Rother Valley Railway

Discuție în 'Heritage Railways & Centres in the UK' creată de nine elms fan, 4 Noi 2012.

  1. burnham-t

    burnham-t New Member

    Înscris:
    26 Feb 2008
    Mesaje:
    146
    Aprecieri primite:
    129
    Sex:
    Masculin
    Locație:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    As I understand it, there was a limited amount of upgrading done during the early part of WW2 with a view to enabling the K&ESR to be used as a diversionary route. I've not seen details of any such use (not so say it didn't take place under the stress of war). Steam operations on the original Rother Valley section relied on Terriers and the equivalent until closure in 1961, so there was no general increase in permitted axle load. The Army had rail mounted guns and Dean Goods 060s based at Rolvenden and Wittersham Road in the early part of the war and may have wanted track improvements to support that operation
    In later years, some of the line had steel sleepered track (salvaged from the Elham Valley) but I don't know whether that was laid during WW2 or later.
     
    jnc, H Cloutt și DavidW apreciază asta.
  2. Breva

    Breva Part of the furniture

    Înscris:
    11 Oct 2010
    Mesaje:
    2.505
    Aprecieri primite:
    4.266
    Locație:
    Gloucestershire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tony's trattatoria in tenterden high street :D
     
  3. simon

    simon Resident of Nat Pres

    Înscris:
    26 Iun 2006
    Mesaje:
    12.077
    Aprecieri primite:
    5.808
    I believe that if you look hard enough, you can find the occasional spaghetti tree and with global warming some of them are now fruiting.
     
    Romsey, Wenlock, Jamessquared și alți 5 apreciază asta.
  4. martin1656

    martin1656 Guest

    At least they didn't leave a surprise for the next occupiers of their camp, like one German POW in one camp, did, he made a lovely flower bed, took great care over it, and the commandant was very impressed with him, until next summer when it bloomed, and reveled his handywork, a very neatly done Swastika.
     
    Mark Thompson, jnc și H Cloutt apreciază asta.
  5. clinker

    clinker Member

    Înscris:
    8 Oct 2016
    Mesaje:
    689
    Aprecieri primite:
    409
    Sex:
    Masculin
    Locație:
    romford
    Heritage Railway Volunteer:
    No I do not currently volunteer


    Similar tale down on the RHDR when Italian POW's tended the flower beds at New Romney and when the Crocuses (Crocii?) bloomed they spelt out 'Il Duce'
     
    Wenlock și H Cloutt apreciază asta.
  6. Mark Thompson

    Mark Thompson Well-Known Member

    Înscris:
    10 Sep 2017
    Mesaje:
    1.776
    Aprecieri primite:
    4.358
    Sex:
    Masculin
    Locație:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Haha! Its perfectly understandable, the bloody-mindedness on both sides. Although it seems like the Italians were just glad to be out of it, and doing something constructive.
     
    barnsley2857, jnc și H Cloutt apreciază asta.
  7. Howard B

    Howard B New Member

    Înscris:
    6 Iun 2021
    Mesaje:
    18
    Aprecieri primite:
    18
    Sex:
    Masculin
    Locație:
    Potton, Bedforshire
    Heritage Railway Volunteer:
    No I do not currently volunteer
    The Elham valley line didn't start closing until late 1947 & was still partly intact in 1953 as the rails were still being recovered. While the track was sent to the KESR it would have been after the war.
     
    burnham-t și H Cloutt apreciază asta.
  8. Miff

    Miff Part of the furniture Friend

    Înscris:
    17 Iun 2008
    Mesaje:
    3.161
    Aprecieri primite:
    3.314
    The bridge works were done after the end of the war, in ‘46. There were so many POWs it was not until ‘48 that all were repatriated.
     
    Last edited: 10 Aug 2025
    burnham-t și Mark Thompson apreciază asta.
  9. paul1609

    paul1609 New Member

    Înscris:
    9 Iun 2006
    Mesaje:
    108
    Aprecieri primite:
    174
    Sex:
    Masculin
    Locație:
    Wittersham, Isle of Oxney
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Tom,
    As I understand it the track that came from the Elham Valley was the ex SECR 91 1/4lb bullhead rail which was laid in the early 1950s. This had wooden sleepers and keys. All the fixtures were non standard, fishplates, bolts etc as it had been designed for the head to be rotated. Chair wear on the bottom of the rail meant that this was never carried out. This rail upon preservation extended from about 1/2 mile south of Rolvenden to just past Mill Ditch Bridge about a mile east of Bodiam. The last stretch of 91 1/4lb lasted until the 21st Century when Lamings slip near Rolvenden was relaid. When a large amount of it was removed during the Northiam to Bodiam rebuilding a lot of the fishplates and bolts were actually rescued by one of the mainline engineering companies for use in Ashford yard.
    The steel sleepers were on the standard 95lb BR bullhead they extended about a mile from Mill Ditch Bridge around Padghams curve. They used standard BR steel keys. On the approach to Bodiam it changed back to wooden sleepers. The section just beyond Bodiam to Robertsbridge was before my time. I think the steel sleepers were actually new and experimental. I think a few of them still survive in Wittersham Yard.
     
  10. mikehartuk

    mikehartuk New Member

    Înscris:
    29 Iun 2007
    Mesaje:
    131
    Aprecieri primite:
    709
    Sex:
    Masculin
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks Paul

    The BR drawings show just over 1/2 mile of the pressed steel 95lb BH sleeper were installed from east of Salehurst Halt as far as Junction Road siding - see attached photo dated 1954 showing them at the J Road end. In fact when the line was lifted for scrap in the 1970's a good number were purchased by the K&ESR preservation society and are those you mention that were installed a few years later on the Mill Ditch Bridge around Padghams curve section (between Rolvenden - Wittersham station). Mike
     

    Fișiere atașate:

    Mark Thompson, burnham-t, Copper-capped și alți 2 apreciază asta.
  11. burnham-t

    burnham-t New Member

    Înscris:
    26 Feb 2008
    Mesaje:
    146
    Aprecieri primite:
    129
    Sex:
    Masculin
    Locație:
    Staplehurst, Kent
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    Thanks for clarifying things, both.
     
    H Cloutt apreciază asta.
  12. Mark Thompson

    Mark Thompson Well-Known Member

    Înscris:
    10 Sep 2017
    Mesaje:
    1.776
    Aprecieri primite:
    4.358
    Sex:
    Masculin
    Locație:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    2 brief updates, one on Playfoot's snagging work at Austen's Bridge, the second about logistics at Robertsbridge, regarding the welding up of rail into 60' lengths:
    http://rvrailway.blogspot.com/?m=1
     
    DavidW și H Cloutt apreciază asta.
  13. H Cloutt

    H Cloutt Well-Known Member

    Înscris:
    22 Dec 2018
    Mesaje:
    1.072
    Aprecieri primite:
    1.553
    Sex:
    Masculin
    Locație:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Austen's Bridge looking really great following the repair and loads of piant.
     
    DavidW și Mark Thompson apreciază asta.
  14. Mark Thompson

    Mark Thompson Well-Known Member

    Înscris:
    10 Sep 2017
    Mesaje:
    1.776
    Aprecieri primite:
    4.358
    Sex:
    Masculin
    Locație:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    Still those cruelly excoriated upstands to be dealt with, although compared to what else has had to be done, that's almost cosmetic.
     
    H Cloutt apreciază asta.
  15. H Cloutt

    H Cloutt Well-Known Member

    Înscris:
    22 Dec 2018
    Mesaje:
    1.072
    Aprecieri primite:
    1.553
    Sex:
    Masculin
    Locație:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    DavidW apreciază asta.
  16. martin1656

    martin1656 Guest

    Real concrete signs of progress, , perhaps once bridge 25 is in, an comparison photo of how the formation was when purchased, and how it is now to show the amount of progress so far thats been achieved will be possible?
     
    alastair, H Cloutt, Miff și încă o persoană apreciază asta.
  17. H Cloutt

    H Cloutt Well-Known Member

    Înscris:
    22 Dec 2018
    Mesaje:
    1.072
    Aprecieri primite:
    1.553
    Sex:
    Masculin
    Locație:
    Battle
    Heritage Railway Volunteer:
    No I do not currently volunteer
    That would be interesting.
     
  18. Mark Thompson

    Mark Thompson Well-Known Member

    Înscris:
    10 Sep 2017
    Mesaje:
    1.776
    Aprecieri primite:
    4.358
    Sex:
    Masculin
    Locație:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
  19. MellishR

    MellishR Resident of Nat Pres Friend

    Înscris:
    16 Apr 2009
    Mesaje:
    9.264
    Aprecieri primite:
    6.111
    The statement "This supply is an excellent example of how we can work with smaller UK customers to provide a flexible and scalable solution to meet their needs" leaves unclear whether the rails have been supplied free of charge, at a discount, or at normal price.
     
    H Cloutt apreciază asta.
  20. Mark Thompson

    Mark Thompson Well-Known Member

    Înscris:
    10 Sep 2017
    Mesaje:
    1.776
    Aprecieri primite:
    4.358
    Sex:
    Masculin
    Locație:
    E sussex
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I wouldn't have thought that "free of charge" would exactly be promoting a good business model
     
    H Cloutt apreciază asta.