If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

North Yorkshire Moors Railway General Discussion

Discuție în 'Heritage Railways & Centres in the UK' creată de The Black Hat, 13 Feb 2011.

  1. oldmrheath

    oldmrheath Well-Known Member

    Înscris:
    18 Iun 2006
    Mesaje:
    2.334
    Aprecieri primite:
    2.563
    Surely any loco is full size, unless it is a scale replica?

    Jon
     
    Steve apreciază asta.
  2. 3855

    3855 Member

    Înscris:
    27 Sep 2008
    Mesaje:
    632
    Aprecieri primite:
    481
    Sex:
    Masculin
    Locație:
    inside a boiler
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    i don't....
     
    ghost apreciază asta.
  3. Selsig

    Selsig Member

    Înscris:
    6 Mai 2007
    Mesaje:
    980
    Aprecieri primite:
    443
    Locație:
    Coventry, United Kingdom, United Kingdom
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Indeed, and in truth given the entire front line fleets of the Ffestiniog, Welsh Highland, Vale of Rheidol, Brecon Mountain and Snowdon Mountain Railways were oil fired at one point, makes the achievement somewhat less impressive. I know the locos aren't on the same scale as an S160, but an NGG16 isn't small.

    John
     
  4. 47406

    47406 Well-Known Member

    Înscris:
    24 Oct 2006
    Mesaje:
    1.287
    Aprecieri primite:
    145
    Sex:
    Masculin
    Ocupație:
    Operations Manager
    Locație:
    County Durham
    Following this weekends bus crash, no access from Egton into Grosmont until 2026. Access via Sleights or use other stations if more convienent I guess?

    https://www.bbc.co.uk/news/articles/c25ll7j5zlyo

    https://www.bbc.co.uk/news/articles/cd1xxvly5g9o

    PLANNED ROAD RESTRICTION NOTIFICATION - EM River Esk Bridge Front Street Grosmont

    Location: Front Street, Grosmont CP, Grosmont, Unknown

    Description of works: Damage to bridge following vehicle damage - inspection and repairs

    The Restriction will be in place for a period of 549 days between 5th August 2024 and 4th February 2026

    The Road Restriction and any associated traffic management can be viewed using this URL link https://one.network/?tm=139840908#

    Regards

    North Yorkshire Council
     
    sunstream apreciază asta.
  5. Archivist

    Archivist New Member

    Înscris:
    24 Mai 2022
    Mesaje:
    12
    Aprecieri primite:
    34
    Locație:
    Darlington
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Close shave! We were up at Grosmont last Friday for the dining train, and this road is the driving route into Grosmont given by Google Maps for anyone driving from Darlington and Teesside. Good job we weren’t booked on Saturday’s diner…

    In any sane joined-up world this closure would lead to a re-examination of the service on the Esk Vslley line to see if the timetable could be improved to actually be of any use to anyone wanting to use it as a piece of integrated public transport in North Yorkshire and to get cars and buses off these narrow dangerous roads (faster services, of at least more of them; better connections at Middlesbrough from Darlington and York; split the service into “park and rail” shuttles etc.) But that won’t happen, so all traffic for the NYMR and the National Park car park in Grosmont will now have to come down the bank and go across the NYMR level crossing. The queues will be horrendous.
     
  6. MrDibbs

    MrDibbs New Member

    Înscris:
    24 Ian 2019
    Mesaje:
    181
    Aprecieri primite:
    149
    Locație:
    York
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I believe the line is pretty much at capacity through the middle of the day, the downsides to a single line with loops, whether you'd be able to gain anything by removing the NYMR from the equation I couldn't say.
     
  7. Archivist

    Archivist New Member

    Înscris:
    24 Mai 2022
    Mesaje:
    12
    Aprecieri primite:
    34
    Locație:
    Darlington
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There might be a capacity issue but I’m not so sure: have any loops been taken out of service in the last thirty years? Because I’m pretty sure that there used to be significantly more trains to Whitby under BR - and most of them started from Darlington, making much better connections with the rest of the country! I don’t think the few paths used by the NYMR are an issue, especially now that Whitby has two platforms. IIRC another problem at the moment is that the service level is dictated by what one train can provide shuttling back and forth. So, at the very least we need another cascaded sprinter.

    I’ve often wondered about the feasibility of splitting the service into a Middlesbrough-Battersby shuttle connecting with a Battersby-Whitby shuttle (first/last trains running through from/to the depot).

    Battersby has plenty of space (hardly anyone lives there) to house a new car park to connect into the trains for a “park and ride and hike” into the national park.

    This would also give Great Ayton - a classic affluent commuter village - a service that might encourage a shift from car to train, and insulate Esk Valley services from delays and problems caused miles away. Currently Great Ayton is “stranded” on the branch, as most commuter services terminate at Nunthorpe. I suspect that no-one in Great Ayton ever uses the train as it’s so useless for any journeys anyone living there might want to take either towards Middlesbrough or Whitby.

    Who knows, although reinstatement from Battersby back to the Leeds Northern mainline at Picton is probably a crayonista fantasy, an eventual reinstatement of the relatively short stretch back to Stokesley could tap into another source of passengers for the national park. Anyway, this is all a bit OT on an NYMR thread. I hope that the bridge closure period noted is a “worst case” scenario and that the road reopens soon, for the sake of Grosmont’s residents and the NYMR.
     
    Last edited: 7 Aug 2024
    silversteellady și 47406 apreciază asta.
  8. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.862
    Aprecieri primite:
    9.259
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The current signalling doesn't allow any more services on the line - @torgormaig or @Steve will probably know more, but I believe it's constrained by Glaisdale - Whitby being one token section with NYMR services joining the section midway. If you look at RTT, you'll see that NYMR services have to be in the platform at Whitby or at Grosmont before a Northern service can depart eastwards from Glaisdale.

    Looking through timetables from the 70s onwards, it appears that it was generally 4 trains per day through to Whitby. Morning and mid-afternoon ones have always been for the school traffic. It's not until recent years that extra services have been added.

    So yes, it is the NYMR's services that are suppressing Northern services on the line. Nothing can change unless a loop is put back in at Sleights, the signalling arrangements are changed, or NYMR stop serving Whitby. Adding extra services would also need more units and more staff, and Northern aren't exactly flush with either at the moment.
     
    silversteellady, Chris86, Paul42 și alți 4 apreciază asta.
  9. Nigel Day

    Nigel Day Member

    Înscris:
    17 Mar 2015
    Mesaje:
    275
    Aprecieri primite:
    715
    Sex:
    Masculin
    Ocupație:
    Steam loco engineer
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I converted a Snowdon locomotive using innovative technology to solve traditional issues with oil firing. I have subsequently used the knowledge is the USA in the early 2000’s, Australia in 2011 with big efficiency savings and on some current projects. This This was all before FMW was on the scene. So the technology is available in the UK. It’s here to be used.
     
    26D_M apreciază asta.
  10. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.731
    Aprecieri primite:
    28.659
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I believe that there are also constraints at Middlesbrough, driven by the interaction of services from as far back as Leeds. That won't affect line capacity, but will affect when paths are available. If you took NYMR out of the equation, it's also worth note that the 1980s rationalisation of the Esk Valley removed the loop at Castleton Moor, further reducing the capacity of the branch.
     
  11. Steve

    Steve Resident of Nat Pres Friend

    Înscris:
    7 Oct 2006
    Mesaje:
    12.729
    Aprecieri primite:
    11.847
    Ocupație:
    Gentleman of leisure, nowadays
    Locație:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    @5944 is pretty much spot on with his analysis. The NYMR would very much like there to be more paths available during the day as what is available to them puts significant constraints on their timetable. The Northern T/T can’t really be altered as the am and pm ‘school trains’ are written in tablets of stone. One of the reasons running to Battersby has been abandoned by the NYMR is that there is no practical return path at a sensible time so that facility couldn’t be used.
     
    silversteellady și Archivist apreciază asta.
  12. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    8.912
    Aprecieri primite:
    5.847
    FMW?
     
  13. Archivist

    Archivist New Member

    Înscris:
    24 Mai 2022
    Mesaje:
    12
    Aprecieri primite:
    34
    Locație:
    Darlington
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Thanks @5944 @35B and @Steve for explaining the constraints introduced by over-excessive rationalisation. Ah well. To remove any ambiguity, I wasn’t proposing an NYMR Battersby shuttle - my idea was that both legs (M’boro to Battersby and Battersby-Whitby) would be covered by the national railway, with the NYMR sticking to its existing “Whitby extension”.

    Whether Northern is strapped for cash is now of lesser relevant given that Northern now exists only as a vestigial rump of the Operator of Last Resort, and will soon hopefully be subsumed into a more logically constituted “regional services” division of Great (ugh!) British Railways. That might be in a position to take a more network-focussed approach to reversing excessive rationalisation, in conjunction with developed transport budgets to the regional mayors. We can but hope.
     
  14. garth manor

    garth manor Well-Known Member

    Înscris:
    10 Apr 2009
    Mesaje:
    1.889
    Aprecieri primite:
    529
    The US outfit assisting the Vera Lynn conversion on the NYMR.
     
  15. 35B

    35B Nat Pres stalwart

    Înscris:
    18 Iun 2011
    Mesaje:
    28.731
    Aprecieri primite:
    28.659
    Sex:
    Masculin
    Locație:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    My optimism is low - let's not forget the downgrading of the line in the BR period.
     
  16. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.862
    Aprecieri primite:
    9.259
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interestingly, three out of the four eastbound bus services run in gaps between the train services, and call at or near some of the stations en route. The one that crashed, 13.10 from Lealholmside, is in the middle of a 4 hour lull in train services. Despite that, and even with it being a summer Saturday in a tourist area, only one passenger was on the bus when it crashed.
     
  17. brennan

    brennan Member

    Înscris:
    11 Sep 2016
    Mesaje:
    408
    Aprecieri primite:
    452
    Locație:
    Gloucester
    Heritage Railway Volunteer:
    No I do not currently volunteer

    Why does the BBC and North Yorkshire Police report that "five people were rescued" then? No that it makes the case for expanding the railway.
     
  18. Jamessquared

    Jamessquared Nat Pres stalwart

    Înscris:
    8 Mar 2008
    Mesaje:
    27.790
    Aprecieri primite:
    64.456
    Locație:
    LBSC 215
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Reminds me of a crash that once occurred on the North Devon & Cornwall Junction Railway. A train and a bus collided at a level crossing. 6 people were involved - the driver, fireman and guard on the train; the driver and conductor on the bus; and one passenger between them!

    Tom
     
    Hirn, MuzTrem și johnofwessex apreciază asta.
  19. 5944

    5944 Resident of Nat Pres

    Înscris:
    14 Ian 2006
    Mesaje:
    8.862
    Aprecieri primite:
    9.259
    Sex:
    Masculin
    Ocupație:
    Train Maintainer for GTR at Hornsey
    Locație:
    Letchworth
    Heritage Railway Volunteer:
    No I do not currently volunteer
  20. 21B

    21B Part of the furniture

    Înscris:
    2 Sep 2009
    Mesaje:
    3.889
    Aprecieri primite:
    8.634
    I wonder if we will eventually find out it was an autonomous vehicle with nobody aboard ;)
     

Distribuie pagina asta