If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

Rasprava u 'Steam Traction' pokrenuta od Leander's Shovel, 20. Listopad 2007..

  1. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,057
    Lajkova:
    3,137
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s more of an aspiration tbh! I’ll check our calendar, who knows, might be there as loco support :D
     
    Last edited: 25. Srpanj 2024.
  2. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Pridružen(a):
    1. Listopad 2023.
    Poruka:
    183
    Lajkova:
    153
    Spol:
    Muškarac
    Grad:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Spot on. Every trustee (and shadow trustee) needs to consider their position and number of them need to resign over this. Until those responsible for destroying trust in the organisation and trashing its hard won reputation have departed it will be impossible to move forward. Given the undoubtedly perilous financial position they are now in, this should happen sooner rather than later.
     
    Sheff se sviđa ovo.
  3. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,912
    Lajkova:
    5,847
    I don't think anyone is guilty of actively "trashing" the Trust's reputation, but it does seem that those in charge over the last few years have been out of their depth in managing the various aspects of the business: the overhaul, the design and installation of ETMS, the agreements for the loco to appear at the NVR (and elsewhere?), and communication with long-suffering supporters.

    I should however add that I have had helpful replies when I have emailed them specific enquiries.
     
  4. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Pridružen(a):
    1. Listopad 2023.
    Poruka:
    183
    Lajkova:
    153
    Spol:
    Muškarac
    Grad:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I would say that their action have significantly damaged their reputation. Of course no one would (hopefully) ever set out to do that, but the results of the decisions they have taken, the people they have recruited (or removed) and the way that has been communicated (or not!) has all played a part!
     
    MellishR se sviđa ovo.
  5. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    8,912
    Lajkova:
    5,847
    I don't think we're diagreeing. They have done a lot of damage, if only through being out of their depth and failing to bring more competent trustees on board.
     
    Sir Ralph Wedgwood and Sheff like this.
  6. twr12

    twr12 Well-Known Member

    Pridružen(a):
    2. Rujan 2007.
    Poruka:
    1,658
    Lajkova:
    820
    1. Overcharge of air brake pipe is a stupid idea in the first place.
    2. The “EP Valves” for AWS and ECTS surely only vent the control air pressure from the Brake Application Unit and Feed Cut off Valve? If it’s only come to light recently that the AWS/TPWS EP valve is not venting the Brake Application Unit and Feed Cut off Valve sufficiently quickly; who on earth approved the system in the first place?
     
  7. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    15,537
    Lajkova:
    18,383
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It seems to work on other engines that are equipped to work air braked trains
     
  8. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Pridružen(a):
    1. Listopad 2023.
    Poruka:
    183
    Lajkova:
    153
    Spol:
    Muškarac
    Grad:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I see the Pullman has been cancelled. I can’t remember how many times this has been rescheduled.
     
  9. Doningtonphil

    Doningtonphil New Member

    Pridružen(a):
    9. Travanj 2013.
    Poruka:
    18
    Lajkova:
    9
    You would think that was the case wouldnt you? However some people like to come up with other ways of doing things.
     
  10. Sir Ralph Wedgwood

    Sir Ralph Wedgwood New Member

    Pridružen(a):
    1. Listopad 2023.
    Poruka:
    183
    Lajkova:
    153
    Spol:
    Muškarac
    Grad:
    Stoke-on-Trent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s the 16th anniversary of Tornado’s first move in Darlington today. This is longer than the average of fifteen years in traffic for the original 49 A1s, being built in 1948/49 and the last withdrawn in Jan 1966.

    Sadly, for the third year running, Tornado is still out of traffic.
     
  11. twr12

    twr12 Well-Known Member

    Pridružen(a):
    2. Rujan 2007.
    Poruka:
    1,658
    Lajkova:
    820
    British Railways Board MT/31 Specification of Brake Equipment for Air Braked & Dual Braked Main Line Locomotives July 1970

    58 Automatic Warning System Performance
    58.3.2 The AWS initial delay must be 2.5 - 3 seconds….

    58.3.3 ….. the air brake pipe pressure must fall from 72.5 to 45 lb/in in 12 - 15 seconds.
     
    Sheff and The Green Howards like this.
  12. The Green Howards

    The Green Howards Nat Pres stalwart

    Pridružen(a):
    20. Veljača 2016.
    Poruka:
    15,102
    Lajkova:
    8,632
    Interesi:
    Layabout
    Grad:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I knew about the 21"Hg of vacuum for vac. brake systems but that's a figure I didn't know for air brake systems.

    EDAS...:)
     
  13. class8mikado

    class8mikado Part of the furniture

    Pridružen(a):
    1. Lipanj 2009.
    Poruka:
    3,840
    Lajkova:
    1,644
    Interesi:
    Print Estimator/ Repository of Useless Informatio.
    Grad:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Tornado turned 16 yesterday, a quick guess suggests that shes been out on the rails and busy for 12 of those and brought a lot to to the table .
    Lets hope to see her back in the game later this year....
     
    sunstream, Paul42, garth manor i 3 ostalih se sviđa ovo.
  14. The Green Howards

    The Green Howards Nat Pres stalwart

    Pridružen(a):
    20. Veljača 2016.
    Poruka:
    15,102
    Lajkova:
    8,632
    Interesi:
    Layabout
    Grad:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
  15. martin1656

    martin1656 Nat Pres stalwart Friend

    Pridružen(a):
    8. Prosinac 2014.
    Poruka:
    19,263
    Lajkova:
    12,514
    Spol:
    Muškarac
    Grad:
    St Leonards
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I just hope this doesn't lead to yet, another cancellation, especially as people have paid out for it, and the NVR needs the money at what point does the trust lose whatever credibility it has left?
     
    Last edited by a moderator: 2. Kolovoz 2024.
    Sheff se sviđa ovo.
  16. Sheff

    Sheff Resident of Nat Pres

    Pridružen(a):
    21. Travanj 2006.
    Poruka:
    8,057
    Lajkova:
    3,137
    Spol:
    Muškarac
    Interesi:
    Retired Engineer & Heritage Volunteer
    Grad:
    N Warks
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    If I were a betting man (which I’m not) then based on the recent ‘track record’ I’d say its odds-on she won’t make it again, or the main tour in September. My heart goes out to the NVR and to all those customers who have been similarly let down over the last two years. I have next to no sympathy for those who created this mess, and perpetuate it with their continued obfuscation as to the reality of the situation. I gave what time I could during the original 6 month overhaul period, up to the point when tickets went on sale for tours only 2 months ahead, and all we had were a set of bare frames still in need of repair. At that point I walked rapidly away.
     
  17. Big Al

    Big Al Nat Pres stalwart Staff Member Moderator

    Pridružen(a):
    30. Svibanj 2009.
    Poruka:
    22,589
    Lajkova:
    22,715
    Grad:
    1016
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Whatever your financial involvement, or not, you cannot help but feel sorry for the A1ST as this is a tale of failure to keep control of an overhaul combined with a lack of knowledge about what needed to be done and the timescales involved.

    Where sympathy probably ends is how much other organisations have been completely misled into thinking that something would happen involving Tornado at their venue, or with their train, when it hasn't.

    It was very simple really and this is not a hindsight comment but a common sense one. Sort out the overhaul and promise nothing until you are at the point where a steam test and a test run is all that remains.

    Filling the vacuum of progress with unfulfilled promises was, and still is, bizarre.
     
    Sheff, ianh, alastair i 6 ostalih se sviđa ovo.
  18. Victor

    Victor Nat Pres stalwart Friend

    Pridružen(a):
    20. Kolovoz 2006.
    Poruka:
    14,526
    Lajkova:
    9,196
    Interesi:
    Retired
    Grad:
    DEWSBURY West Yorkshire
    Or the WCRC mantra............expect it when you see it, no progress updates.
     
  19. acorb

    acorb Part of the furniture

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    2,950
    Lajkova:
    4,379
    Grad:
    Powys
    Yes, but the problem is that when you are spending other people's money, they want to see progress - especially when you want and need a lot more of it.
    Tornado has for the last decade been the beacon of preservation achievement - the embodiment of what can happen when enthusiasm, engineering and good project management combine.
    The trouble the A1st have is that they have now lost credibility and with that trustworthyness. It's a hard landing when you fall from the top..
    How they have handled the latest issues certainly has not helped. It's no good shouting everything is fine, when everyone can see it is all imploding around you. It just makes you look completely detached from reality.
    The loco is close to steaming, if it was me I would be concentrating on making that happen as soon as possible - a light engine run to Quorn and back would help considerably with all the jitters.
    Then we need a period of honesty and self reflection, as well as some public recognition of what has gone wrong.
    And I really hope the considerable amount of money has been well spent - the mainline needs a well turned out and reliable Tornado - I would imagine RTC (& Ian Riley!) would welcome her return!!
     
    Last edited: 4. Kolovoz 2024.
  20. 35B

    35B Nat Pres stalwart

    Pridružen(a):
    18. Lipanj 2011.
    Poruka:
    28,731
    Lajkova:
    28,658
    Spol:
    Muškarac
    Grad:
    Grantham
    Heritage Railway Volunteer:
    No I do not currently volunteer
    All well - if you are privately funded, and don't need to keep donors happy. A bit harder if those donors feel like they're being asked to give unquestioningly, but then being told less than the whole truth in return.
     
    MattA, Sheff, twr12 i 5 ostalih se sviđa ovo.

Podijelite ovu stranicu