If you register, you can do a lot more. And become an active part of our growing community. You'll have access to hidden forums, and enjoy the ability of replying and starting conversations.

RTC 2026

Rasprava u 'What's Going On' pokrenuta od 2857Harry, 13. Kolovoz 2025..

  1. RalphW

    RalphW Nat Pres stalwart Staff Member Administrator Friend

    Pridružen(a):
    11. Rujan 2005.
    Poruka:
    37,591
    Lajkova:
    10,702
    Spol:
    Muškarac
    Interesi:
    Retired-ish, Part time rail tour steward.
    Grad:
    Northwich
    Heritage Railway Volunteer:
    No I do not currently volunteer
    I can't comment as I know nothing about that.
     
  2. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    16,820
    Lajkova:
    20,930
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    It’s not a correct description though and it’s important for the crew to know how the braking system works. If we take a Bulleid Pacific as an example, the air will come on a tad before the vacuum with the steam brake on the engine last. If the engine just has an airbraked support coach in tow any fierce braking could cause the wheels to lock resulting flats. LNER and GWR engines are all vacuum so the same applies, I’m not sure about how the all steam braked LMS and BR Standard locos are set up.
     
  3. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    16,820
    Lajkova:
    20,930
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    You are correct, 5593 is an earlier engine with a short firebox vertical throatplate boiler. The boilers won’t be interchangeable without modifying the frames. Some engines were modified in this way to speed up overhauls but not 5593. The later long firebox boilers were fitted from 5654 onwards.
     
  4. GWR4707

    GWR4707 Nat Pres stalwart

    Pridružen(a):
    12. Svibanj 2006.
    Poruka:
    20,146
    Lajkova:
    19,245
    Spol:
    Muškarac
    Grad:
    Cumbria
    Heritage Railway Volunteer:
    No I do not currently volunteer
    When, there are photos of her still at Carlisle this AM, one would assume she will need a careful inspection in the light before any decision re recovery via rail or road?
     
  5. neildimmer

    neildimmer Resident of Nat Pres

    Pridružen(a):
    6. Lipanj 2008.
    Poruka:
    10,152
    Lajkova:
    1,635

    Thanks, when I posted that message I had no knowledge it was still at Carlisle
     
  6. acorb

    acorb Part of the furniture

    Pridružen(a):
    17. Srpanj 2007.
    Poruka:
    3,856
    Lajkova:
    6,889
    Grad:
    Powys
    Very limited use since 2023 as well, so hopefully she can come back with a completely new ticket.
     
  7. MellishR

    MellishR Resident of Nat Pres Friend

    Pridružen(a):
    16. Travanj 2009.
    Poruka:
    9,563
    Lajkova:
    6,358
    Anyone know how (a) the train and (b) the loco were moved?
     
  8. Rander

    Rander Member

    Pridružen(a):
    24. Veljača 2007.
    Poruka:
    457
    Lajkova:
    232
    Reported that Kirtlebridge - Carlisle was undertaken at 20mph last night with 47746 on the rear propelling. 57314 went on the front at Carlisle.

    47804 en route to Carlisle now to recover 45699.
     
  9. twr12

    twr12 Well-Known Member

    Pridružen(a):
    2. Rujan 2007.
    Poruka:
    1,852
    Lajkova:
    1,089
    The requirements for dual braking of locomotives are set out in BR document:
    MT31 Specification of Brake Equipment for Air Braked & Dual Braked Main Line Locomotives.
    This document was published in 1970 and is still current.

    MT31 specifies in great detail installation and performance requirements. Eg: capacity of main reservoir, material, bore and wall thickness of pipework, distance between pipe clips. Compressor performance, proportionality of air/vacuum relay valve.

    The air brake fitted LMS locos, eg 45407 & 44871; have the same Westinghouse M8 auto air brake valve as your own 35028. And a air/vacuum relay valve to control the vacuum train pipe in proportion to the auto air brake pipe. Control of the steam brakes on loco and tender remaining with the standard LMS vacuum brake valve.
     
  10. Johnb

    Johnb Nat Pres stalwart

    Pridružen(a):
    3. Prosinac 2014.
    Poruka:
    16,820
    Lajkova:
    20,930
    Spol:
    Muškarac
    Interesi:
    Retired, best job I've ever had
    Grad:
    Buckinghamshire
    Heritage Railway Volunteer:
    Yes I am an active volunteer
    I knew that but I didn’t know how the braking sequence was set up. I assume there must be some reason why the owners of 6233 and 60103 converted the engine to air braking dispensing with the part of the original design. At least have retained a vacuum ejector to work on heritage lines
     

Podijelite ovu stranicu