If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

30777 to be overhauled

Discussion in 'Steam Traction' started by 5944, Jul 22, 2020.

  1. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Work on 777 had been paused whilst there was a possible asbestos investigation. Now work has been restarted but the bogie is still not replaced under the tender. I think the boiler work has been done in terms of rivetting, but it still needs all the small and large tubes to be installed.
     
    MattA, 3ABescot and CH 19 like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed, the tender is still awaiting its front bogie to be put in place, there is more work being done on the chassis., there is no motion, valves or pistons in place.
     
    Johnme101 and Haighie like this.
  3. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the boiler outside and rest of the locomotive inside the shed.
    IMG20240811102611_BURST000_COVER.jpg IMG20240811102019.jpg
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more work done on the chassis, between the frames, so steady progress - with the hope that it may be in steam in the latter part of next year.
     
    CH 19, alts1985, clinker and 2 others like this.
  5. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is a view of the other side of the boiler.

    DSC03805.JPG
     
  6. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more prepping and painting of the frames and the motion has been cleaned but not installed. Work has been done on the piston valves, but no rings fitted yet. The front tender bogie looks complete but is still in front of the tender. Work has been done on the brake brackets.
     
  7. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interestingly in the latest issue of MainLine there is to be a "Sir Lamiel" centenary event on June 21st. The frames have been prepped and painted with much of the motion ready to be put back on. The boiler is due to have its tubes fitted soon. Could it be steaming in the Summer?
     
    Johnme101 and The Gricing Owl like this.
  8. JR4489

    JR4489 New Member

    Joined:
    Sep 2, 2022
    Messages:
    30
    Likes Received:
    76
    Gender:
    Male
    Location:
    Cambs
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very unlikely, unfortunately. The boiler needs to have 2 rows of roof stays replaced, which requires the removal of 2 sections of boiler plate to access the stays. The tender needs lifting so that the rear bogie can be taken out and overhauled. See latest update here:
    https://www.sirlamiel.org.uk/2024/12/02/october-2024/

    Current estimate for a return to service (according to the latest 5305LA newsletter) is spring 2026.
     
    Bluenosejohn likes this.
  9. The Gricing Owl

    The Gricing Owl Well-Known Member

    Joined:
    Sep 29, 2023
    Messages:
    1,211
    Likes Received:
    2,241
    Gender:
    Male
    Occupation:
    Owl and SR steam gricer
    Location:
    Near steam Man of Kent and Golden Arrow route
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To emerge as 30777? :):):):):)

    Bryan B
     
  10. The Green Howards

    The Green Howards Nat Pres stalwart

    Joined:
    Feb 20, 2016
    Messages:
    15,133
    Likes Received:
    8,693
    Occupation:
    Layabout
    Location:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not sure it could come out as anything else if it's going to be in BR Green? I mean, if it was in Malachite it could carry either a SR or BR identity...
     
    mike1522 and The Gricing Owl like this.
  11. Swan Age

    Swan Age Member

    Joined:
    Sep 8, 2005
    Messages:
    955
    Likes Received:
    278
    Gender:
    Male
    Location:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting that they have to cut open the boiler again, to replace the crown stays. It seems a drastic measure.

    Is the boiler of fundamentally different design to those others remaining in preservation fitted to the S15's both Urie and Maunsell types.

    Im sure that when the Urie group did a comprehensive rebuild of 506's boiler at Ropley they managed to replace the crown stays from inside the boiler barrel using a fabricated tool to get access to them. It wasn't easy mind from what I remember from the report by the guys that did it.
     
  12. Steve

    Steve Resident of Nat Pres Friend

    Joined:
    Oct 7, 2006
    Messages:
    12,812
    Likes Received:
    12,007
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I seem to recall the same was done with 825’s boiler when the front sling stays were done. The alternative is to gut the boiler. It’s not a big job to cut a couple of access holes and then replace them.
     
    Swan Age likes this.
  13. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed but has had more work done in preparation for the tubes to be fitted. It now looks smarter with the firebox painted as well.
    DSC04190.JPG
     
  14. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,854
    Likes Received:
    1,655
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Arevthose the 'crinolines' for the cladding ? not much room for insulation is there....
     
  15. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,044
    Likes Received:
    6,446
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Inside the shed, the motion for Sir Lamiel is now refurbished and placed next to the wheels - so possibly re-assembled soon? The tender is now back on both bogies.
    I wonder what it will look like on June 21st which is Sir Lamiel's centenary day?
     
  16. JR4489

    JR4489 New Member

    Joined:
    Sep 2, 2022
    Messages:
    30
    Likes Received:
    76
    Gender:
    Male
    Location:
    Cambs
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I'm fairly certain the tender will need to be lifted again as I believe the rear bogie needs to be overhauled and have the tyres turned. The front bogie was completed a few months ago but we've been waiting for our turn with the jacks.

    The boiler has been inspected recently and a few broken stays were found. There are also 4 rows of roof stays which need replacing.

    For the centenary, the plan is to have the frames and tender on display in the shed.

    The 5305 group has been focussed on getting 33116 finished recently so more attention is being diverted to 30777 now. We're always on the look out for new members and volunteers if anyone is interested!

    Regular updates can be found at https://www.sirlamiel.org.uk/latest-news/ or on the 5305LA Facebook page.
     

Share This Page