    Work on 777 had been paused whilst there was a possible asbestos investigation. Now work has been restarted but the bogie is still not replaced under the tender. I think the boiler work has been done in terms of rivetting, but it still needs all the small and large tubes to be installed.
     
    MattA, 3ABescot and CH 19 like this.
  2. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed, the tender is still awaiting its front bogie to be put in place, there is more work being done on the chassis., there is no motion, valves or pistons in place.
     
    Johnme101 and Haighie like this.
  3. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Here is the boiler outside and rest of the locomotive inside the shed.
    IMG20240811102611_BURST000_COVER.jpg IMG20240811102019.jpg
     
  4. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more work done on the chassis, between the frames, so steady progress - with the hope that it may be in steam in the latter part of next year.
     
    CH 19, alts1985, clinker and 2 others like this.
  5. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    This is a view of the other side of the boiler.

    DSC03805.JPG
     
  6. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    There has been more prepping and painting of the frames and the motion has been cleaned but not installed. Work has been done on the piston valves, but no rings fitted yet. The front tender bogie looks complete but is still in front of the tender. Work has been done on the brake brackets.
     
  7. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Interestingly in the latest issue of MainLine there is to be a "Sir Lamiel" centenary event on June 21st. The frames have been prepped and painted with much of the motion ready to be put back on. The boiler is due to have its tubes fitted soon. Could it be steaming in the Summer?
     
    Johnme101 and The Gricing Owl like this.
  8. JR4489

    JR4489 New Member

    Joined:
    Sep 2, 2022
    Messages:
    29
    Likes Received:
    71
    Gender:
    Male
    Location:
    Cambs
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Very unlikely, unfortunately. The boiler needs to have 2 rows of roof stays replaced, which requires the removal of 2 sections of boiler plate to access the stays. The tender needs lifting so that the rear bogie can be taken out and overhauled. See latest update here:
    https://www.sirlamiel.org.uk/2024/12/02/october-2024/

    Current estimate for a return to service (according to the latest 5305LA newsletter) is spring 2026.
     
    Bluenosejohn likes this.
  9. The Gricing Owl

    The Gricing Owl Well-Known Member

    Joined:
    Sep 29, 2023
    Messages:
    1,035
    Likes Received:
    1,960
    Gender:
    Male
    Occupation:
    Owl and SR steam gricer
    Location:
    Near steam Man of Kent and Golden Arrow route
    Heritage Railway Volunteer:
    No I do not currently volunteer
    To emerge as 30777? :):):):):)

    Bryan B
     
  10. The Green Howards

    The Green Howards Nat Pres stalwart

    Joined:
    Feb 20, 2016
    Messages:
    15,102
    Likes Received:
    8,632
    Occupation:
    Layabout
    Location:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Not sure it could come out as anything else if it's going to be in BR Green? I mean, if it was in Malachite it could carry either a SR or BR identity...
     
    mike1522 and The Gricing Owl like this.
  11. Swan Age

    Swan Age Member

    Joined:
    Sep 8, 2005
    Messages:
    950
    Likes Received:
    270
    Gender:
    Male
    Location:
    21C101 in the South West
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Interesting that they have to cut open the boiler again, to replace the crown stays. It seems a drastic measure.

    Is the boiler of fundamentally different design to those others remaining in preservation fitted to the S15's both Urie and Maunsell types.

    Im sure that when the Urie group did a comprehensive rebuild of 506's boiler at Ropley they managed to replace the crown stays from inside the boiler barrel using a fabricated tool to get access to them. It wasn't easy mind from what I remember from the report by the guys that did it.
     
  12. Steve

    Steve Resident of Nat Pres Friend

    Joined:
    Oct 7, 2006
    Messages:
    12,729
    Likes Received:
    11,847
    Occupation:
    Gentleman of leisure, nowadays
    Location:
    Near Leeds
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I seem to recall the same was done with 825’s boiler when the front sling stays were done. The alternative is to gut the boiler. It’s not a big job to cut a couple of access holes and then replace them.
     
    Swan Age likes this.
  13. Flying Phil

    Flying Phil Part of the furniture

    Joined:
    Dec 10, 2018
    Messages:
    3,018
    Likes Received:
    6,318
    Gender:
    Male
    Location:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The boiler is still outside the shed but has had more work done in preparation for the tubes to be fitted. It now looks smarter with the firebox painted as well.
    DSC04190.JPG
     
  14. class8mikado

    class8mikado Part of the furniture

    Joined:
    Jun 1, 2009
    Messages:
    3,840
    Likes Received:
    1,644
    Occupation:
    Print Estimator/ Repository of Useless Informatio.
    Location:
    Bingley W.Yorks.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Arevthose the 'crinolines' for the cladding ? not much room for insulation is there....
     

Share This Page