If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

Tornado

الموضوع في 'Steam Traction' بواسطة Leander's Shovel, بتاريخ ‏20 اكتوبر 2007.

  1. Spamcan81

    Spamcan81 Nat Pres stalwart

    إنضم إلينا في:
    ‏25 أوت 2007
    المشاركات:
    35,831
    عدد المعجبين:
    22,269
    الوظيفة:
    Training moles
    مكان الإقامة:
    The back of beyond
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Just how big is that axe that you are grinding?
     
    acorb, Steve, Haighie و 3 آخرون معجبون بهذا.
  2. MellishR

    MellishR Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏16 إبريل 2009
    المشاركات:
    8,911
    عدد المعجبين:
    5,847
    Have we had a definitive explanation of how the boiler had changed to necessitate turning down the tyres? There have been mutterings about something being out of square, but is that established fact or rumour? Turning down the tyres for one period of operation may have been the "least worst" immediate solution, and a likely medium-term solution will be to use one of the new boilers, which surely ought to be available after another three years. But long term?
     
    Sheff و Bikermike معجبون بهذا.
  3. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How am I "knocking the trust"?
    Why are they not answering covenantor enquiries?
    How much have they spent on abortive works?
    Why was the boiler run out of square?

    How long has the East Lancs been in the diary for?
    When did the WVR deal come up?
    How much has been comitted to low-loaders etc?

    Remember these aren't amateurs doing it in their spare time, these are (highly) paid people holding themselves out to have expertise.

    This deal is at best salvaging something from a situation that is almost entirely of matters under their control (and yes, defective workmanship by contractors is under their control). Failing to replace engineering expertise certainly is. At worst, it's a dash for new funding to appease who they can and ignore those they can't. Which could bite them when the deal is over or is subject to a number of very obvious risks.

    Now, how is that "knocking"? Refusing to take on trust glib answers yes, knocking, no.
     
    Sir Ralph Wedgwood, MellishR, 35B و 3 آخرون معجبون بهذا.
  4. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    How much are you willing to avoid asking difficult questions?
     
    أعجب بهذه المشاركة Sheff
  5. 60017

    60017 Resident of Nat Pres Friend

    إنضم إلينا في:
    ‏6 جويلية 2008
    المشاركات:
    9,102
    عدد المعجبين:
    8,071
    الجنس:
    ذكر
    الوظيفة:
    Retired from corporate slavery :o)
    مكان الإقامة:
    Fylde Coast
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When I first saw her like this...it warmed my heart. Like many I'm sure, it reminds us of happy childhoods, spotting at Doncaster & York on day trips from Lancs!

    IMG_1409ers.jpg
     
    Victor, torgormaig, Johnme101 و 7 آخرون معجبون بهذا.
  6. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    There has been no official confirmation, but up-thread it seems that it is accepted that the firebox was significantly out of square. It's certainly not run on the mainline since the tyres, but I'm not sure about on preserved lines. Sheff has more details IIRC.
     
    أعجب بهذه المشاركة Sir Ralph Wedgwood
  7. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    The out of square firebox has never been confirmed, but it does have an air of plausibility.
    If the boiler was changed in the future to one of the new ones, and assuming they are square, then the problem goes away and Tornado could be retyred without issue (if required).
    I would assume that the out of square boiler will eventually go back to Germany for some major reconstruction work to get it back to design spec.
     
    MellishR, 35B و 60017 معجبون بهذا.
  8. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The devil is in the detail.
    "This is a major, positive step, and follows the registration documentation and certification being completed at the end of February."
    Which makes you wonder at all the previous promises
    "On arrival at Carnforth the locomotive will be fully examined and if all is well it will be prepared for its loaded test run. Clearly this is subject to a successful light engine test run and completion of appropriate audit and acceptance activities with WCR."
    So it's "on approval"
    "Considering this timeline and the potential risk involved"
    Their words, not mine...
    , we have agreed with the East Lancashire Railway (ELR) to postpone the visit scheduled for this month. This is not something we do lightly, especially after such a long time out of operation, but it is important that we ensure Tornado is properly tested and available for the 2025 season and is operated with confidence"
    I.e. which would suggest there is limited confidence in the work done to date.

    If they were frantically putting it back together in Feb, it suggests that the programme is out of the window again, and that they were working to hit this WCR deadline with the ELR as a back-up plan? Did the ELR know that?
     
    Sir Ralph Wedgwood و Sheff معجبون بهذا.
  9. GWR4707

    GWR4707 Nat Pres stalwart

    إنضم إلينا في:
    ‏12 ماي 2006
    المشاركات:
    19,232
    عدد المعجبين:
    17,566
    الجنس:
    ذكر
    مكان الإقامة:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Plus at some stage in this schedule its needs a coat of paint which is hardly a couple of hours with a roller....

    Plus do people really think that WCR would have blindly entered into this contract with literally no idea of the locomotives condition, certification or fitness to run I know by executing a A1SLT x WCR tie up its created the ultimate bogey man in many peoples eyes, but purlease ????
     
    Spitfire, Johnme101, Steve و 7 آخرون معجبون بهذا.
  10. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Who's saying that?
     
  11. ghost

    ghost Part of the furniture

    إنضم إلينا في:
    ‏29 ماي 2006
    المشاركات:
    4,303
    عدد المعجبين:
    5,727
    الجنس:
    ذكر
    مكان الإقامة:
    N.Ireland
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are reading way too much into that statement. That's a standard response to any enquiry for a loco which is newly overhauled.
     
  12. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Were it a standard situation, I'd agree with you. How many times have they promised it to be ready (and encouraged booking of rail tours on a definite basis) already?
     
    MellishR و Sheff معجبون بهذا.
  13. misspentyouth62

    misspentyouth62 Well-Known Member

    إنضم إلينا في:
    ‏8 نوفمبر 2017
    المشاركات:
    1,717
    عدد المعجبين:
    2,221
    الجنس:
    ذكر
    مكان الإقامة:
    34D, now flexible
    Heritage Railway Volunteer:
    No I do not currently volunteer
    a chance encounter this morning at Peterborough.
    DSC_8492.JPG
     
    Victor, Haighie, Johnme101 و 6 آخرون معجبون بهذا.
  14. Flying Phil

    Flying Phil Part of the furniture

    إنضم إلينا في:
    ‏10 ديسمبر 2018
    المشاركات:
    3,018
    عدد المعجبين:
    6,318
    الجنس:
    ذكر
    مكان الإقامة:
    Leicestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    What is being forgotten by some is the huge amount of work done that was needed to install the latest signalling/control systems into Tornado - and it being the first such installation. Obviously it made sense to do this work whilst the engine was being overhauled - but there was a total underestimation of exactly how much work and extra equipment/alteration/adaptation would be needed. Added to the firebox dimensional change and the new tyres ( which I'm sure will have at least 8 years of mainline use) it has been a nightmare scenario. Yes, the Trust were wrong to arrange dates/venues in the hope that the locomotive would be finished....but these are put in place well beforehand and situations change. The locomotive has run on the GCR and NVR and now on the mainline so there is steady progress.
     
  15. Johnb

    Johnb Nat Pres stalwart

    إنضم إلينا في:
    ‏3 ديسمبر 2014
    المشاركات:
    15,537
    عدد المعجبين:
    18,383
    الجنس:
    ذكر
    الوظيفة:
    Retired, best job I've ever had
    مكان الإقامة:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I think we all understand the complexities involved, what isn’t acceptable is the Trust’s supporters being lied to.
     
    TheModster, MellishR, silversteellady و 6 آخرون معجبون بهذا.
  16. The Green Howards

    The Green Howards Nat Pres stalwart

    إنضم إلينا في:
    ‏20 فبراير 2016
    المشاركات:
    15,102
    عدد المعجبين:
    8,632
    الوظيفة:
    Layabout
    مكان الإقامة:
    My settee, mostly.
    Heritage Railway Volunteer:
    No I do not currently volunteer
    On my drive to work this morning I saw steam rising at Orton Mere. Currently 7 down on its way to Carnforth :)
     
    أعجب بهذه المشاركة misspentyouth62
  17. Kylchap

    Kylchap Member

    إنضم إلينا في:
    ‏15 ديسمبر 2015
    المشاركات:
    492
    عدد المعجبين:
    935
    الجنس:
    ذكر
    مكان الإقامة:
    East Anglia
    Heritage Railway Volunteer:
    No I do not currently volunteer
    As a long time covenantor and sponsor of "clubs", I've been as disappointed as anyone about what has been going on with the Trust, but let's cut back to basics. Like many others, I coughed up several thousands because I wanted to see an A1 built and operational on the main line. That has happened. I want to see it continue to operate. I lack confidence that A1SLT has the competence to do that, so a link up with WCRC that enables the loco to operate is good news to me. The alternative is probably that it sits in the shed at Darlington.

    Then there is the P2. Does anyone have confidence that the Trust, in its current incarnation, can progress the build to successful completion, even if they had the money? I don't. Unless the Trust is somehow reformed, the best hope of seeing an operational P2 in my lifetime would be if a different, more competent organisation would take it on. That might enable the Trust to get its finances in order and concentrate on what seems to be its main interest at present - establishing a railway museum and a site for turning and servicing visiting railtours.
     
  18. Bikermike

    Bikermike Well-Known Member

    إنضم إلينا في:
    ‏11 مارس 2020
    المشاركات:
    1,814
    عدد المعجبين:
    2,045
    الجنس:
    ذكر
    مكان الإقامة:
    Thameslink territory
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm not sure I'd describe the process as steady...

    Things do get booked in advance, so they can be cancelled in advance too. It's now, what, 18 months after they started being delayed? To miss one deadline may be regarded as a misfortune; to miss 6(?) looks like carelessness (to misquote Lady Bracknell)...

    Things do happen, and that would be fine, but there hasn't been one iota of contrition or explaination. I don't know who wrote the latest release, but to keep a straight face whilst writing about not cancelling lightly must have been some effort.

    No one has forgotten how much work the new installation has taken as they've told is in great detail, whilst deafening silence reigned on the boiler, the ashpan, the grate etc.

    Short of actually putting a press release saying "we're not telling you the whole story", I'm not sure how their comms could give a less convincing projection.

    I don't recall anyone else's firebox just popping out of square to the extent it doesn't fit... and certainly not bodging it back in. Especially not on a nearly-new engine.
     
    Sir Ralph Wedgwood, MellishR, Sheff و 1 شخص آخر معجبون بهذا.
  19. NathanP

    NathanP Member

    إنضم إلينا في:
    ‏4 مارس 2017
    المشاركات:
    886
    عدد المعجبين:
    1,041
    الجنس:
    ذكر
    مكان الإقامة:
    Worcester
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I'm not a covenantor (I supported them by going on the tours instead) but I've been on their mailing list for years and, in the days of Mark Allatt, used to get regular detailed emails about what was going on. Haven't had one for quite some time now. Complete silence. I'm not on Facebook anymore so, were it not for this forum, I would have no idea the loco was back on the mainline.
     
    Sir Ralph Wedgwood, MellishR, Sheff و 1 شخص آخر معجبون بهذا.
  20. DismalChips

    DismalChips Member

    إنضم إلينا في:
    ‏11 إبريل 2016
    المشاركات:
    682
    عدد المعجبين:
    715
    مكان الإقامة:
    9A
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I did think it was a bit cavalier going back out on to the mainline without a diesel on the rear just in case, but judging by the videos on Facebook I needn't have worried.
     

مشاركة هذه الصفحة