصفحة